Private company

Gettysburg Electric Railway

Borough trolley serving Gettysburg Battlefield attractions

The Gettysburg Electric Railway was a borough trolley that provided summer access to Gettysburg Battlefield visitor attractions such as military engagement areas, monuments, postbellum camps, and recreation areas (e.g., Wheat-field Park and the Pfeffer baseball diamond). Despite the 1896 Supreme Court ruling under the Takings Clause against the railway, battlefield operations continued until 1916.2 Wikipedia text CC BY-SA 4.0

Last updated Oct 21, 2026.

Overview

1904 Cope map - Gettysburg Electric Railway
Photo: Emmor Cope et al, Public domain, via Wikimedia Commons4

The Gettysburg Electric Railway was a borough trolley that provided summer access to Gettysburg Battlefield visitor attractions such as military engagement areas, monuments, postbellum camps, and recreation areas (e.g., Wheat-field Park and the Pfeffer baseball diamond). Despite the 1896 Supreme Court ruling under the Takings Clause against the railway, battlefield operations continued until 1916. The trolley generating plant was leased by the Electric Light, Heat, and Power Company of Gettysburg to supply streetlights and homes until electricity was imported from Hanover.2

The story

The Gettysburg Electric Railway Company was chartered August 4, 1891, and incorporated July 28, 1892. In January 1893 the borough of Gettysburg granted trolley right-of-way for all principal streets, and the $150,000 bond was for street operations planned for July 1, 1893. The railway eventually secured rights-of-way for a route west and north of the borough to the area of the Battle of Gettysburg, First Day; but which were never built.

Railbed construction began in April 1893, and the electric power company was chartered on June 15. Tracks were planned along The Angle's stone wall, but instead the trolley used 8,400 ft (2,600 m) of the Emmitsburg Road on which trolleys crossed the Round Top Branch (the trolley was denied right-of-way on the steam train line in both 1893 and 1913.) Beginning April 1, 1894, the trolley was extended from Wible's Woods through Tipton Station to Round Top Station (the line had 7 stops). A new trolley powerhouse of Hummelstown brownstone replaced the original which had burned down by January 22, 1895; and by October 1895 total trackage was 8.5 miles (13.7 km). The 1896 Supreme Court ruled in US v. Gett. Elec. Ry. Co. that the use of eminent domain for historic preservation "seems" to be "a public use".

From Wikipedia’s article on Gettysburg Electric Railway, shared under CC BY-SA 4.0.3

Sources

The numbers on this page point here. Each one links to the record it came from.

  1. 1
  2. 2
  3. 3
  4. 4