Private company

Eglin Air Force Base Railroad

Military railroad in Florida, U.S.

The Eglin Air Force Base Railroad was a 45-mile (72 km) military railroad at Eglin Air Force Base (AFB) in Florida. It was created in 1951, and was operational until the late 1970s.2 Wikipedia text CC BY-SA 4.0

Last updated Oct 21, 2026.

Overview

RSD-1
Photo: Attribution, via Wikimedia Commons4

The Eglin Air Force Base Railroad was a 45-mile (72 km) military railroad at Eglin Air Force Base (AFB) in Florida. It was created in 1951, and was operational until the late 1970s.2

The story

Col. George P. Kendrick, chief of installations of the Air Proving command, announced on 11 August 1949, that negotiations were underway between the U.S. Air Force and the chief of the U. S. engineers relative to salvaging railroad materials at Camp Claiborne and Camp Polk, Louisiana, the Playground News, Fort Walton, Florida, reported on 18 August 1949. Kendrick stated that Third Army headquarters had indicated that the 44th Engineers Construction battalion, now in training at Fort Bragg, North Carolina, would do the work on moving the railroad materials to the new location. Although no official date had been set, an unofficial report gave 15 November as an approximate arrival date for the engineer battalion.

The Eglin Air Force Base (AFB) railroad was first constructed from an interchange with the Louisville and Nashville Railroad (L&N) at Mossy Head, Florida, down to the main base complex, with spurs to Auxiliary Fields 1 and 2, the ammunition dump, and other parts of the military reservation, with a total of 45 miles (72 km) of track. It was constructed with materials salvaged from the Claiborne and Polk Railroad, a 43-mile (69 km) line between the two camps, abandoned in 1945. The line, nicknamed the "B & F" (for back and forth), began operation on 1 February 1952 as part of the transportation division, Air Proving Ground Command, and utilised two ALCO RSD-1 military diesel-electric locomotives for road work and one 80-ton General Electric centercab for switching the yard. Its first yard manager was Shelby White. In 1955, the locomotive mechanic was Roy Parker of the 3201 VRS Squadron.

Part of the main base track and spur to the ammunition dump was realigned in 1956 with the construction of the 12,000-foot-long (3,700 m) runway 32/14 and the Strategic Air Command dispersal area.

Initial construction of a railroad line into the region had been discussed as early as 1927 as part of the Choctawhatchee and Northern Railroad, though military-use proposals did not come forward until 1941. German POWs were used in clearing and grading the alignment during World War II. There was one commercial customer served by the line, a lumber pulp yard at Niceville which is now community athletic fields. The line was later abandoned in the late 1970s and the southern end, west of State Road 285, pulled up by the mid-1980s. Much of the trackage remains in place from the former L&N (now CSX) interchange to just south of Bob Sikes Road, about 11 miles (18 km) long, albeit overgrown. Building 538, formerly the two-track, four-engine capacity engine house, serves as the vehicle maintenance corrosion control shop in 2009. Two of its four oversize doors have been walled closed. The (by then) four RSD-1 diesels were donated to the Tennessee Valley Railroad Museum.

From Wikipedia’s article on Eglin Air Force Base Railroad, shared under CC BY-SA 4.0.3

Sources

The numbers on this page point here. Each one links to the record it came from.

  1. 1
  2. 2
  3. 3
  4. 4