The story
Jordan had two connected but non-contiguously operated sections of the 1908 Ottoman Hejaz Railway that still exist:
From Jiza, south of Jordan to Amman and then to Damascus, as the "Hejaz Jordan Railway". The northern part of the train connecting Amman to Damascus ceased to operate due to the Syrian Civil War.
From phosphate mines near Ma'an to the Gulf of Aqaba as the "Aqaba Railway". Aqaba Railway ceased operations in 2018 after the transport of phosphate was moved to a different terminal in Port of Aqaba
In the 2000s, Jordanian government began acquiring land for new rail routes. Following a study by BNP Paribas, three routes were planned, which were expected to be tendered later in 2010. The three routes were:
From the Syrian border, via Zarqa, to the Saudi border; replacing part of the Hejaz Railway;
Connecting the first line to Aqaba, and from Mafraq to Irbid, replacing another part of the Hejaz railway;
A link to the Iraqi border.
However, in late 2010, the government announced an economic relief package and following the 2011 Jordanian protests it was decided to reduce the expected three-year capital investment plan in the national railway network by 72 percent, partly to fund the relief package.
Read the full text
In August 2011, the Jordanian government approved the construction of the railway from Aqaba to the Iraqi border (near Trebil). Iraq started the construction of the line from the border to their current railhead at Ramadi.
Jordan planned for a Aqaba-Ma'an railway modernization with the Saudi Jordanian Investment Fund. In 2019 they signed a memorandum of understanding with the Aqaba Special Economic Zone Authority to invest 500 million JD (around $700 million) to redevelop the Aqaba-Ma'an railway alongside building a dry port in Ma'an. It plans to upgrade the gauge from 1050mm as built in 1975 to 1435mm Standard gauge.