APSEB division
Government of Andhra Pradesh realizing the declining tendency of the financial position of APSEB and considering the recommendations made by committee it was unbundled into Andhra Pradesh Power Generation Corporation (APGENCO) & Transmission Corporation of Andhra Pradesh Limited (APTRANSCO) on 1 February 1999 by AP Electricity REFORMS ACT.
APTRANSCO was further unbundled w.e.f. 1 April 2000 into "Transmission Corporation" and four "Distribution Companies" (DISCOMS). From Feb 1999 to June 2005 APTransco remained as single buyer in purchasing and selling of power to DISCOMs.
Power plants
The total installed capacity of APGENCO, after the state's bifurcation is 6389 MW comprising 4210 MW Thermal, 1747.60 MW Hydro and 405.40 MW Solar
power plants. The Power Plants of APGENCO include thermal, hydel, Pumped Storage and solar power plants.
Read the full text
Thermal projects
Note:Damoadaram Sanjeevaiah Thermal Plant (3x800 MW) is having subsidiary ownership of APGENCO.
Hydel projects
Hydel projects (under construction)
Non-conventional units
Source: Power Stations of AP after bifurcation into APGENCO and TGGENCO
Operational performance
Though the performance of APGenCo thermal power stations in terms of reliability, availability and maintainability (RAM analysis) is one of the best in India, its hydro power stations performance is satisfactory.monsoon season. The thermal efficiency (heat rate) of thermal power stations is quite remarkable. Operating the thermal power stations in the range of 75 to 100% capacity in 'frequency follow mode' with good part load efficiency is the needful strategy in surplus electricity grid except during peak demand hours. Also Hydro power stations should perform well meeting all the functions such as power factor correction, peaking power generation, pumping water in pump mode and secondary power generation during monsoon season utilising total available water. This can be achieved by maintaining hydro power stations at availability more than 95%.