Overview
Corporate structure
CONSTELLATION ENERGY GENERATION LLC sits at the top of its group. 2 entities, 1 country on record. Switch between the flow chart and the network, and select any entity to see its details.
- CONSTELLATION ENERGY GENERATION LLC Kennett Square, Pennsylvania
- Net Power Inc. Stake · Houston, Texas
Built from major holders from Schedules 13D and 13G; stakes of 5% or more it reported on Schedules 13D and 13G (1 companies). Each entity in the chart links to its source.
What it owns
What CONSTELLATION ENERGY GENERATION LLC reports owning in its annual reports to the SEC: buildings, land and equipment, real estate and locations, investments, intangible assets and inventory, at the end of its latest fiscal year and a year before.
Properties, in its own words
The following table presents our interests in net electric generating capacity by station at December 31, 2025:
Station(a) · Location · No. of Units · Percent Owned(b) · Primary Fuel Type · Primary Dispatch Type(c) · Net Generation Capacity (MWs)(d)
The rest of Item 2
Midwest
Braidwood · Braidwood, IL · 2 · Uranium · Baseload · 2,386
Byron · Byron, IL · 2 · Uranium · Baseload · 2,350
LaSalle · Seneca, IL · 2 · Uranium · Baseload · 2,320
Dresden · Morris, IL · 2 · Uranium · Baseload · 1,845
Quad Cities · Cordova, IL · 2 · 75 · Uranium · Baseload · 1,403
Clinton · Clinton, IL · 1 · Uranium · Baseload · 1,092
Michigan Wind 2 · Sanilac County, MI · 50 · 51 · (e) · Wind · Intermittent · 46
Beebe · Gratiot County, MI · 34 · 51 · (e) · Wind · Intermittent · 42
Michigan Wind 1 · Huron County, MI · 46 · 51 · (e) · Wind · Intermittent · 35
Harvest 2 · Huron County, MI · 33 · 51 · (e) · Wind · Intermittent · 30
Harvest · Huron County, MI · 31 · 51 · (e) · Wind · Intermittent · 26
Beebe 1B · Gratiot County, MI · 21 · 51 · (e) · Wind · Intermittent · 26
Clinton Battery Storage · Blanchester, OH · 1 · Energy Storage · Peaking · 5
Total Midwest · 11,606
Mid-Atlantic
Limerick · Sanatoga, PA · 2 · Uranium · Baseload · 2,315
Calvert Cliffs · Lusby, MD · 2 · Uranium · Baseload · 1,789
Peach Bottom · Delta, PA · 2 · 50 · Uranium · Baseload · 1,324
Salem · Lower Alloways Creek Township, NJ · 2 · 42.59 · Uranium · Baseload · 988
Conowingo · Darlington, MD · 11 · Hydroelectric · Baseload · 497
Criterion · Oakland, MD · 28 · 51 · (e) · Wind · Intermittent · 36
Fair Wind · Garrett County, MD · 12 · Wind · Intermittent · 30
Fourmile Ridge · Garrett County, MD · 16 · 51 · (e) · Wind · Intermittent · 20
Solar Horizons · Emmitsburg, MD · 1 · 51 · (e) · Solar · Intermittent · 8
Solar New Jersey 3 · Middle Township, NJ · 4 · 51 · (e) · Solar · Intermittent · 1
Muddy Run · Drumore, PA · 8 · Hydroelectric · Intermediate · 1,058
Eddystone 3, 4 · Eddystone, PA · 2 · Oil/Gas · Peaking · 760
Perryman · Aberdeen, MD · 5 · Oil/Gas · Peaking · 404
Croydon · West Bristol, PA · 8 · Oil · Peaking · 391
Handsome Lake · Kennerdell, PA · 5 · Gas · Peaking · 268
Richmond · Philadelphia, PA · 2 · Oil · Peaking · 98
Philadelphia Road · Baltimore, MD · 4 · Oil · Peaking · 60
Eddystone · Eddystone, PA · 4 · Oil · Peaking · 60
Delaware · Philadelphia, PA · 4 · Oil · Peaking · 56
