Private company

Maryland Transit Administration

Logo: Maryland Transit Administration, PD, via Wikipedia3

Public transit authority of the state of Maryland

The Maryland Transit Administration (MTA) is a state-operated mass transit administration in Maryland, and is part of the Maryland Department of Transportation (MDOT). The MTA operates a comprehensive transit system throughout the Washington-Baltimore metropolitan area. There are 80 bus lines serving the Baltimore Metropolitan Area, along with rail services that include the Baltimore Light RailLink, Baltimore Metro Subway, and MARC Train.2 Its chief executive is Kevin B. Quinn (since 2017).1 Wikipedia text CC BY-SA 4.0

Last updated Oct 21, 2026.

Overview

Apr 30, 1970Founded1

The Maryland Transit Administration (MTA) is a state-operated mass transit administration in Maryland, and is part of the Maryland Department of Transportation (MDOT). The MTA operates a comprehensive transit system throughout the Washington-Baltimore metropolitan area. There are 80 bus lines serving the Baltimore Metropolitan Area, along with rail services that include the Baltimore Light RailLink, Baltimore Metro Subway, and MARC Train. In 2025, the system had a ridership of 67,092,400, or about 227,000 per weekday as of the second quarter of 2026.2

Corporate structure

Maryland Transit Administration sits at the top of its group. 2 entities, 1 country on record. Switch between the flow chart and the network, and select any entity to see its details.

  • Maryland Transit Administration Baltimore
    • Maryland Transit Administration Police Subsidiary · United States
    • Baltimore Metro SubwayLink railway line Owned · Baltimore, United States

Built from subsidiaries, stakes and holdings from Wikidata (CC0); major holders from Schedules 13D and 13G. Each entity in the chart links to its source.

What it owns

What Maryland Transit Administration reports owning in its annual reports to the SEC: buildings, land and equipment, real estate and locations, investments, intangible assets and inventory, at the end of its latest fiscal year and a year before.

Stakes and holdings (Wikidata)

  • Baltimore Metro SubwayLink railway line

Things Wikidata records the company as owning, with the share when stated.1

The story

The MTA took over the operations of the old Baltimore Transit Company on April 30, 1970. It was originally known as the Baltimore Metropolitan Transit Authority, then the Mass Transit Administration before it changed to its current name in October 2001.

Many of the routes of most of the agency's current bus lines are based on the original streetcars operated by the Baltimore Transit Company and its parent companies from the 1890s to the 1960s. All these routes were ultimately converted to rubber tire bus operations, and many of them were consolidated, extended into newly developed areas, or otherwise reconfigured to keep up with the ridership demands of the times. Additional routes and extensions were added in later years to serve communities that were later developed, and to feed into Metro and Light Rail stations that were later built.

With the growth in popularity of the private automobile during the 20th century, pushed along by active corporate sabotage of streetcar systems nationwide, streetcar and bus ridership declined, and the perceived need for public transportation changed. Mass transit in Baltimore and other cities shifted from corporate operations to services funded and run by the government. The amount of service provided was greatly reduced, and some areas once served by streetcars are currently served by buses very minimally or not at all.

The demise of the Baltimore streetcar took place between the years of 1947 and 1963, as operators found buses to be low maintenance and more cost-efficient. As rails were demolished and paved over, Baltimore was no longer a streetcar city. As transit needs and trends changed, rail transit did return to the city, with the Metro Subway opening in 1983 and the Light Rail in 1992. The track gauge was 5 ft 4+1⁄2 in (1,638 mm), a unique gauge.

From Wikipedia’s article on Maryland Transit Administration, shared under CC BY-SA 4.0.4

Leadership

Who has led Maryland Transit Administration, and when. Pick a name to see everywhere that person has worked.

19801990200020102020

Products and brands

Rail services

Interactive map of the Maryland Transit Administration's rail services

Rapid transit

This system operates elevated and underground from a corporate and shopping complex in Owings Mills in Baltimore County into the heart of Downtown Baltimore City's business, shopping and sightseeing districts to the world-renowned Johns Hopkins Medical Center Complex. The 15.5-mile (24.94 km) northwest-southeastbound route includes 14 station stops. Its route through the densest parts of the city is underground, from Hopkins Hospital to a portal west of Mondawmin station, where it immediately rises to an elevated concrete right of way parallel to Wabash Avenue practically at the city line.

