The story
Rail transport in Bangladesh (formerly known as British India and then East Pakistan) began on 15 November 1862, when 53.11 km of 5 ft 6 in (1,676 mm) (broad gauge) line was opened between Darshana in Chuadanga District and Jogotee in Kushtia District. On 1 January 1871, an extension of the Darshana-Jogotee Railway line was made up to Goalanda by Eastern Bengal Railway. On 4 January 1885, a further 14.98 km and 1,000 mm (3 ft 3+3⁄8 in) (metre gauge) line was opened. In 1891, the Bengal Assam Railway was constructed with the assistance of the government and later managed by the Bengal Assam Railway Company.
On 1 July 1895, two sections of metre gauge railway were constructed by English railway companies. One railway connected Chattogram and Comilla, with a distance of 150.6 kilometres (93.6 mi). Another was the connection built between Laksam Upazila and Chandpur, with a distance of 51.2 kilometres (31.8 mi).
In 1947, at the time of the Partition of India, the Bengal Assam Railway was divided into two parts. The 2,603.92 km of track located in East Pakistan came under the control of the central Government of Pakistan. On 1 February 1961, the Eastern Bengal Railway was renamed the Pakistan Eastern Railway. In 1962, control of the Pakistan Eastern Railway was transferred to the Government of East Pakistan. On 9 June 1962, by order of the president, the Pakistan Eastern Railway management was assumed by a Railway Board.
As of 2005, the total length of the Bangladesh Railway is 3,600 kilometres (2,200 mi). It was composed of 1,225 kilometres (761 mi) of broad gauge track (mostly in the western region), 1,600 kilometres (990 mi) of metre gauge track (mostly in the central and eastern regions) and 1,600 kilometres (990 mi) of dual gauge track. In 1998, the Jamuna Bridge was built to connect the previously divided east and west rail networks in dual gauge.
Bangladesh is currently converting its railway system to a dual-gauge system to enable both broad-gauge and meter-gauge trains to run. It is also developing extensive railway transport relations with India. With the Bangladeshi and Indian governments working side by side, at least 9 International Rail Transit Systems (IRTS) have come up presently in Bangladesh. They are as follows: -
Kolkata-Darsana-Iswardi-Dhaka;
Kolkata-Bangaon-Jessore-Khulna;
New Jalpaiguri-Haldibari-Chilahati-Iswardi-Dhaka;
Read the full text
Changrabandha-Burimari-Lalmonirhat-Teesta-Kaunia-Parbatipur;
Parbatipur-Dinajpur-Birol-Radhikapur-Raiganj-Barsoi;
Badarpur-Karimganj-Maishasan-Shabazpur-Kulaura-Sylhet/Chittagong;
Agartala-Akhaura-Dhaka/Chittagong;
Old Malda-Singhabad-Rohanpur-Rajshahi;
Eklakhi-Balurghat-Hili.
While routes 1, 2, 3, 5, and 8 are already operational, routes 4 and 6 are being restored, with routes 7 and 9 currently nearing construction completion.
In 2010, funding was received for a bridge over the Titas River. In September 2010, the Government of Bangladesh approved ten rail development projects costing 19·9 billion Bangladeshi taka including plans for new tracks and rolling stock. To bolster the bilateral ties between India and Bangladesh, the Ministry of Railways in India has supplied 20 Broad Gauge (BG) locomotives to its eastern neighbour, thus contributing to the railway infrastructure of Bangladesh. These locomotives have been appropriately modified by the Indian side to align with the requirements of Bangladesh Railway. The provision of these locomotives will aid in managing the growing volume of passenger and freight train operations in Bangladesh, thereby supporting the enhancement of its railway system. It is worth noting that previously, in June 2020, the Indian Government had granted 10 locomotives to Bangladesh, further contributing to the improvement of its railways.
In 2011, Sheikh Hasina Wazed, the then Prime Minister of Bangladesh, officiated at the start of construction of a link that would cross several rivers to reach Cox's Bazar. The 100 kilometres (62 mi) of dual-gauge line started from the railhead at Dohazari, southeast of Chittagong. The plan was to reach Satkania, Dulahazra, Chakarin, Edgaon, Ramu, and Cox's Bazar, with four major river bridges and a 30 kilometres (19 mi) branch from Ramu to Gundum. In 2013, the Chhattogram Circular Railway was completed.
In 2015, construction of a 16 kilometres (9.9 mi) branch to Agartala, Tripura in Northeast India commenced. In 2017, land acquisition took place to facilitate the construction.
In 2022, construction of the 6,250 metres (20,510 ft) long Padma Bridge was completed and the bridge was thrown open after inauguration by Sheikh Hasina Wazed, the Prime Minister of Bangladesh to connect Dhaka with Faridpur via Narayanganj.
From Wikipedia’s article on Bangladesh Railway, shared under CC BY-SA 4.0.4