Southwark · Philadelphia, PA · 4 · Oil · Peaking · 52
Falls · Morrisville, PA · 3 · Oil · Peaking · 51
Station(a) · Location · No. of Units · Percent Owned(b) · Primary Fuel Type · Primary Dispatch Type(c) · Net Generation Capacity (MWs)(d)
Moser · Lower Pottsgrove Township, PA · 3 · Oil · Peaking · 51
Chester · Chester, PA · 3 · Oil · Peaking · 39
Schuylkill · Philadelphia, PA · 2 · Oil · Peaking · 30
Total Mid-Atlantic · 10,386
ERCOT
STP · Bay City, TX · 2 · 44 · (g) · Uranium · Baseload · 1,164
Whitetail · Webb County, TX · 57 · 51 · (e) · Wind · Intermittent · 47
Sendero · Jim Hogg and Zapata Counties, TX · 39 · 51 · (e) · Wind · Intermittent · 40
Colorado Bend II · Wharton, TX · 3 · Gas · Intermediate · 1,143
Wolf Hollow II · Granbury, TX · 3 · Gas · Intermediate · 1,103
Handley 3 · Fort Worth, TX · 1 · Gas · Intermediate · 375
Handley 4, 5 · Fort Worth, TX · 2 · Gas · Peaking · 870
Total ERCOT · 4,742
New York
NMP 1 · Scriba, NY · 1 · Uranium · Baseload · 620
NMP 2 · Scriba, NY · 1 · 82 · Uranium · Baseload · 1,055
FitzPatrick · Scriba, NY · 1 · Uranium · Baseload · 842
Ginna · Ontario, NY · 1 · Uranium · Baseload · 576
Total New York · 3,093
Other
Antelope Valley · Lancaster, CA · 1 · Solar · Intermittent · 242
Bluestem · Beaver County, OK · 60 · 51 · (e)(f) · Wind · Intermittent · 101
Shooting Star · Kiowa County, KS · 65 · 51 · (e) · Wind · Intermittent · 53
Bluegrass Ridge · King City, MO · 26 · 51 · (e) · Wind · Intermittent · 29
Conception · Barnard, MO · 23 · 51 · (e) · Wind · Intermittent · 26
Cow Branch · Rock Port, MO · 23 · 51 · (e) · Wind · Intermittent · 26
Mountain Home · Glenns Ferry, ID · 20 · 51 · (e) · Wind · Intermittent · 21
High Mesa · Elmore County, ID · 19 · 51 · (e) · Wind · Intermittent · 20
Echo 1 · Echo, OR · 21 · 50.49 · (e) · Wind · Intermittent · 17
Sacramento PV Energy · Sacramento, CA · 4 · 51 · (e) · Solar · Intermittent · 15
Cassia · Buhl, ID · 13 · 51 · (e) · Wind · Intermittent · 14
Wildcat · Lovington, NM · 13 · 51 · (e) · Wind · Intermittent · 14
Echo 2 · Echo, OR · 9 · 51 · (e) · Wind · Intermittent · 9
Tuana Springs · Hagerman, ID · 8 · 51 · (e) · Wind · Intermittent · 9
Greensburg · Greensburg, KS · 10 · 51 · (e) · Wind · Intermittent · 6
Threemile Canyon · Boardman, OR · 6 · 51 · (e) · Wind · Intermittent · 5
Loess Hills · Rock Port, MO · 4 · Wind · Intermittent · 5
Denver Airport Solar · Denver, CO · 1 · 51 · (e) · Solar · Intermittent · 2
Hillabee · Alexander City, AL · 3 · Gas · Intermediate · 753
Station(a) · Location · No. of Units · Percent Owned(b) · Primary Fuel Type · Primary Dispatch Type(c) · Net Generation Capacity (MWs)(d)
Wyman 4 · Yarmouth, ME · 1 · 5.9 · Oil · Intermediate · 34
West Medway II · West Medway, MA · 2 · Oil/Gas · Peaking · 189
West Medway · West Medway, MA · 3 · Oil · Peaking · 123
Grand Prairie · Alberta, Canada · 1 · Gas · Peaking · 105
Framingham · Framingham, MA · 3 · Oil · Peaking · 31
Total Other · 1,849
Total · 31,676
(a)All nuclear stations are boiling water reactors except Braidwood, Byron, Calvert Cliffs, Ginna, Salem, and STP units which are pressurized water reactors.
(b)100%, unless otherwise indicated.