Entering Baltimore County, the line goes to the surface, passing through communities along the way to commuter-based stops at Milford Mill Road (Pikesville) and Old Court Road (Pikesville). From Old Court, the tracks pass underneath the I-695/795 interchange and travel the median of 795 till their end at Owings Mills (Painter's Mill Road) This station is the centerpiece of a huge project urbanizing that immediate area, with a Baltimore County Public Library branch, and classroom space for the Community College of Baltimore County. Residential and commercial development is planned to follow the completion of the education buildings.

There were efforts underway to extend the line northeast through the city with phase 1 to Morgan State University and phase 2 beyond the city limits to the White Marsh Town Center area. If they come to fruition, the line will be renamed the Green Line, coordinating with the Red Line (east-west Woodlawn/Security-Hopkins Bayview Hospital) which Maryland Governor Larry Hogan cancelled on June 25, 2017, with the creation of Baltimore Link. Baltimore's plans for transit were not mapped and $900 million of federally funded money was sent back. Funding for the Green Line extension is still years from being secured but includes an option to extend it as light rail or BRT from Johns Hopkins Hospital.

Read the full text

Light rail

This service travels from a corporate, hotel, and shopping complex in Baltimore County's Hunt Valley, through the suburbs north of Baltimore and northern Baltimore and into the heart of downtown Baltimore's shopping, sightseeing, dining, and entertainment districts, past the harbor and through southern Baltimore and finally to BWI Marshall Airport and Cromwell Station/Glen Burnie in Anne Arundel County. There is also a spur to Amtrak's Baltimore Penn Station.

The Light RailLink operates at grade for the most part, though it travels on bridges crossing several bodies of water. There are 33 station stops along the 30.0-mile (48.28 km) system. Although much of the line was single-tracked when it was built, the MTA completed a double-tracking project on February 26, 2006, and now only a few short single-track sections remain.

Commuter rail

This service operates three lines that provide commuter rail service to riders out of and into Baltimore, Washington, D.C., Frederick, Perryville, and Martinsburg, WV, as well as several other locations in between.

Mobility services

Paratransit

The MTA began offering paratransit service for persons with disabilities in 1978 when it took over a mobility service in Baltimore previously operated by Lutheran Family Services. This mobility service is a "non-fixed route" service and consists of a fleet of specially converted Ford E-Series vans and Ford Crown Victorias. Some service is contracted out to MV Transportation and Transdev, but all vehicles are owned by MTA.

Taxi Access

A sub-service of the Paratransit program is MTA's Taxi Access program. The Taxi Access program ensures that any sufficiently physically disabled person that consistently requires Paratransit service can also qualify for the Taxi Access program. The Taxi Access program allows the bearer of a Taxi Access card to take a taxicab door-to-door within the limits of anywhere MTA Paratransit vans go; i.e. within 1/3 of a mile of an MTA public transit stop of any kind. Once the trip is complete, total out-of-pocket cost for the customer is $3.00, and the MTA picks up the rest of the price of the fare, "paying" it to the driver in the form of a voucher that s/he later redeems at his/her cab company headquarters.

Future service

The MTA is building the Purple Line, a light rail system that will operate between Bethesda and New Carrollton with connections to the Washington Metro. As of early 2026, MTA is projecting that the line will begin passenger operations in late 2027.

Proposed services

The MTA has studied a number of proposed services, which included the Red Line (a proposed east–west light rail line that would have passed from Woodlawn pass near Patterson Park) to Johns Hopkins Bayview Med. Ctr. and the Green Line (a proposed north–south line that would have extended from the Johns Hopkins Hospital into northeast Baltimore, possibly as an extension of the Metro Subway). As of summer 2011, the Red Line had received federal permission to enter preliminary engineering. Both lines were cancelled by Gov. Larry Hogan in June 2015.

