Private company

Barcelona Traction, Light and Power

Utility/transport company in Catalonia

The Barcelona Traction Light and Power Company, Limited (locally known as La canadiense in Spanish and La canadenca in Catalan, "The Canadian") was a Canadian utility company that operated light and power utilities in Catalonia, Spain. It was incorporated on September 12, 1911 in Toronto, Ontario, Canada by Frederick Stark Pearson. The company was developed by Belgian-American engineer Dannie Heineman.2 It is part of Société Internationale d'Énergie Hydro-Électrique.1 It ceased to exist in 1952.1 Wikipedia text CC BY-SA 4.0

Last updated Oct 21, 2026.

Overview

Sep 12, 1911Founded1
  • HeadquartersBarcelona1
  • Founded inToronto1
  • Legal formS.A.1
Accio
Photo: Jo mateix, Public domain, via Wikimedia Commons4

The Barcelona Traction Light and Power Company, Limited (locally known as La canadiense in Spanish and La canadenca in Catalan, "The Canadian") was a Canadian utility company that operated light and power utilities in Catalonia, Spain. It was incorporated on September 12, 1911 in Toronto, Ontario, Canada by Frederick Stark Pearson. The company was developed by Belgian-American engineer Dannie Heineman.2

Corporate structure

Barcelona Traction, Light and Power sits at the top of its group. 4 entities, 2 countries on record. Switch between the flow chart and the network, and select any entity to see its details.

Built from subsidiaries, stakes and holdings from Wikidata (CC0); major holders from Schedules 13D and 13G. Each entity in the chart links to its source.

The story

Founded by Frederick Stark Pearson on Sep 12, 1911, in Toronto.1

In 1919, a conflict between a BTLP subsidiary, Riegos y fuerzas del Ebro, and eight office workers escalated into a 44-days general strike called by the Anarcho-Syndicalist National Confederation of Labour halting Barcelona and 70% of the Catalan industry. A success for labour, the strike ended with a law establishing an 8-hour workday throughout Spain, the liberation of imprisoned workers without a pending process, wage increases for La Canadiense workers and half-wages for the month spent striking.

From Wikipedia’s article on Barcelona Traction, shared under CC BY-SA 4.0.3

Leadership

Who has led Barcelona Traction, Light and Power, and when. Pick a name to see everywhere that person has worked.

Subsidiaries and ownership

Parent company

  • Société Internationale d'Énergie Hydro-Électrique

Subsidiaries

From Wikidata.1

Acquisitions

  1. Succeeded by FECSA1

Tranvías de Barcelona (1912)

Ferrocarriles de Barcelona (1911–1913)

Compañía Barcelonesa de Electricidad (1912)

Saltos del Segre (1912)

Read the full text

Energía Eléctrica de Cataluña (1923)

Sociedad Española Hidráulica del Freser (1923)

Compañía General de Electricidad SA

Electricista Catalana SA

Saltos del Ebro SA (1930)

Hidroeléctrica del Segre (1933)

Saltos de Cataluña SA (1935)

Sociedad Productora de Fuerzas Motrices (1941)

From Wikipedia’s article on Barcelona Traction, shared under CC BY-SA 4.0.3

Timeline

  1. 1952Dissolved Dissolved1
  2. Sep 12, 1911Founded Founded in Toronto1