Item 2 of the 10-K filed Feb 24, 2026.3
Former names
- EXELON GENERATION CO LLCApr 4, 2002 to Feb 3, 20222
Timeline
- Jun 25, 20268-K Other events4
- May 14, 20268-K Entered a material agreement; New debt or obligation5
- Jan 8, 20268-K Entered a material agreement; New debt or obligation6
- Sep 22, 20258-K Entered a material agreement7
- Jan 3, 20258-K Entered a material agreement; New debt or obligation8
- Jun 14, 20248-K Entered a material agreement9
- Mar 15, 20248-K Entered a material agreement; New debt or obligation10
- Sep 29, 20238-K Entered a material agreement; New debt or obligation11
- Apr 3, 20238-K New debt or obligation12
- Feb 24, 20238-K Entered a material agreement; New debt or obligation13
- Dec 16, 20218-K Other events14
- Nov 24, 20218-K Other events15
Calendar
When it reported results
- Nov 3, 2021Reported quarterly or annual results16
Upcoming dates from Nasdaq's calendar; past results from the company's 8-K filings (Item 2.02). The full markets calendar
Filings
34 filings to the SEC since October 2021: 1 quarterly reports, 13 major events, 20 other. The latest 20:
- Jun 25, 20268-K EDGAR
- May 27, 2026424B5 EDGAR
- May 14, 20268-K EDGAR
- May 13, 2026424B2 EDGAR
- May 12, 2026FWP EDGAR
- May 12, 2026424B2 EDGAR
- Apr 30, 2026EFFECT EDGAR
- Apr 27, 2026CORRESP EDGAR
- Apr 27, 2026UPLOAD EDGAR
- Apr 20, 2026S-4 EDGAR
- Jan 8, 20268-K EDGAR
- Jan 6, 2026424B5 EDGAR
- Jan 5, 2026FWP EDGAR
- Jan 5, 2026424B5 EDGAR
- Sep 22, 20258-K EDGAR
- Jan 3, 20258-K EDGAR
- Jun 14, 20248-K EDGAR
- Mar 15, 20248-K EDGAR
- Mar 13, 2024424B2 EDGAR
- Mar 12, 2024FWP EDGAR
The 34 filings since October 2021 can be filtered by form type and year here when JavaScript is on.
Every filing from the last five years, summarized. The full record is on SEC EDGAR.
Stakes it holds
CONSTELLATION ENERGY GENERATION LLC has told the SEC it owns more than 5% of 1 company, latest first (Schedules 13D and 13G).
- Net Power Inc.SC 13D Jun 20, 202317
Funding
Where the company's money came from, by calendar year: private offerings filed with the SEC, federal grants, loans, contracts and other assistance from USAspending.gov, and PPP loans from the SBA. Each bar links to the records below.
- Federal grants $78.9M
- Federal contracts $402.1K
Figures by year
| Year | Federal grants | Federal contracts | Total |
|---|---|---|---|
| 2026 | $6.8M | – | $6.8M |
| 2025 | $17.0M | – | $17.0M |
| 2024 | $18.4M | – | $18.4M |
| 2023 | $15.2M | – | $15.2M |
| 2022 | $2.5M | – | $2.5M |
| 2021 | $16.4M | – | $16.4M |
| 2019 | $2.6M | $144.7K | $2.7M |
| 2016 | – | $1.8K | $1.8K |
| 2011 | – | $76.0K | $76.0K |
| 2010 | – | $179.7K | $179.7K |
Federal awards
Obligated amounts from USAspending.gov18, by calendar year, 2010–2026, for its registration. Obligations are what agencies committed, not always what was paid out. Contracts pay for goods and services; grants, loans and direct payments are assistance. Loans are charted at the face value of the loans listed here. An award’s amount below is its lifetime total, and some began before the years charted.
Largest grants
- Oct 1, 2021$73.2M from Department of Energy: Nuclear Energy Research, Development And Demonstration19 To CONSTELLATION ENERGY GENERATION, LLC Award DENE0009042
- Oct 1, 2019$4.8M from Department of Energy: Renewable Energy Research And Development20 To CONSTELLATION ENERGY GENERATION, LLC Award DEEE0008849
- Sep 23, 2002$2.5M from Department of Energy: Nuclear Energy Research, Development And Demonstration21 To CONSTELLATION ENERGY GENERATION, LLC Award FC07-02ID14412
- Mar 20, 2024$880.0K from Department of Energy: Nuclear Energy Research, Development And Demonstration22 To CONSTELLATION ENERGY GENERATION, LLC Award DENE0009427
Largest contracts
- Jun 1, 2019$98.1K from Department of Veterans Affairs: Natural gas for lincoln va clinic23 To CONSTELLATION ENERGY GENERATION, LLC Award 36C26319P0785
- Feb 15, 2009$94.7K from U.S. Fish and Wildlife Service: Operation of the conowingo dam west fish lift for 200924 To CONSTELLATION ENERGY GENERATION, LLC Award INF50181AM025
- Mar 21, 2011$83.7K from U.S. Fish and Wildlife Service: Operation of the conowingo dam, west lift for 2011.25 To CONSTELLATION ENERGY GENERATION, LLC Award INF11PC00177
- Apr 15, 2010$61.0K from U.S. Fish and Wildlife Service: Operation of fish lift on the conowingo dam26 To CONSTELLATION ENERGY GENERATION, LLC Award INF50181AM121
- Jun 2, 2021$4.2K from Department of Veterans Affairs: Natural gas27 To CONSTELLATION ENERGY GENERATION, LLC Award 36C24721P0923
SEC filer profile
How CONSTELLATION ENERGY GENERATION LLC is registered with the Securities and Exchange Commission, from its EDGAR record and the cover page of its latest annual report.
