The story
History
Before ART's inception, WMATA was the only transit agency that served Arlington County, providing both bus and rail service. Some Metrobus routes served the neighborhoods of Arlington County, connecting them to the Metrorail system. In November 1998, the Arlington County board created the ART service, as part of their effort to improve transportation in the county. ART's first route served Crystal City, while other routes were still operated by Metrobus.
On April 7, 2003, ART began providing Pike Ride routes by introducing ART Route 41. In September of that year, a new service was started along Columbia Pike, known as Pike Ride.
In 2006, ART began increasing service, both by acquiring Metrobus routes and by bringing service to more neighborhoods. Metrobus Route 24P was the first route to be converted to ART, as Route 42. In 2008, the Shirlington Bus Station, also known as the "Shirlington Transit Center", opened in The Village at Shirlington. The Shirlington Transit Center is located on Quincy Street and is located near Shirley Highway (I-395). With the opening of the new bus station, ART and Metrobus began using it as major transfer point. Shirlington Station connects most bus routes to nearby Metrorail stations, as well as the neighborhood of Fairlington. The next year, route 42 was expanded to full week service, replacing the 24P. The GEORGE bus system was originally operated by Metrobus, until the City of Falls Church transferred operations to ART. This bus system served as a feeder to Metrorail stations at the east and west ends of the city. The GEORGE service was ultimately suspended in 2010 due to budget constraints.
In 2014, the Alexandria Transit Company's DASH bus began serving this station with the AT9 route (now Line 36A/B), connecting it to the City of Alexandria between Mark Center and Potomac Yard.
On December 29, 2019, Arlington Transit announced that First Transit commenced a five-year contract to operate the network, ending its partnership with National Express Transit which had operated ART since 2009. ART's operator switch went into effect in order to improve service with the on-time performance.
In August 2022, ART began operating event shuttle services for the annual Arlington County Fair. A month later, the agency began testing electric buses, as part of the plan to go carbon-neutral by 2050.
ART launched a microtransit program in April 2026.
History
In January 2009, ART stopped accepting paper transfers. Riders were required to use a SmarTrip card to get the rail-to-bus discount or to transfer free from bus to bus. Bus-to-bus transfer between ART and Metrobus was made free. Transfers from ART and Metrorail received a $0.50 discount. From September 3, 2013, to April 30, 2023, those attending Arlington Public Schools could obtain an iRide SmarTrip card that provided a discounted fare.
From Wikipedia’s article on Arlington Transit, shared under CC BY-SA 4.0.4
