The story
History
The 15+1⁄2-mile (25-kilometre) line from Douglas to Port Erin is the last remaining line of the former Isle of Man Railway Company, formed in 1870. Its first line, from Douglas to Peel, opened on 1 July 1873, followed by the Port Erin line on 1 August 1874. Initially the Port Erin line had been planned to terminate at Castletown, but the construction of deep water docks at Port Erin caused an extension to the line. A few years after completion, the dock was destroyed by heavy seas and the idea of deep water vessels abandoned there. The remains of the breakwater are still visible at low tide.
A third line was built in 1878–1879 by the Manx Northern Railway, from St John's (on the Douglas to Peel line) to Ramsey. A further short line was constructed from St John's to Foxdale in 1885 to serve the lead mines there. Although it was built by the nominally independent Foxdale Railway, it was leased to and operated by the Manx Northern. The loss of the mineral traffic from Foxdale and competition for the Douglas-Ramsey passenger traffic from the Manx Electric Railway placed the Manx Northern Railway in financial difficulties. It was taken over by the IMR in 1904.
During the mid-1920s the IMR formed a bus subsidiary that operated most of the Island's bus services, and helped the railway to remain profitable into the 1960s. The first serious examination of the long term viability of the railway came with the Howden Report in 1949, which recommended the closure of the Ramsey line, which was already losing money; the eventual closure of the Peel line, which was breaking even in the late 1940s; and the retention of the then profitable Port Erin line. Howden also reported that the existing equipment of the railway had an economic life of 10–25 years. Economies were made throughout the 1950s and early 1960s. These included the ending of evening and Sunday services, the deferral of track maintenance, and cuts to train mileage as locomotives became unserviceable. To further reduce expenses, there were winter closures of the Peel line (1960–61 only) and the Ramsey line after September 1961, but A. M. Sheard, the then general manager, refused to close the Ramsey line which by this time was losing a considerable amount of money each year.
Following the closure of the County Donegal Railways in 1960, the IMR purchased the CDR's two most modern diesel railcars, which were then largely used on the Peel line in summer, and after 1962 worked the whole of the winter service except when withdrawn for maintenance. The system closed after the 1965 season but was briefly revived when the Marquess of Ailsa obtained a lease and reopened all three routes in 1967. Both the Peel and Ramsey lines shut following the 1968 season, but goods services between Peel and Milntown (just short of Ramsey) continued until mid-1969. Traffic was poor on the two northern lines, especially that to Ramsey, so after the end of the 1968 season, Ailsa decided to concentrate on passenger service on the South Line for three more seasons until he took the option to end his lease at the close of the 1971 season.
There were occasional empty coaching stock workings between Douglas and St John's in 1970 and 1971 for the retrieval of stored stock between seasons. During this time most of the early wooden framed carriages were moved to St John's, where they were lost in a fire in July 1975. The Peel and Ramsey routes and the Foxdale line were lifted in 1975. The IMR operated services between Douglas and Port Erin after Lord Ailsa took his five-year option, beginning in 1972 through the centenaries of the Peel and Port Erin lines in 1973 and 1974 respectively. In 1975, the Port Erin line operated only from its southwestern terminus to Castletown, but it was found that half a railway made twice the loss. The government sponsored a short extension of the service from Castletown to Ballasalla in 1976, and, after extensive campaigning during the 1976 Tynwald elections, the railway returned to Douglas in 1977, the last year in which the railway was operated by the IMR. Following nationalisation the railway has continued to be operated seasonally, for many years from Easter weekend until the end of September, more recently from around 1 March to early November.
1873–1966
The railway operated a modest local train service throughout the year, which was considerably augmented during the summer months to accommodate tourist traffic. Traffic was driven by three requirements: the need to connect with the ferries to and from Britain and Ireland, on-island transportation for tourists, and local passenger traffic. It was common for three or four timetables to be produced each year reflecting seasonal trends, and these would be published in the local newspapers. Winter traffic declined sharply after the 1920s, but it was not until 1960 that the railway was effectively "closed" for spells during the winter, with services only operating on certain days mainly for parcels traffic. This continued until November 1965 when the railway was closed "for essential maintenance to take place". No trains ran in 1966 but the following year it reopened on a seasonal basis as a tourist attraction as detailed above.