- Name on EDGARCONSTELLATION ENERGY GENERATION LLC1
- CIK0001168165
- Employer ID (EIN)87-12107163
- Filer statusLarge accelerated filer not an emerging growth company; not a smaller reporting company; not a shell company3
- Incorporated inPennsylvania3
- Industry code (SIC)4911 Electric Services1
- SEC reviewing officeOffice of Energy & Transportation, Division of Corporation Finance1
- Business address200 Energy Way, Kennett Square, PA 19348-24731
- Phone833-883-01621
- Shares outstanding361,990,335 shares as of Feb 1, 20263
- Public float$100.6B as of Jun 30, 20253
- AuditorPricewaterhouseCoopers LLP, Baltimore, Maryland PCAOB ID 238; it also attests to the company’s internal control over financial reporting3
- On EDGAR sinceApr 4, 20021
- Filings713 in all: 8-K (518), 10-Q (74), 10-K (24), 424B2 (15), UPLOAD (15), FWP (12), 8-K/A (9), S-3ASR (8)1
All 21 form types
424B5 (6), 10-Q/A (5), CORRESP (5), 424B3 (4), S-4 (4), POSASR (3), S-4/A (3), 10-K/A (2), EFFECT (2), 3 (1), 424B4 (1), CT ORDER (1), SC 13D (1)
- Latest filingsAnnual report (10-K) Feb 24, 2026
Quarterly report (10-Q) Aug 6, 2026
Latest 8-K (8-K) Aug 6, 2026
Securities registered for trading
| Class | Symbol | Exchange |
|---|---|---|
| Common Stock, without par value | CEG | The Nasdaq Stock Market LLC |
From the cover page of the 10-K filed Feb 24, 2026 (Section 12(b) of the Exchange Act).3
Risk factors and legal proceedings
The risks CONSTELLATION ENERGY GENERATION LLC names in Item 1A of its 10-K filed Feb 24, 2026: 46 risks under these headings, as written.3
- Risks Related to Market and Financial Factors
- We are exposed to price volatility associated with both the wholesale and retail power markets and the procurement of nuclear fuel, natural gas, and oil.
- Cost and Availability of Fuel.
- Our risk management policies cannot fully eliminate the risk associated with our commodity trading activities.
- Financial performance and load requirements could be negatively affected if we are unable to effectively manage our power portfolio.
- We may be affected by emerging technologies that could, over time, affect or transform the energy industry.
- Market performance and other factors could decrease the value of our NDT funds and employee benefit plan assets, which then could require significant additional funding.
- We could be negatively affected by unstable capital and credit markets and increased volatility in commodity markets.
- If we were to experience a downgrade in our credit ratings to below investment grade or otherwise fail to satisfy the credit standards in our agreements with our counterparties or regulatory financial requirements, we would be required to provide significant amounts of collateral that could affect our liquidity and we could experience higher borrowing costs.
- If we fail to meet project-specific financing agreement requirements, we could experience an impairment or loss of the financed project.
- The impacts of significant economic downturns (i.e., recession) could lead to decreased volumes delivered and increased expense for uncollectible customer balances.
- We may be adversely affected by the effects of sustained inflation.
The other 35 risks
- Long-lived assets, goodwill, and other assets could become impaired.
- We could incur substantial costs in the event of non-performance by third parties under indemnification agreements. We are exposed to other credit risks in the power markets that are beyond our control.
- Expiration or termination of our PPAs and other contractual agreements may significantly reduce our revenue and allow the counterparty or customer to seek liquidated damages.
