The story
Founded by Adélard Godbout on Apr 14, 1944, in Montreal.1
1945–1959: beginnings and development
In Quebec, advocates for the creation of a public hydroelectric utility protested against high costs, poor rural electrification, and the lack of French speakers in management positions in hydroelectricity companies. In 1944, Montreal Light, Heat & Power company was nationalised, along with its subsidiary, Beauharnois Power, and Hydro-Québec was created to manage the companies.
Quebec Premier Adélard Godbout adopted a policy of investing 10 million dollars per year in rural electrification. However, in 1944 the government changed, and the new premier Maurice Duplessis was opposed to any form of government intervention in the economy. Local cooperatives were created to bring power to rural areas.
Duplessis remained in power until 1960, and during that time there were no further nationalisations of companies, and Hydro-Québec mostly served the Montreal area.
Major projects included:
Bersimis-1 generating station completed in 1956, 1,125 MW
Bersimis-2 generating station completed in 1959, 845 MW
Beauharnois Hydroelectric Generating Station completed in 1961, 1,903 MW.
Carillon Generating Station built 1959–1964, 752 MW
Read the full text
Between 1944 and 1962, Hydro-Québec's installed capacity increased from 616 to 3,661 MW while lowering residential power rates by half in the Montreal area.
1960–1979: the second nationalization
Duplessis's conservative reign, now known as the Grande Noirceur, ended when he died in office in 1959. The subsequent election of the Quebec Liberal Party, led by Jean Lesage, marked the beginning of the Quiet Revolution, a period of reform and modernization. In 1962, the US government lent Quebec $300 million. The funds were used to acquire independent power companies. The new government gave Hydro-Québec an exclusive mandate to develop new sites. In 1963 the government authorized it to acquire private electricity distributors, including the Gatineau Power Company and the Shawinigan Water & Power Company Hydro-Québec achieved province-wide scope. All of the 46 rural coops accepted Hydro-Québec's 1963 buyout offer, except Saint-Jean-Baptiste-de-Rouville which still exists. In 1964, the Province of British Columbia provided the Province of Quebec with a $100 million loan. $60 million from that loan went to Hydro-Québec. The loan faced controversy in the Quebec legislature. Major projects during this period included:
Manicougan-Outardes Project, a 7-dam hydroelectric complex including the Jean-Lesage generating station (1,145 MW), René-Lévesque generating station (1,244 MW), and the Daniel-Johnson Dam (2,596 MW), originally named Manic-2, Manic-3, and Manic-5 respectively. Because these stations were 700 kilometres (400 miles) away from the urban centres in southern Quebec, through transmission line voltage was stepped up to 735 kV for the first time anywhere, led by engineer Jean-Jacques Archambault.
Churchill Falls Generating Station, 5,428 MW. The station is in Labrador and the government of Quebec negotiated a contract where Hydro-Québec buys power from the project at 1969 prices until the year 2041. That contract had been a source of conflict between the two provinces. In December 2024, Newfoundland premier Andrew Furey and Quebec premier François Legault signed a 50-year Memorandum of understanding that would not terminate the original contract but see Hydro-Quebec paying the Churchill Falls operating company a fixed amount above the original price contracted in 1969 while remaining well below fair market value for the electricity. If ratified by both provinces, Hydro-Quebec would pay an average of 2.7 cents per kilowatt hour for electricity from CF until 2075.
Phase I of the James Bay Project.
Hydro-Québec worked with Atomic Energy of Canada Limited to build the CANDU reactor equipped Gentilly Nuclear Generating Station, which closed in 2012.
1980–1996: restructuring
Because of the economic climate, demand for electricity dropped significantly in the early 1980s, which led to structural changes at Hydro-Québec. It became a joint stock company whose sole shareholder is Government of Québec, to which it pays an annual dividend. It was also given the mandate to export power and to work in any energy-related field.
In 1986 the Quebec – New England Transmission began bringing power from the James Bay Project 1,100 kilometers (700 miles) south to the Boston area.
Phase II of the James Bay Project started in 1987 and took nine years to complete. Construction of the Denis-Perron Dam began in 1994.
1997–present: renewed growth
Like its counterparts in the North American utility industry, Hydro-Québec was reorganized in the late 1990s to comply with electricity deregulation in the United States. The transmission division, TransÉnergie, was the first to be spun off in 1997, in response to the U.S. Federal Energy Regulatory Commission's publication of Order 888. In the same year, the U.S. Federal Energy Regulatory Commission granted Hydro-Québec a licence to sell wholesale electricity at market prices, enabling Hydro-Québec to expand its market. Hydro-Québec also acquired a substantial share of Noverco, controller of natural gas distributor Énergir, to participate in that market in northeastern North America.
In 2002 the Agreement Respecting a New Relationship Between the Cree Nation and the Government of Quebec between the Grand Council of the Crees and the Quebec government made possible the development of the Eastmain Reservoir. The Eastmain-1-A and Sarcelle powerhouses and Rupert River diversion project were completed for $5,000 million CAD. This will provide water power to the turbines at Eastmain-1, Eastmain-1-A and Sarcelle powerhouses and will provide increased flow at the existing La Grande-1 generating station as well as Robert-Bourassa and the La Grande-2-A generator stations. Output will be 918 MW.
Other stations commissioned since 1997 are:
Sainte-Marguerite-3 in 2003, 882 MW.
Péribonka in 2008, 385 MW.
Rocher-de-Grand-Mère in 2004, 230 MW.
Eastmain-1in 2007, 480 MW
Rapide-des-Cœurs in 2009, 76 MW.
Chute-Allard in 2009, 62 MW
Mercier in 2009, 55 MW.
Bernard-Landry in 2012, 768 MW
La Sarcelle in 2013, 150 MW.
Romaine-2 in 2014, 640 MW.
Romaine-1 in 2015, 270 MW.
Romaine-3 in 2017, 395 MW.
Romaine-4 in 2022, 245 MW.
Major outages
In 1988, all of Quebec and parts of New England and New Brunswick lost power because of an equipment failure at a substation on the North Shore. The March 1989 geomagnetic storm tripped circuit breakers on the transmission network causing a nine-hour Quebec-wide blackout.
In the North American ice storm of 1998, five days of freezing rain collapsed 600 kilometres (370 mi) of high voltage power lines and over 3,000 kilometres (1,900 mi) of medium and low voltage distribution lines in southern Quebec. Up to 1.4 million customers were without power for up to five weeks.
From Wikipedia’s article on Hydro-Québec, shared under CC BY-SA 4.0.5