1967–1968 Lord Ailsa
The entire network was leased by Archibald Kennedy, 7th Marquess of Ailsa and the lines reopened on 3 June 1967 operating an intensive service, especially on the Peel Line, until September; the following year saw a reduced timetable of operation but proved to be the final year of the lines serving Peel and Ramsey. This has become known as the Ailsa Period known for the change of livery to spring green carried by the locomotives. The timetables utilised the Peel and Port Erin lines heavily, whilst there was no service to Ramsey on certain days, and then only a limited service ran.
1969–1972 Port Erin line only
From 1969 only the southern route to Port Erin was operated. Services generally operated from May to September thereafter still under the auspices of Lord Ailsa; the former lines remained in situ but disused, save for occasional stock movements to the carriage shed at St John's for the winter storage of rolling stock. A limited oil tanker service operated only in 1969. At this time the now traditional pattern of four trains each way per day was adopted and it is this pattern of operation that broadly speaking remains in place today.
Read the full text
1973–1974 centenaries
Lord Ailsa took his five-year option on a 21-year lease and relinquished duties to operate trains from the close of the 1972 season and the Railway Company again took over services with subsidy from the Isle of Man Tourist Board. The centenaries of the Peel and Port Erin lines were commemorated with special trains on the anniversary days in these two years. Services continued to operate on the four each way per day pattern with additional services at peak times in the summer months to coincide with Island events.
1975–1977 curtailments
In a cost-cutting measure, trains only operated between Port Erin and Castletown in 1975, and Port Erin and Ballasalla in 1976. The line to Douglas was still maintained as locomotives and rolling stock returned there to receive maintenance. There was much political controversy over the short-line workings and services were ultimately restored in 1977 although rails were lifted on the closed sections during this time. 1977 proved to be the final year of Railway Company operation of the line, again on a familiar seasonal basis with four trains each way per day between May and September.
1978–1986 nationalisation
Various timetables were experimented with in the early period of nationalisation; Notable in this period were the Friday only Winter Shoppers trains which ran during the 1981–1982 and 1983-1983 winter periods, with only one train from Port Erin and return each day. Generally trains operated for Easter Week and the full season began at the end of May to coincide with the annual T.T. race period and ran until the last weekend of September. Aside from the popular Santa Trains, which have operated since 1985 the line remained closed in the winter months. Also of note are the shuttle services which operated between Douglas and the country park at Lough Ned (mid-way to Port Soderick), which ran in peak season and often utilised the railcars; a platform was provided for this service, which saw the last regular use of the railcars in passenger service.
1987–1999 anniversaries
Trains operated for Easter Week with the main season running from mid-May each year; from 1987 trains ran seven days a week in this period (previously there had been no Saturday service for several years) and many additional and extra timetables ran for the Year of Railways in 1993, the International Railway Festival in 1995 and Steam 125 event in 1998. Certain years also saw skeleton services operating in October and November, in conjunction with various off-season attractions on the Island, although the pattern of passing trains at Ballasalla was adhered to. A familiar pattern during this period was the operation of an additional train on Mondays-Thursdays in July and August which left Douglas mid morning (10:50) and returned from Port Erin at 17:30, utilising the long-closed station at Port Soderick to pass the regular service trains. It was common for a shuttle service to link Port Erin and Castletown during the closure of the Billown Circuit for racing during this time.
2000–2009: New millennium
The season was extended so that a daily service also operated during October half term after a three-week closure from the end of September. In some years, Castletown station was used as a passing loop instead of Ballasalla. There was major disruption to services for three years from 2000 when a sewer pipe was laid beneath the railway. This resulted in short line workings from Douglas to Santon, and various shuttles between Port Erin, Port St Mary and Castletown before the full line was reinstated. A courtesy coach was provided during this period to bridge the gap of the closed sections for passengers. The extra peak season train was dropped during this period, and the usual timetable had only four departures from each terminus. From 2007 a commuter service operated during the TT races, and in the first two years this also ran during Manx Grand Prix week.
From Wikipedia’s article on Isle of Man Railway, shared under CC BY-SA 4.0.3