Founded by Hinman B. Hurlbut, Horace Kelley, Jeptha Wade, John Huntington and Jeptha Homer Wade II in 1913.1
Beginnings
The Cleveland Museum of Art was founded as a trust in 1913 with an endowment from prominent Cleveland industrialists Hinman Hurlbut, John Huntington, and Horace Kelley. The neoclassical, white Georgian Marble, Beaux-Arts building was constructed on the southern edge of Wade Park, at the cost of $1.25 million. Wade Park and the museum were designed by the local architectural firm, Hubbell & Benes, with the museum planned as the park's centerpiece. The 75-acre (300,000 m2) green space takes its name from philanthropist Jeptha H. Wade, who donated part of his wooded estate to the city in 1881. Today, the park, with the museum still as its centerpiece, is on the National Register of Historic Places.The museum opened its doors to the public on June 6, 1916, with Wade's grandson, Jeptha H. Wade II, proclaiming it, "for the benefit of all people, forever". Wade, like his grandfather, had a great interest in art and served as the museum's first vice-president; in 1920 he became its president.
One of the first persons to serve as consultant to the museum was Harold Woodbury Parsons, a “self-described aesthete” who held the position of “European representative” from 1925 to 1941. Parsons also served in a similar capacity to the trustees of the Nelson-Atkins Museum in Kansas City, Missouri, beginning in April 1930. (That museum didn’t open to the public until December 1933.) Serving as consultant to two museums meant that Parsons was able to play them against each other, encouraging a sense of competition for the acquisition of art objects.
Mid–to late 20th century expansion
In March 1958, the first addition to the building opened, doubling the museum's floorspace. This addition, which was on the north side of the original building, was designed by the Cleveland architectural firm of Hays and Ruth. They designed new gallery space and a new art library.
The museum again expanded in 1971 with the opening of the North Wing. With its stepped, two-toned granite facade, the addition designed by modernist architect Marcel Breuer provided angular lines in distinct contrast with the flourishes of the 1916 building's neoclassical facade. The museum's main entrance was shifted to the North Wing. The auditorium, classrooms, and lecture halls were also moved into the North Wing, allowing their spaces in the Original Building to be renovated as gallery space.
In 1983, a West Wing, designed by the Cleveland architectural firm of Dalton, van Dijk, Johnson, & Partners, was completed. This provided larger library space, as well as nine new galleries.
Between 2001 and 2012, the 1958 and 1983 additions were demolished. A new wrap-around building, and east and west wings were constructed. Designed by Rafael Viñoly, this $350 million project doubled the museum's total size to 592,000 square feet (55,000 m2) (gallery space over 130,000 square feet (12,000 m2). To integrate the new east and west wings with the Breuer building to the north, a new structure was built along the south side of the 1971 addition, creating extensive new gallery space on two levels, as well as providing for a museum store and other amenities. Viñoly covered the space created by the demolition of the 1958 and 1983 structures with a glass-roofed atrium. The east wing opened in 2009, and the north wing and atrium in 2012. The West Wing opened on January 2, 2014.
Expansion in the 21st century
The museum's building and renovation project, "Building for the Future", began in 2005 and was originally targeted for completion in 2012 (though it was not completed until 2013) at projected costs of $258 million. The museum celebrated the official completion of the renovation and expansion project with a grand opening celebration held on December 31, 2013, and additional activities that continued through the first week of 2014. The $350 million project—two-thirds of which was earmarked for the complete renovation of the original 1916 structure—added two new wings, and was the largest cultural project in Ohio's history. The new east and west wings, as well as the enclosing of the atrium courtyard under a soaring glass canopy, have brought the museum's total floor space to 592,000 square feet (55,000 m2) (an increase of approximately 65%).
The first phase of the project had $9.3 million in cost overruns; the opening was delayed by 9 months. Museum director Timothy Rub assured the public that the increase in quality would be worth both the wait and expense. In June 2008, after being closed for nearly three years for the overhaul, the museum reopened 19 of its permanent galleries to the public in the renovated 1916 building main floor.
Read the full text
On June 27, 2009, the newly constructed East Wing (which contains the Impressionist, Contemporary, and Modern art collections) opened to the public.
On June 26, 2010, the ground level of the 1916 building reopened. It now houses the collections of Greek, Roman, Egyptian, Sub-Saharan African, Byzantine, and Medieval art.
The expanded museum includes enhanced visitor amenities, such as new restrooms, an expanded store and café, a sit-down gourmet restaurant, parking capacity increased to 620 spaces, and a 34,000 square feet (3,200 m2) glass-covered courtyard.
On June 12, 2021, Cleveland Museum of Art opened a community arts center in Cleveland's Clark-Fulton neighborhood. It hosts former Parade the Circle floats, displays and art that were previously in temporary storage.
From Wikipedia’s article on Cleveland Museum of Art, shared under CC BY-SA 4.0.5