The story
The utility was created in 1905, after city officials grew dissatisfied with the investor-owned Burlington Light and Power Company and its pricing.
The 30-megawatt coal-fired Moran Municipal Generation Station, named for Mayor J.E. Moran, was completed in 1954. It was decommissioned in 1986. The city has planned to convert it to recreation or museum use.
Historic building
Burlington Electric Department's Pine Street campus was featured as a "Hidden Treasure". It was built around 1969 by architect Julian Goodrich of Freeman French Freeman, and is dedicated to BED's Superintendent from 1954 to 1975, William A. Stebbins. It is "an excellent example of the International Style" with curtain wall construction. The building has two porte-cochères.
From Wikipedia’s article on Burlington Electric Department, shared under CC BY-SA 4.0.4