The story
Initial tunnels
The city of Chicago granted the newly formed Illinois Telephone and Telegraph company the rights to construct utility tunnels under the streets of Chicago in 1899 to carry its planned network of telephone cables. Initial plans for the tunnels called for filling them with phone cables, leaving a 6-foot (183 cm) by 14-inch (36 cm) passage for maintenance. When the city refused to permit manholes through which cable could be unreeled into the tunnels, the plans were changed to include rails for hauling cable spools through the tunnels. The city was largely unaware of the nature of the tunneling, and the first 16 miles (26 km) of tunnel were excavated somewhat covertly, working from the basement of a saloon and carting away the spoil after midnight.
Initially, the intended purpose of the narrow gauge railroad below the telephone cables was limited to hauling out excavation debris and hauling cable spools during the installation of telephone lines, but in 1903, the company renegotiated its franchise to allow the use of this railroad for freight and mail service. In early 1905, the system was taken over by the Illinois Tunnel Company. By this time, 26 miles (42 km) of a projected 60 miles (97 km) of tunnel had been completed. The actual construction work was subcontracted to the Illinois Telephone Construction Company, under the management of George W. Jackson (1861–1922).
Refinancing
By 1904, the first round of financing for tunnel system construction had largely been spent. A second round of financing was arranged by James Stillman of the National City Bank of New York City, with public support from E. H. Harriman, Jacob H. Schiff, and Patrick A. Valentine, all directors of that bank. With this financing, the Chicago Subway Company, incorporated in New Jersey, became a new holding company for the tunnel system.
The Chicago Warehouse and Terminal Company was an affiliate, formed in 1904 to construct and operate terminal facilities for interchanging freight with railroads and other carriers.
The Illinois Tunnel Company continued to expand the tunnel system and serve a growing customer base until 1908, when the employees moved to join the Amalgamated Association of Street and Electric Railway Employees. The tunnel company refused to recognize the union and began firing union members. Despite the intervention of Congressman William Lorimer, all 260 employees went on strike on May 9. The company hired strikebreakers and refused to rehire any of the strikers.
The Tunnel Company ran into a problem with a part of its planned expansion. In November 1906, the Chicago Board of Local Improvements announced it was considering widening Halsted Street between Chicago Avenue and 22nd Street. 300 property owners on Halsted Street, represented by the Law Firm of Adler & Lederer (now known as Arnstein & Lehr, LLP), opposed the widening of the street because it would interfere with their business and the cost would result in burdensome assessments. Attorney Charles Lederer charged that there was graft connected with the proposition to widen the street and that if this was done the scheme was then to utilize the street to connect the tunnel with the Chicago Stockyards so that it would have access to the railroads.
Bankruptcy and reorganization
By 1909, the cost of construction had bankrupted the Illinois Tunnel Company. By this time, it was estimated that $30,000,000 had been spent on building and operating the tunnel. The receiver's sale was completed in 1912, with the Chicago Tunnel Company, a wholly owned subsidiary of the Chicago Utilities Company, acquiring all assets of the former company and its affiliates, the Chicago Warehouse and Terminal Company and the Illinois Telephone and Telegraph Company. In 1913, the Chicago Tunnel Company agreed to sell its telephone operations to American Telephone and Telegraph Company, although regulatory approval delayed the actual sale until 1916. By 1920, all telephone cables had been removed from the tunnels.
By 1914, about 60 miles (97 km) of tunnel had been constructed, typically 7 feet 6 inches (2.3 m) high and 6 feet (1.83 m) wide, with 2 ft (610 mm) gauge track. 19 elevators connected the tunnel with customers, and five elevators served universal public stations where freight could be dropped off or picked up by the public. The railroad operated 132 electric locomotives, typically 30 to 50 horsepower (22 to 37 kW) each, and had 2,042 merchandise cars, 350 excavating cars and 235 coal and ash cars. In 1914, the tunnel company handled 609,320 short tons (544,036 long tons; 552,766 t) of freight, 275,218 short tons (245,730 long tons; 249,674 t) of which were merchandise. The remainder was presumably coal, ash and excavation debris.
