Private company

Metrolink

Logo: Metrolink, Public domain, via Wikimedia Commons3

Regional commuter rail system in Southern California

Metrolink (reporting mark SCAX) is a commuter rail system in Southern California, serving Los Angeles, Orange, Riverside, San Bernardino, San Diego and Ventura counties. The system consists of eight lines and 68 stations operating on 545.6 miles (878.1 km) of track. This includes Arrow, which Metrolink operates under a contract with the San Bernardino County Transportation Authority (SBCTA).2 It is headquartered in Wilshire Grand Center.1 Wikipedia text CC BY-SA 4.0

Last updated Oct 21, 2026.

Overview

Metrolink I5 - Balboa
Photo: Andrewaronoshn, CC BY-SA 4.0, via Wikimedia Commons5

Metrolink (reporting mark SCAX) is a commuter rail system in Southern California, serving Los Angeles, Orange, Riverside, San Bernardino, San Diego and Ventura counties. The system consists of eight lines and 68 stations operating on 545.6 miles (878.1 km) of track. This includes Arrow, which Metrolink operates under a contract with the San Bernardino County Transportation Authority (SBCTA).2

Corporate structure

Metrolink sits at the top of its group. 1 entity, 1 country on record. Switch between the flow chart and the network, and select any entity to see its details.

  • Metrolink Wilshire Grand Center
    • Antelope Valley Line Owned · Greater Los Angeles, United States

Built from subsidiaries, stakes and holdings from Wikidata (CC0); major holders from Schedules 13D and 13G. Each entity in the chart links to its source.

What it owns

What Metrolink reports owning in its annual reports to the SEC: buildings, land and equipment, real estate and locations, investments, intangible assets and inventory, at the end of its latest fiscal year and a year before.

Stakes and holdings (Wikidata)

  • Antelope Valley Line

Things Wikidata records the company as owning, with the share when stated.1

The story

Early organizing

Inter-city rail service around Los Angeles persisted through the formation of Amtrak in 1971, but rail operations suitable for commuters remained elusive throughout the 1980s. On October 18, 1982, CalTrain, LA's first commuter rail service, began on the existing Ventura County Line, but only lasted a few months before termination, on March 1, 1983.

The Orange County Transportation Commission initiated the Amtrak-operated Orange County Commuter in early 1990, running between Los Angeles and San Juan Capistrano, but a more comprehensive approach was deemed necessary. Senate Bill 1402 was signed into law on May 25, 1990, which directed local transportation authorities to establish a regional plan for commuter rail by the year's end.

In October 1990, the member agencies of the SCRRA had announced the purchase of 175 miles (282 km) of track, maintenance yards, and stations and other property from Southern Pacific for $450 million in 1990. The rights to use Los Angeles Union Station were purchased from Union Pacific, the station's owner at the time, for $17 million in the same year (Union Station has since been purchased by Los Angeles Metro). Freight operations would continue on some corridors under coordination with passenger services. The joint powers authority was formally founded in 1991.

Initial service and expansion

Services commenced on October 26, 1992, under contracted operation by Amtrak with the Ventura, Santa Clarita (now the Antelope Valley), and San Bernardino Lines. In 1993, service was expanded to include the Riverside Line and the following year the Orange County Line was conveyed from Amtrak branding to Metrolink. The 1994 Northridge Earthquake saw the closure of Interstate 5 and other regional freeways, bringing widespread attention on Metrolink alternatives. Metrolink experimented with expanded service to Camarillo and Oxnard, and it extended the Antelope Valley line ten years ahead of schedule, rapidly adding six stations in six weeks. The Inland Empire-Orange County Line opened in 1995, and more trains on the Orange County service were funded. The 91 Line (now the 91/Perris Valley Line) opened in 2002.

From July 2004, Metrolink fares were changed from zone based to one based on distance. In 2005, a five-year operational contract was awarded to Connex Railroad/Veolia Transport. That same year, the Orange County Transportation Authority approved a plan to increase frequencies to 76 trains daily on the Orange County and Inland Empire-Orange County Lines by 2009, and funding for increased Metrolink service was included in the renewal of the Measure M sales tax for transportation approved by voters in November 2006. A proposed station in Yorba Linda was canceled after the city rejected it due to local opposition on March 16, 2004.

In July 2008, it was announced that ridership had risen 16% over the previous year. Following the 2008 Chatsworth train collision in which 25 people died and 135 were injured a number of safety measures were taken; in the fall of 2009, inward-facing video cameras were installed in locomotives in order to ensure that staff were complying with regulations, in particular a ban on use of mobile phones. In 2010, the first of 117 energy absorbing passenger carriages (which lessen the toll on passengers in the case of an accident) were received by the operator. Amtrak regained the contract to operate Metrolink beginning in July 2010. Average weekday ridership for the fourth quarter of 2009 was 38,400.

In 2010, to save money in the face of funding cuts, the Metrolink board voted to reduce mid-day service on the Inland Empire–Orange County Line, as well as weekend service on the Orange County, Riverside, and Inland Empire–Orange County lines.

Average weekday ridership was 41,000 during May 2011. A survey found that 90% of users during a typical weekday in 2009 would have previously driven alone or carpooled and that the system replaced an estimated 25,000 vehicle trips. During a weekend closure of Interstate 405 in July 2011, the system recorded its highest-ever weekend ridership of 20,000 boardings which was 50% higher than the same weekend in 2010 and 10% higher than the previous weekend ridership record which occurred during U2 360° Tour in June 2011. Ridership continued to rise in 2012 (up 2%), when average weekday ridership reached 42,265. Although 2013 annual boardings were almost 12.07 million, ridership dropped to 11.74 million by fall 2014 which was contrary to projections. Blaming the decrease on the worst recession since World War II, Metrolink said it found itself caught between cutting service and boosting fares, both of which would likely further decrease ridership.

