Private company
Banff, Portsoy and Strathisla Railway
Former railway line in Scotland
The Banff, Portsoy and Strathisla Railway was a Scottish railway company that connected the Aberdeenshire ports of Banff and Portsoy with the main line of the Great North of Scotland Railway (GNoSR) main line at Grange, a place some distance east of Keith. The railway opened in 1859, and was renamed the Banffshire Railway in 1863 when the GNoSR began running services. The company was constantly short of money, and it was absorbed by the GNoSR in 1867.2 Wikipedia text CC BY-SA 4.0
Last updated Oct 21, 2026.
Overview
See how the biggest companies compare on our leaderboards

The Banff, Portsoy and Strathisla Railway was a Scottish railway company that connected the Aberdeenshire ports of Banff and Portsoy with the main line of the Great North of Scotland Railway (GNoSR) main line at Grange, a place some distance east of Keith. The railway opened in 1859, and was renamed the Banffshire Railway in 1863 when the GNoSR began running services.2
Products and brands
Opening and first operation
The line was opened throughout on 30 July 1859, but there was a derailment on opening day, limiting train operation to a single journey. A full service was begun on 2 August. Stations on the line were at Grange, on the GNoSR and managed jointly, Knock, Cornhill, Tillynaught and Ladysbridge, with the terminus at Banff Harbour and at Portsoy.
There were also request stopping places at Millegan, Barry and Ordens. At Grange the branch trains did not run through to and from the GNoSR main line: onward passengers had to change trains. The junction there faced towards Keith. At first, there were three trains daily between Grange and Banff, with connecting trains between Tillynaught and Portsoy. At the time Portsoy was a flourishing and important port town. In addition there were two daily trips between Banff and Portsoy, reversing at Tillynaught.
There is reason to believe that the management of the line was poor: Grant is blunt:
"The line was grossly mismanaged from the start, poor track laying resulting in the first train derailing, with its carriages, down a bank."
Read the full text
Locations
Main line
Portsoy Harbour;
Portsoy; opened 30 July 1859; re-sited when line extended 1 April 1884; closed 6 May 1968;
Tillynaught; opened 1 September 1859; closed 6 May 1968;
Cornhill; opened 30 July 1859; closed 6 May 1968;
Barry; opened 1 October 1859; renamed Glenbarry 19 February 1872; closed 6 May 1968;
Knock; opened 30 July 1859; closed 1 July 1875; reopened 1 September 1875; closed 6 May 1968;
Millegan; opened 1 October 1859; closed 4 November 1867;
Grange; GNoSR station; opened 5 January 1857; closed 6 May 1968.
Banff branch
Banff; opened 30 July 1859, temporary terminus probably near later Golf Club House; replaced by permanent terminus called Banff Harbour 12 April 1860; renamed Banff 1928; closed 6 July 1964;
Golf Club House; opened 1 October 1913; closed 6 July 1964;
Bridgefoot Halt; opened 1 October 1913; closed 6 July 1964;
Ladys Bridge; opened 1 October 1859; renamed Ladysbridge 1886; closed 6 July 1964;
Ordens; opened 1 October 1859; closed 6 July 1964; probably not open continuously;
Tillynaught; above.
Cairnie Junction
Cairnie Junction; opened 1 June 1898 for exchange only, advertised as public station 14 June 1965; closed 6 May 1968.
From Wikipedia’s article on Banff, Portsoy and Strathisla Railway, shared under CC BY-SA 4.0.3
Acquisitions
The desperate financial situation could hardly be allowed to continue, and in 1863 the GNoSR agreed to work the line. From 1 February 1863 it would do so for 60% of receipts, reducing to 50% if receipts reached £7 per mile per week. The arrangement was ratified by the Banffshire Railway Act 1863 (26 & 27 Vict. c. clxx) of 21 July 1863; the opportunity was taken to rename the company to the Banffshire Railway Company. The directors continued in optimism, as the act of Parliament also authorised the company to build from Portsoy westward along the coast to Portgordon, about 14 miles (23 km). Additional capital of £100,000 was permitted, and the GNoSR could subscribe £80,000.
Before that could be contemplated, the operational financial crisis continued, as the profit margin on operations was still not enough to service interest charges on bank loans.
In January 1864, the deputy chairman of the Banffshire Railway wrote to the GNoSR board to state that "through dint of great perseverance" the Banffshire directors had raised guarantees of £20,000 towards construction of the coastal line west from Portsoy, though to go only as far as Buckie. Urging the GNoSR to make a start on the promised construction, the Banffshire bemoaned the fact that traffic was going from the coast on a carrier's carts to the Inverness and Aberdeen Junction Railway station at Fochabers. The GNoSR had its own financial problems, and was mightily sceptical about the Buckie extension (as it had become) and delayed taking action.
The extension to Buckie was not started, but in 1865 the Banffshire Directors cheerfully reported that "the line continues to be satisfactorily worked by the Great North of Scotland Railway".
Read the full text
The Great North of Scotland Railway (Amalgamation) Act 1866 (29 & 30 Vict. c. cclxxxviii) dated 30 July 1866 allowed extension of the time for the construction of the line to Portgordon by one year, but significantly also granted optional powers for amalgamation with the Great North of Scotland Railway.
The Banffshire Railway activated the powers to become absorbed by the GNoSR, and this was ratified by the Great North of Scotland Railway (Further Powers) Act 1867 (30 & 31 Vict. c. cxc) of 12 August 1867. This also authorised the abandonment of the Portgordon line.
From Wikipedia’s article on Banff, Portsoy and Strathisla Railway, shared under CC BY-SA 4.0.3
Links
- WikipediaBanff, Portsoy and Strathisla Railway
- More imagesWikimedia Commons
- WikidataQ4854856
Sources
The numbers on this page point here. Each one links to the record it came from.
- 1
- 2
- 3
- 4