The Corridor Cities Transitway, a proposed 15-mile (24 km) bus rapid transit line between Gaithersburg and Clarksburg, was allocated some initial planning and design funds in 2013. In 2016 MDOT removed the project from its priority list, and from the Consolidated Transportation Plan in 2019.

From Wikipedia’s article on Maryland Transit Administration, shared under CC BY-SA 4.0.4

Subsidiaries and ownership

Parent company

  • Maryland Department of Transportation

Subsidiaries

  • Maryland Transit Administration Police

Also owns

  • Baltimore Metro SubwayLink railway line

From Wikidata.1

Timeline

  1. Aug 16, 2017New chief executive Kevin B. Quinn becomes CEO1
  2. Apr 30, 1970Founded Founded1

Funding

Where the company's money came from, by calendar year: private offerings filed with the SEC, federal grants, loans, contracts and other assistance from USAspending.gov, and PPP loans from the SBA. Each bar links to the records below.

Money received by year$13.2B 2008–2026
Figures by year
YearFederal grantsFederal contractsTotal
2026$259.6M–$259.6M
2025$618.2M–$618.2M
2024$590.5M–$590.5M
2023$604.0M–$604.0M
2022$311.5M–$311.5M
2021$1.1B–$1.1B
2020$1.3B–$1.3B
2019$1.2B–$1.2B
2018$880.0M–$880.0M
2017$941.8M–$941.8M
2016$851.6M–$851.6M
2015$752.9M–$752.9M
2014$912.0M–$912.0M
2013$831.8M–$831.8M
2012$679.8M$9.3K$679.8M
2011$699.2M$10.5K$699.2M
2010$609.1M–$609.1M
2009$49.2M–$49.2M
2008$210.5K–$210.5K

Federal awards

Obligated amounts from USAspending.gov5, by calendar year, 2008–2026, for its registration. Obligations are what agencies committed, not always what was paid out. Contracts pay for goods and services; grants, loans and direct payments are assistance. Loans are charted at the face value of the loans listed here. An award’s amount below is its lifetime total, and some began before the years charted.

Largest grants

  1. $897.0M from Federal Transit Administration: Federal Transit Capital Investment Grants6 To MARYLAND TRANSIT ADMINISTRATION Award MD-2016-005
  2. Mar 10, 2023$407.0M from Federal Transit Administration: Federal Transit Formula Grants7 To MARYLAND TRANSIT ADMINISTRATION Award MD-2023-003
  3. Jul 29, 2020$394.9M from Federal Transit Administration: Federal Transit Formula Grants8 To MARYLAND TRANSIT ADMINISTRATION Award MD-2020-016
  4. Feb 22, 2010$247.9M from Federal Highway Administration: Highway Planning And Construction9 To MARYLAND TRANSIT ADMINISTRATION Award 24L05EICC1001
  5. Jan 14, 2025$213.7M from Federal Transit Administration: State Of Good Repair Grants Program10 To MARYLAND TRANSIT ADMINISTRATION Award MD-2025-002
  6. Feb 19, 2013$138.0M from Federal Highway Administration: Highway Planning And Construction11 To MARYLAND TRANSIT ADMINISTRATION Award 24M001ICC1001
  7. May 10, 2022$113.7M from Federal Transit Administration: Federal Transit Formula Grants12 To MARYLAND TRANSIT ADMINISTRATION Award MD-2022-002
  8. May 14, 2024$110.0M from Federal Transit Administration: Federal Transit Formula Grants13 To MARYLAND TRANSIT ADMINISTRATION Award MD-2024-010

Largest contracts

  1. Feb 9, 2011$10.5K from Federal Highway Administration: Transit passes for the baltimore resource center14 To MARYLAND TRANSIT ADMINISTRATION Award DTFH6311P00035
  2. Jan 19, 2012$9.3K from Federal Highway Administration: Maryland transit administration transit passes for the baltimore resource center15 To MARYLAND TRANSIT ADMINISTRATION Award DTFH6312P00018