Processing plants
Gassco operates three Norwegian gas processing plants, namely the Kårstø processing plant, the Kollsnes processing plant and the Nyhamna processing plant.
The Kårstø plant, north of Stavanger, plays a key role in the transport and treatment of gas and condensate (light oil) from central parts of the Norwegian continental shelf. This facility separates the rich gas arriving in the Statpipe and Åsgard Transport pipelines into its various components. It also handles unstabilised condensate piped from the Sleipner area. These flows yield methane, ethane, propane, iso and normal butane, naphtha (natural gasoline) and stabilised condensate.
Dry gas – methane and some ethane – is transported on through Statpipe dry gasand Europipe II, while the natural gas liquids and condensate are exported by ship.Kårstø ranks as one of the world's largest producers of liquefied petroleum gases – propane and butanes – and this LPG is shipped to customers world-wide. The facility had 638 ship calls in 2006 to load LPG, naphtha and stabilised condensate. Propane is stored in two large artificial rock caverns with a combined capacity of 250 000 m3. Ethane, normal and iso butane, naphtha and stabilised condensate are held in tanks. First gas reached the complex on 25 July 1985 through a pipeline from the Statfjord field in the North Sea, and the first dry gas was piped on to Emden in Germany on 15 October that year. Kårstø runs primarily on fuel gas. Five of its nine compressors use this energy source, while the remaining four are electrically powered.
The gas processing plant at Kollsnes forms part of the Troll Gas development, and became operational on 1 October 1996. The processing capacity at Kollsnes has been increased several times since the facility became operational. Today the daily processing capacity is up to 143 million scm of gas and 69 000 barrels of NGL, piped in from the Troll, Kvitebjørn and Visund fields. The increased capacity at Kollsnes is a result of several considerable investments. In 2004 a new NGL extraction plant started up, in 2005 a new compressor was installed on the Troll A platform and in 2006 a sixth export compressor became operational at Kollsnes. The treatment process at Kollsnes involves separating out the NGL, and compressing the dry gas for export via Statpipe, Zeepipe, Europipe I and Franpipe. The Vestprosess system ties Kollsnes to the oil refinery at Mongstad with a pipeline for NGL. Gas has been delivered from the Troll processing plant to the nearby Kollsnes Industry Park since 1999.
Read the full text
Gassco submitted a decommissioning program in February 2024 for the removal of the Knarr Gas Pipeline. The pipeline was fed from the Knarr Field which ceased production in May 2022.
In April 2024, Gassco signed a memorandum of understanding (MoU) with Gascade Gastransport GMBH for a new hydrogen pipeline in the North Sea between Germany and Norway.
Gassco was authorized in April 2025 by the Norwegian Ocean Industry Authority that it can add a new connection point from the Troll B platform to the Kvitebjørn pipeline.
Pipelines and platforms
Gassco is responsible as operator for transporting Norwegian gas to continental Europe and the UK through a 7 975-kilometre network of pipelines.
Haltenpipe
Europipe Archived 2017-04-17 at the Wayback Machine
Europipe II Archived 2014-05-02 at the Wayback Machine
Norne Gas Transport
Franpipe
Åsgard Transport
Norpipe
Statpipe Rich Gas
Statpipe Dry Gas
Vesterled
Oseberg Gas Transport
Zeepipe
Langeled
Tampen Link
Kvitebjørn gas export
Gjøa gas pipeline
Platforms
Draupner S/E Archived 2014-05-02 at the Wayback Machine
Heimdal Riser
B-11