The story
The 1880s
Cedar Falls Utilities began as a municipally owned waterworks in 1888 which supplied spring water to residents and businesses. The waterworks was praised for its water and nearly "legendary state of purity".
The 1890s
In the late 1890s, a franchise was granted to a company based in Waterloo, Iowa (Citizens Gas and Electric Company) for electric production which powered street and house lighting for 15 years. Due to this existing franchise – despite public interest in developing a community-owned electric company, and hoping to avoid a monopoly situation – focus was placed on creating a community-owned gas plant. A short franchise was granted to George A. Dunkle of Chicago to provide a gas plant and distribution system, but was quickly disbanded after a fatal accident caused by the lighted match of an employee. 25-year franchise rights were then granted to Citizens Gas and Electric Company in Waterloo for gas production and distribution in Cedar Falls.
The 1910s
In the early 1910s, ordinary citizens and industrial leaders alike began taking note of the city's poor street lighting. In a special election on March 13, 1913 Cedar Falls residents voted in favor of a bond to construct a municipally owned power plant and distribution system. On April 1, 1914, generation started at the plant and the first customers were served. Shortly after production began, in June 1914, the community-owned electric company signed an agreement with the Iowa State Teachers College (now the University of Northern Iowa) to supply electricity to the campus.
The 1920s
After pushes to raise gas prices from the Citizens Gas and Electric company, as well as a fatal gas explosion killing a Cedar Falls family, public enthusiasm for a municipally owned gas utility steadily increased over the course of the 1920s. An engineering consulting firm was hired from Kansas City to investigate the gas situation in Cedar Falls, by whom recommendations were made to establish a community-owned gas manufacturing and distribution system. During this time, the public waterworks and electric distribution systems continued to operate smoothly. In 1926, the original cost of the power plant was paid off, about 12 years after it was established. Then, in March, 1928, a vote was held and passed by a 5-1/2 to 1 margin to construct a municipal gas utility.
The 1930s
In 1936, demand for electricity threatened to exceed the municipal utility's means to produce it. Enthusiasts called for a hydroelectric power plant to be built on the Cedar River, claiming that hydroelectric power is "almost free for the asking." However, due to drought and extremely low water levels in recent years, the utility opted to construct a 2,500 kilowatt steam turbine at the power plant instead. Construction of the turbine was completed in 1937.
In the late 1930s, due to damage of the swimming beach on the Cedar River, the utility company transformed the artificial lake at their power plant into a public swimming pool. Expenses for maintenance of the lake and grounds, construction of bath houses and fences, and maintenance of a safety boat were charged to the lighting fund. Promotion, staff, water treatment, and classes were charged to a city recreation fund.
The 1940s
In 1939, surveys began for adapting a recently rebuilt dam on the Cedar River with a hydroelectric plant. A site was chosen a quarter-mile downstream from the dam, and a 1,200 kilowatt hydroelectric plant went into service on February 1, 1941. During the first full year of service, due to unusually high water levels on the Cedar River, the hydroelectric plant produced about 60 percent of the city's electric needs, a mark not to be reached again during the lifetime of the plant.
The year 1945, with the end of World War II, marked the beginning of a steady increase in demand for all utility services. The G.I. Bill of Rights brought an unprecedented number of young men to Cedar Falls for college and to start new lives with their families. During this time, old water and electric production equipment, as well as the employees who maintained them, began to show their age. The equipment could not keep up with demand, and workers who had known the operation of this equipment from the beginning were starting to retire. Plans were made for plant upgrades at the municipal utilities, specifically for electric production equipment and water well pumps which had grown obsolete. In the late 1940s, to keep up with "the fastest growing city in Iowa" and their utility needs, a board of trustees appointed by the mayor to oversee company operation was considered.
Read the full text
The 1950s
The 1950s were a period of great expansion for Cedar Falls and the utility company necessarily expanded with it. Natural gas distribution began in the mid 50s. In 1956, nearly 6.1 million gallons of water were pumped to citizens and businesses of Cedar Falls. A 5,000 kilowatt turbine-generator, completed in 1955, was constructed to meet growing electric demands, only to be met with further increased demand in 1956 when a 10,000 kilowatt interchange agreement was made with the Iowa Public Service Company. In 1959, further expansion of the city's electrical distribution system was needed. Plans were also made for an extensive street lighting program to improve the quality of street lights throughout Cedar Falls. That year, 94.2% of energy was generated at the Utility's power plant, 5.47% was produced by the hydroelectric plant, and about 0.25% was purchased from the Iowa Public Service Company.
The 1960s
Now supporting a population nearly 7,000 greater than a decade before, the electric and gas departments continued their rapid expansion during the 1960s. A new office building was completed in March 1960 for the Gas, Water, and Electric department's office workers which included a 4,500 square foot community room and commonly hosted meetings for the Cedar Falls City Council, United Appeal, Girl Scouts, Red Cross, and local churches. Cedar Falls Municipal Utilities was one of three fallout shelter sites in Cedar Falls during the Cuban Missile Crisis. The Black Hawk County Civil Defense stocked the shelter with food, medical, and sanitation supplies.
The newly appointed Board of Trustees's first major concern was the need for expanded access to electric service. Proposals for a 16,500 kilowatt steam turbine-generator were made in late 1960 and construction began in March 1962. When completed, the new power plant addition was the tallest structure in Cedar Falls. A new Gas Distribution facility went into service in late 1963 and by 1965 80 percent of homes in Cedar Falls were heated with natural gas.
In 1966 the modern CFU logo was first used. That same year, two and a half miles of water main was laid helping supply over 780 million gallons of water to the people of Cedar Falls. In 1968, a massive 25,000 kilowatt combustion engine – the largest in Iowa at the time – was constructed in Cedar Falls.
During the summer of 1969, the community swimming pool was filled in to provide additional coal storage.
2025: Ending Cable TV
On October 6, 2025, CFU has announced that it will end its cable TV service amid soaring costs of programming contracts and the number of customers preferring streaming television platforms with advanced technology not provided from the company's traditional lines. CFU is expected to wind down its cable TV operations by October 11, 2026; however, the company will continue to offer fiber-driven internet. During this transitional period, CFU personnel are helping its current customers make the switch to other providers--such as YouTube TV. This announcement came at a time when the media landscape had undergone dramatic changes, and smaller cable companies face rising operational and content costs.
General managers 1958–2018
In March, 1958, John P. Pace, a graduate of the University of New Mexico with a degree in electrical engineering, was hired as the Utility's first CEO. A special election in August that same year transferred control of the Utilities from the city council to a Board of Trustees appointed by the mayor of Cedar Falls. The first Board of Trustees took office on September 1, 1959.
From Wikipedia’s article on Cedar Falls Utilities, shared under CC BY-SA 4.0.4