Read the full text
From 1912 into the 1930s, the tunnel company was managed by Sherman Weld Tracy. It was never very profitable, but it avoided receivership, with most of the stock held by J. Ogden Armour, E. H. Harriman and their heirs.
Conflict with the subway
Plans for passenger subway service in Chicago date back to the turn of the 20th century, and the original permits to dig the freight tunnels allowed for future cut-and-cover subway development above the tunnels. In the 1930s, when the Chicago Rapid Transit Company and the city finalized the design of the State Street and Dearborn Street subways, plans called for the tunnels to be dug through the blue clay along the line originally followed by the freight tunnels. Excavation debris from the new subway tunnels was hauled away by the Chicago Tunnel Company as the subway replaced the freight tunnels along their route.
Company failure
The Chicago Tunnel Company went bankrupt and applied for voluntary reorganization in 1956. The tunnel company attempted to sever itself from the bankrupt holding company, claiming it could operate at a profit, but by 1959, the tunnel asked for abandonment permission. The Interstate Commerce Commission consented to abandonment that July, and the tunnel assets were sold at auction for $64,000 in October.
Tunnel flooding
In late 1991 near the Kinzie Street Bridge, a new set of pilings (collectively known as a "dolphin") were driven into the riverbed to prevent barges from bumping into the bridge. As the pillars were installed, a miscalculation was made that caused severe damage to the tunnel directly below the river.
The risk of flooding was well understood by George W. Jackson, the chief engineer who built the tunnel system. In 1909, Jackson received a patent on a portable bulkhead that could be used to seal off flooded tunnel sections. The tunnel developers were also concerned by the flooding risk posed by firefighting efforts in buildings connected to the tunnels. Should a building catch fire, immense quantities of water could pour into the tunnels through elevator shafts and basement connections. To deal with this risk, watertight fire doors were fitted into all building connections. Small leaks in the tunnels under the Chicago River had become commonplace by 1913; to deal with them, the tunnel company drilled holes in the tunnel wall and pumped grout at high pressure into the soil outside the tunnel in the vicinity of the leak.
The 1992 flood was not the first time that a contractor's action threatened to flood Chicago by puncturing the tunnel. In 1959, an excavation punctured the tunnel, leading to a dramatic and successful fight to prevent disaster.
In 1992, a cable television employee in the tunnel underneath the Chicago River videotaped mud and water oozing in where the bottom of the wooden pilings had cracked the tunnel wall. The pilings making up the dolphin had been driven only a few feet from the side of the tunnel, and the wooden pilings were visible through the collapsed tunnel wall where wet clay had slumped away from the wood into the tunnel.
Official response to the reported leak was slow; no emergency measures were deemed necessary, and a formal bidding process began for the contract to repair the damage. On April 13, some six months later, the slow oozing of wet clay opened a clear passage from the riverbed, allowing the river to pour directly into the tunnel. In what became known as the Chicago Flood, the entire system was quickly flooded. The Merchandise Mart was the first victim, declaring a water emergency at 5:57 am. City Hall began to flood by 6:02 am, the Federal Reserve Bank at 8:29 am, finally, the Chicago Hilton and Towers at 12:08 pm. The long delay before some buildings were flooded was the result of closure of some sections of the tunnel system in 1942 when the passenger subways were built. Many businesses had not realized that they were still connected to the tunnel complex, as the openings were boarded up, bricked up, or otherwise closed off—but not made watertight.
At that point, government agencies belatedly responded. The leak was stopped and the tunnels were emptied within days at great cost. The tunnels are still used for power and communication cables. They have been popular with urban exploration groups who would sometimes sneak in to have a look around, but since the Joseph Konopka terrorism scare in the early 2000s, all access to the tunnels has been secured.
The accident shut down the entire downtown area for days, causing considerable economic losses. Insurance battles lasted for years, the central point being the definition of the accident, i.e., whether it was a "flood" or a "leak." Leaks were covered by insurance, while floods were not. Eventually it was classified a leak, which is why some have called it the "Great Chicago Leak."
Recent incidents
On October 14, 2009, workers pumping concrete into the tunnel under the Kennedy Expressway caused the roadway to buckle, shutting down all but one lane of the westbound expressway.