With a yearly energy sale of 24.2 TW⋅h the BKW is one of the biggest Swiss power utilities. Of this, 9.7 TW⋅h is produced by own plants or by shares in other facilities. As of 2007 the mix is mainly composed of nuclear (61.87%) and hydroelectric (37.96%) power. The remainder is produced by renewable sources like solar, wind, or biomass. Due to the necessity to diversify the mix and satisfy the increasing demand, BKW is introducing some fossil fuel power through shares in abroad plants.
In 2008 a new 800 MW combined cycle gas power plant started operation in Livorno Ferraris (province of Vercelli, Italy). BKW possesses a 25% share.
BKW produces up to 52% of its power through owned or shared hydroelectric plants in Switzerland and Italy.
Read the full text
Aarberg, Bern canton: 15.2 MW installed load, owned plant
Bannwil, Bern canton: 28.5 MW installed load, owned plant
Kallnach, Bern canton: 8.1 MW installed load, owned plant
Kandergrund, Bern canton: 18.8 MW installed load, owned plant
Mühleberg, Bern canton: 45 MW installed load, owned plant
Niederried, Bern canton: 15 MW installed load, owned plant
Schattenhalb, Bern canton, two plants: 12 MW (2.3 + 9.7) combined installed load, owned plants
Spiez, Bern canton: 18.6 MW installed load, owned plant
Some of the group companies also produce hydroelectric power. The BKW portions of the installed production are:
EW Grindelwald AG, Bern canton: 1.5 MW
EWR Energie AG, Bern canton: 6.5 MW
Idroelettrica Lombarda Srl, provinces of Bergamo and Brescia (Italy): 41.8 MW
Société des forces électriques de la Goule, Bern canton: 5.2 MW
Onyx Energie Mittelland, Bern canton: 20.2 MW
Simmentaler Kraftwerke AG, Bern canton: 30.1 MW
The rest is generated through holdings. The production portions of the BKW are:
Kraftwerke Oberhasli AG, Bern canton: 531.0 MW
Engadiner Kraftwerke AG, Graubünden (Switzerland): 128.0 MW
Grande Dixence SA, Valais (Switzerland): 90.0 MW
Kraftwerke Mauvoisin AG, Valais (Switzerland): 77.2 MW
Gommerkraftwerke AG, Valais (Switzerland): 50.0 MW
Maggia Kraftwerke AG, Ticino (Switzerland): 62.0 MW
Blenio Kraftwerke AG, Ticino (Switzerland): 47.0 MW
Kraftwerke Hinterrhein AG, Graubünden (Switzerland): 50.0 MW
Electra-Massa AG, Valais (Switzerland): 54.8 MW
Bielersee Kraftwerke AG, Bern canton: 9.7 MW
Kraftwerke Mattmark AG, Valais (Switzerland): 26.4 MW
Flumenthal, Bern canton: 8.2 MW purchase right
Electricité de la Lienne SA, Valais (Switzerland): 26.7 MW
Kraftwerke Sanetsch AG, Bern canton: 9.0 MW
Aarewerke AG, Aargau (Switzerland): 4.0 MW
Nuclear power
Around 60% of the energy produced comes from nuclear plants. BKW owns the Mühleberg Nuclear Power Plant and three shares in other Swiss or French facilities:
Cattenom Nuclear Power Plant, department of Moselle (France): 5200 MW net electric output, ca. 6% share
Fessenheim Nuclear Power Plant, department of Haut-Rhin (France): 1760 MW net electric output, 10% share
Leibstadt Nuclear Power Plant, Aargau (Switzerland): 1165 MW net electric output, 9.25% share
Mühleberg Nuclear Power Plant, Bern canton: 355 MW net electric output, owned plant
Solar power
BKW possesses or shares an increasing number of solar plants of various size. The most important are:
Mont-Soleil, Bern canton: 560 kW installed power, 17.8% output share
Stade de Suisse, Bern canton: 1300 kW installed power, owned plant
Wind power
BKW produces wind power at two plants:
Juvent Wind Power Plant, Bern canton: 7.7 MW power output, 60% share
Bockelwitz Wind Power Plant, Saxony (Germany): 15 MW power output, owned plant
Biomass power
BKW has a 25% share in an 11 MW biomass power plant in construction in Pignataro Maggiore (province of Caserta, Italy). Operation should start in 2009.
In Ottana (province of Nuoro, Italy) BKW is present with a 10.5% share in a 35 MW biomass plant. The commercial operation should start in 2009.
Fossil fuel power
In 2008 started the construction of a new 800 MW coal power plant in the city of Wilhelmshaven (Lower Saxony, Germany). BKW takes part to the project with a 33% share (240 MW). It should start production in 2012.
BKW is considering to build with other partners a 900 MW coal power plant in Dörpen (Lower Saxony, Germany).
The Papierfabrik Utzenstorf AG and BKW are planning to build in Utzenstorf (canton of Bern, Switzerland) a combined cycle gas power plant. It should start operation in 2016 and deliver power, steam and heat.
Irsina (province of Matera, Italy) has been chosen as possible location for a planned 400 MW combined cycle gas power plant.
Hydroelectric power
In 2008, BKW started construction of a new run-of-the-river plant on the Alpbach torrent in Kandersteg (canton of Bern, Switzerland). The 2.6 MW installation should start production in 2009. BKW possesses a 60% share.
BKW has an 80% share in a company that is building a new small hydroelectric plant in Wiler (Valais, Switzerland). The 1.4 MW station should start operation in 2010.
Schattenhalb 3 is a new 10 MW hydroelectric power plant which construction started in 2008. It is located in Schattenhalb (canton of Bern, Switzerland) and is planned to start production in 2010. It will be operated by a subsidiary of BKW.
BKW and the municipality of Tinizong-Rona (canton of Graubünden, Switzerland) will build a new 7.5 MW plant that will exploit the Errbach torrent.
Nuclear power
In the 2020s, the Mühleberg Nuclear Power Plant will probably cease its activity and the contracts for importing nuclear energy from France will expire. BKW and Axpo founded Resun AG to prevent the consequent energy lack. Its purpose is to manage the administrative procedure for building two new nuclear plants up to 1600 MW each.