- Risks Related to Legislative, Regulatory, and Legal Factors
- Federal or state legislative or regulatory actions could negatively affect the scope and functioning of the wholesale markets.
- Our business is highly regulated and could be negatively affected by legislative and/or regulatory actions.
- NRC actions could negatively affect the operations and profitability of our nuclear generating fleet.
- We could be subject to higher costs and/or penalties related to mandatory reliability standards.
- We could incur substantial costs to fulfill our obligations related to environmental and other matters.
- We could be negatively affected by federal and state RPS and/or energy conservation legislation, along with energy conservation by customers.
- Our financial performance could be negatively affected by risks arising from our ownership and operation of hydroelectric facilities.
- We could be negatively affected by challenges to tax positions taken, tax law changes and the inherent difficulty in quantifying potential tax effects of business decisions.
- Following the Calpine acquisition in January 2026, we have several government awards for projects involving cost-share agreements with the DOE, which could be affected by our inadvertent failure to comply with certain laws, rules, and regulations.
- Legal proceedings could result in a negative outcome, which we cannot predict.
- We could be subject to adverse publicity and reputational risks, which make us vulnerable to negative customer perception and could lead to increased regulatory oversight or other consequences.
- Risks Related to Operational Factors
- We are subject to risks associated with weather, including its effect on the supply and demand for electricity, as well as impacts from climate change, including extreme weather events.
- We are subject to certain risks associated with the operation and maintenance of generation facilities.
- Our financial performance could be negatively affected by matters arising from our ownership and operation of nuclear facilities.
- Nuclear major incident risk and insurance.
- Decommissioning obligation and funding.
- The productivity of Calpine's geothermal resources acquired in January 2026 may be lower than expected, and it is possible that certain of leases for geothermal steam fields may not be renewed or may be renewed at less favorable terms.
- We are subject to evolving physical security, cybersecurity, and third-party reliability risks.
- The rapid development and integration of AI technologies into our processes presents several risks to our business.
- Our employees, contractors, customers and the general public could be exposed to a risk of injury due to the nature of the energy industry.
- Natural disasters, war, acts and threats of terrorism, pandemic and other significant events could negatively impact our results of operations, ability to raise capital, and future growth.
- Our business is capital intensive, and our assets could require significant expenditures to maintain and are subject to operational failure, which could result in potential liability.
- Our performance could be negatively affected if we fail to attract and retain an appropriately qualified workforce.
- We could make acquisitions or investments in new business initiatives and new markets, which may not be successful or achieve the intended financial results.
- The demand for our generation may be impacted by changes in industry trends, including the demand associated with the developing data economy.
- Risks Related to the Acquisition of Calpine
- We cannot assure that we will continue paying dividends at the current rate.
- Our shareholders prior to the merger have a reduced ownership and voting power after the merger, and former Calpine stockholders are not obligated to maintain their ownership interest indefinitely.
- The merger may not be accretive to earnings and may cause dilution to our earnings per share, which may negatively affect the market price of our common stock.
- We have incurred and will incur significant transaction- and merger-related costs, and these costs may be more than anticipated, negatively impacting our operating results.
- We may not realize all the expected benefits of the merger because of integration challenges.
- Uncertainties associated with the merger may cause a loss of management personnel and other key employees, which could adversely affect the future business and operations of the combined company.
- The merger may divert significant attention of our management team, which could detract from efforts to meet business goals.
Sources
The numbers on this page point here. Each one links to the record it came from.
- 1
- 2
- 3
- 4SEC EDGAROther events
- 5
- 6
- 7SEC EDGAREntered a material agreement
- 8
- 9SEC EDGAREntered a material agreement
- 10
- 11
- 12SEC EDGARNew debt or obligation
- 13
- 14SEC EDGAROther events
- 15SEC EDGAROther events
- 16
- 17
- 18
- 19USAspending.govDENE0009042: Department of Energy
- 20USAspending.govDEEE0008849: Department of Energy
- 21USAspending.govFC07-02ID14412: Department of Energy
- 22USAspending.govDENE0009427: Department of Energy
- 23USAspending.gov36C26319P0785: Department of Veterans Affairs
- 24USAspending.govINF50181AM025: U.S. Fish and Wildlife Service
- 25USAspending.govINF11PC00177: U.S. Fish and Wildlife Service
- 26USAspending.govINF50181AM121: U.S. Fish and Wildlife Service
- 27USAspending.gov36C24721P0923: Department of Veterans Affairs