The story
Innergex Renewable Energy was founded in 1990 by Gilles Lefrançois under the name Innergex GP in response to the Québec government's call for private sector bids to develop small hydro generation facilities. The firm went on to develop four of its own projects (Saint-Paulin, Chaudière, Batawa and Pontneuf 1-2-3) and acquire another (Montmagny) before transferring these assets into the Innergex Renewable Energy Income Fund, which listed on the Toronto Stock Exchange in 2003.
In 2004, Innergex joined forces with TransCanada Corporation to bid on a Hydro-Québec call for tender for 1,000 MW of wind power. The two companies set up a joint venture, Cartier Wind Energy, with Innergex holding a 38% stake. In 2005, Cartier signed 20-year power purchase agreements for 739.5 MW to be generated at six locations on the Gaspé Peninsula. Five of the six projects were built between 2006 and 2012, including the 211.5 MW Gros-Morne Wind Farm, which became Canada's largest at the time of its commissioning, in late 2012.
In 2018, Innergex acquired Alterra Power Corporation, which made the company the largest independent renewable energy producer in British Columbia and among the largest in Canada. Four years later, it acquired what was left of Llaima Energía (50%) & Aela Energía the at the moment largest green energy provider in MW terms in Chile
In February 2025, La Caisse announced a bid to buy Innergex Renewable Energy in deal valued at $10 billion. The acquisition was completed on July 21, 2025.
From Wikipedia’s article on Innergex Renewable Energy, shared under CC BY-SA 4.0.5