Read the full text

Metrolink began offering mobile ticketing in early 2016.

The Riverside County Transportation Commission (RCTC) extended the 91 Line (which was renamed the 91/Perris Valley Line) southeast 24 miles (39 km) to Perris, using the existing San Jacinto Branch Line, which it purchased in 1993. Initial plans were for construction/renovation of the line to begin in 2012, but these were delayed by a lawsuit filed by homeowners in the affected area, who challenged the RCTC's environmental report. The lawsuit was settled in late July 2013. Construction on the $248.3 million extension began in October 2013; service was originally planned to begin in December 2015, and then in February 2016. In mid-February 2016, the extension's opening was planned in March of that year. The extension officially opened in June 2016.

When COVID-19 impacted Los Angeles and its communities in March 2020, Metrolink ridership fell by 90%. Metrolink increased cleaning measures, added COVID safety protocols, and reduced service. On March 26, 2020, the agency ran on a temporarily reduced schedule, removing most trains.

On April 4, 2022, Metrolink restored its 24 trains and added 2 new trains to the schedule. Metrolink and Amtrak also entered into a code-sharing agreement on the Ventura County Line, with Pacific Surfliner trains A761, A770, A777, and A784 accepting valid Metrolink tickets between stations served by the Ventura County Line and Ventura station. Metrolink also announced that Metrolink service to Ventura station on the Ventura County Line is planned. Alstom began as the operator for Metrolink on July 1, 2025 for a five year contract period with an extension option for a further three year period. The operating contract also includes the Arrowline service in San Bernardino county.

Arrow expansion

Arrow, formerly the Redlands Passenger Rail Project, opened on October 24, 2022. The 9-mile (14 km) eastward rail extension from San Bernardino to Redlands was planned by the San Bernardino Associated Governments (SANBAG). The association considered whether to extend commuter rail along the corridor or to install either bus rapid transit or light rail lines, but in December 2015, SANBAG officials said they planned to extend Metrolink service only to the San Bernardino Transit Center and use diesel multiple units operated by Omnitrans in lieu of Metrolink locomotive-hauled coaches on the rest of the route. In late 2019, Metrolink assumed the operating rights and carried out construction after Omnitrans was dismissed due to restructuring of that organization. Groundbreaking for Arrow's construction took place on July 19, 2019. Arrow began operation on October 24, 2022.

Rolling stock reliability issues

In October 2024, Metrolink increased its overall service by 23%, focusing on mid-day and week-end service, and optimizing connections between trains from its different lines.

However, in March 2026, Metrolink announced a 20% reduction of its schedule, due to the poor reliability and high maintenance costs of its EMD F125 locomotives. A price increase and additional service cuts are envisioned for October 2026, due to a highly constrained budget.

From Wikipedia’s article on Metrolink (California), shared under CC BY-SA 4.0.4

Products and brands

Service between the cities Ventura and Santa Clarita

The Santa Paula Branch Line was acquired by the Ventura County Transportation Commission in 1995. The railway, a former portion of the Southern Pacific Coast Line, connects the city of Ventura to Santa Clarita paralleling California State Route 126. Sierra Northern Railway operates the services on the line. Plans exist to rehabilitate tracks for Metrolink service. A study from 1991 estimated a cost between $70 million to $90 million to rebuild the line.

Service to Santa Barbara County

The Santa Barbara County Association of Governments (SBCAG) had announced plans for Metrolink service to/from Los Angeles Union Station to begin in Winter, 2026, starting with one daily trip in each direction, however the plans were scrapped in favor of an additional Pacific Surfliner train.

Orange County maintenance facility

As of December 1, 2022, the Orange County Transportation Authority (OCTA) has laid a third track south of the Interstate 5 overpass in Irvine leading into the future site of the Orange County maintenance facility. The facility will serve as an additional site to service Metrolink and Amtrak trains on a parcel of land owned by the Orange County Transportation Authority just north of Irvine station. The project will receive funding from California's SCORE Transit Intercity Rail Capital Program. The project also includes an extension to Ridge Valley, a road north of the parcel where the project will occur.

Pomona-North to Rancho Cucamonga Metrolink Shuttle Service

SBCTA is planning to increase frequency from Pomona North to the Rancho Cucamonga Metrolink station to 15 minute frequency using ZEMU. it is expected to cost 150 million.

Read the full text

Facilities

Metrolink operates several maintenance facilities across its service area. Its Keller Yard Central Maintenance Facility (CMF) is located on the east bank of the Los Angeles River near the intersection of Interstate 5 and Route 110, just south of the location of the former Southern Pacific Taylor Yard. The facility is operated by Metrolink's equipment maintenance contractor: Bombardier Transportation. The Eastern Maintenance Facility (EMF) is located in San Bernardino. Metrolink trains are also serviced at Coaster's Stuart Mesa Facility, which is located between San Clemente Pier and Oceanside at the southwest end of Camp Pendleton. This yard is owned by the North County Transit District. Arrow trains are stored and maintained at the Arrow Maintenance Facility (AMF), located east of the San Bernardino Depot and west of Interstate 215.

Metrolink's operations center is located in Pomona, near Pomona–North station.

From Wikipedia’s article on Metrolink (California), shared under CC BY-SA 4.0.4

Subsidiaries and ownership

Owners

  • Southern California Regional Rail Authority

Also owns

  • Antelope Valley Line

From Wikidata.1

Sources

The numbers on this page point here. Each one links to the record it came from.

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5