Private company

Hisatsu Orange Railway

Logo: Hisatsu Orange Railway Co., Ltd., Public domain, via Wikimedia Commons3

Japanese third-sector railway company

Hisatsu Orange Railway Co., Ltd. (肥薩おれんじ鉄道株式会社, Hisatsu Orenji Tetsudō Kabushiki-gaisha) is a third-sector railway company which operates Hisatsu Orange Railway Line in the Kumamoto and Kagoshima prefectures. The line follows the former part of the JR Kyushu Kagoshima Main Line that connected Yatsushiro and Sendai in the Kumamoto and Kagoshima Prefectures, known historically as the Higo and Satsuma Provinces. The length of the line is 116.9 km.2 Wikipedia text CC BY-SA 4.0

Last updated Oct 21, 2026.

Overview

Oct 31, 2002Founded1
Yatsushiro station 2
Photo: MK Products, CC BY-SA 3.0, via Wikimedia Commons5

Hisatsu Orange Railway Co., Ltd. (肥薩おれんじ鉄道株式会社, Hisatsu Orenji Tetsudō Kabushiki-gaisha) is a third-sector railway company which operates Hisatsu Orange Railway Line in the Kumamoto and Kagoshima prefectures. The line follows the former part of the JR Kyushu Kagoshima Main Line that connected Yatsushiro and Sendai in the Kumamoto and Kagoshima Prefectures, known historically as the Higo and Satsuma Provinces. The length of the line is 116.9 km.2

The story

The Sendai–Yatsushiro section was built by the (then) Japanese Imperial Railway and opened between 1922 and 1927, at which time this route replaced the Hisatsu Line to become the southern part of the Kagoshima Main Line.

The Yunoura–Tsunagi section was duplicated between 1966 and 1968. CTC signalling was commissioned from Yatsushiro–Sendai in 1969/70, and the line was electrified in 1970.

In 2004, following the opening of the Kagoshima–Shin Yatsushiro section of the Kyushu Shinkansen, operation of the section was transferred under the Third Sector arrangements.

Former connecting lines

Minamata Station: The first section of the Yamano line was opened from Kurino (on the Hisatsu Line) 24 km to Yamano in 1921. The 14 km Minamata–Kugino section opened in 1934, and the 10 km Yamato–Satsuma section the following year. In 1937 the 8 km Kugino–Satsuma section, including the Okawa spiral opened. Freight services ceased in 1986, and the line closed in 1988.

From Wikipedia’s article on Hisatsu Orange Railway, shared under CC BY-SA 4.0.4

Timeline

  1. Oct 31, 2002Founded Founded1