Private company

Metrorex

Logo: Metrorex, Public domain, via Wikimedia Commons3

Rapid transit system in Romania

The Bucharest Metro (Romanian: Metroul din București) is an underground rapid transit system that serves Bucharest, the capital of Romania. It first opened for service on 16 November 1979. The network is run by Metrorex.2 Its chief executive is Mariana Miclăuș (since 2022).1 It employed 4,951 people in 2023.1 It is part of Ministry of Transport and Infrastructure of Romania.1 Wikipedia text CC BY-SA 4.0

Last updated Oct 21, 2026.

Overview

1991Founded1
  • Industrypassenger transport1
  • HeadquartersBucharest1
  • Founded inBucharest1
  • Websitewww.metrorex.ro
  • Legal formjoint-stock company1
Bucharestmetro2009
Photo: Bucharestmetro2.svg : * Bucharestmetro.svg : * Buc_metro_map.svg : Original uploader was ArdadN at en.wikipedia derivative work: Xanthar ( talk ) derivative work: derivative work:, CC BY-SA 3.0, via Wikimedia Commons5

The Bucharest Metro (Romanian: Metroul din București) is an underground rapid transit system that serves Bucharest, the capital of Romania. It first opened for service on 16 November 1979. The network is run by Metrorex. One of two parts of the larger Bucharest public transport network, Metrorex had an annual ridership of 142,783,000 passengers during 2023, compared to over a billion annual passengers on Bucharest's STB transit system. In total, the Metrorex system is 80.1 kilometres (49.8 mi) long and has 64 stations.2

The story

The first proposals for a metro system in Bucharest were made in the early part of the 20th century, by the Romanian engineers Dimitrie Leonida and Elie Radu.

The earliest plans for a Bucharest Metro were drafted in the late 1930s, alongside the general plans for urban modernization of the city. The outbreak of World War II, followed by periods of political tensions culminating with the installation of communism, put an end to the plans.

By 1970, the public transport system (ITB) was no longer adequate due to the fast pace of urban development, although the system was the fourth-largest in Europe. A commission was set up, and its conclusion pointed to the necessity of an underground transit system that would become the Bucharest Metro. The plan for the first line was approved on 25 November 1974 as part of the next five-year plan and the construction on the new metro system started on 20 September 1975.

The network was not built in the same style as other Eastern European systems. Firstly, the design of the stations on the initial lines was simple, clean-cut modern, with most stations being relatively austere, without excessive additions such as mosaics, awkward lighting sources or elaborate and ornate decoration. The main function of the stations was speed of transit and practicality. Secondly, the trainsets themselves were all constructed in Romania and did not follow the Eastern European style of construction. Each station usually followed a colour theme (generally white – in Unirii 2 (Union 2), Victoriei 1 (Victory 1), Lujerului; but also light blue – in Obor, Universitate (University), and Gara de Nord (North Train Station); orange – in Tineretului (Of Youth Station); green – in Grozăvești), and an open plan. No station was made to look exactly like any other. Despite this, many stations are rather dark, due to the policies of energy economy in the late 1980s, with later modernisations doing little to fix this problem.

During the 1980s, the metro network expanded very rapidly, at a rate only surpassed by that of the Mexico City Metro. Two more lines were opened during this decade, M3 in 1983, and M2 in 1986.

After the 1989 Romanian Revolution, the socioeconomic and political turmoil of the 1990s largely stagnated the expansion of the metro. Advancement of the construction was difficult; for example, the Gorjului metro station was built in two stages (1994 outbound platform and

1998 inbound platform), and as a consequence the two platforms and associated vestibules were built with different materials and with different colour schemes. The fourth metro line, M4, for which construction was started in September 1989 (shortly before the Revolution), was finally opened in 2000. After Romania joined the European Union in 2007, EU funds helped with the expansion of the metro. The M5 line was opened in 2020, and the M6 line is under construction.

Due to Bucharest being one of the largest cities in the region, the network is larger than those of Prague, Warsaw, Budapest or Sofia. Bucharest Metro is also larger than some other metro systems within the European Union, such as: Rome Metro, Copenhagen Metro, Helsinki Metro, Amsterdam Metro, Brussels Metro, and Lisbon Metro. In addition, there are plans to extend the existing lines and to open two more lines: M7 and M8. Bucharest Metro opened in 1979 (line M1), shortly after Brussels Metro (1976), Vienna U-Bahn (1976) and Amsterdam Metro (1977), and before Helsinki Metro (1982) or Copenhagen Metro (2002).

Read the full text

The first line, M1, opened on 19 November 1979, running from Semănătoarea (now Petrache Poenaru) to Timpuri Noi. It had a length of 8.1 kilometres (5.0 mi) with 6 stations. Following this, more lines and several extensions were opened:

28 December 1981: M1 Timpuri Noi – Republica; 9.2 kilometres (5.7 mi), 6 stations

19 August 1983: M1 (now M3) Branch line Eroilor – Industriilor (now Preciziei); 8.2 kilometres (5.1 mi), 4 stations (Gorjului added later)

22 December 1984: M1 Semănătoarea (Petrache Poenaru) – Crângași; 0.97 kilometres (0.60 mi), 1 station

24 January 1986: M2 Piața Unirii (Union Square) – Depoul IMGB (now Berceni); 9.96 kilometres (6.19 mi), 6 stations (Tineretului and Constantin Brâncoveanu added later)

6 April 1986: M2 Tineretului; 1 infill station

24 October 1987: M2 Piața Unirii (Union Square) – Pipera; 8.72 kilometres (5.42 mi), 5 stations (Piața Romană = Roman Square, added later)

24 December 1987: M1 Crângași – Gara de Nord 1 (North Train Station 1); 2.83 kilometres (1.76 mi), 1 station (Basarab added later)

28 November 1988: M2 Piața Romană (Roman Square); 1 infill station

5 December 1988: M2 Constantin Brâncoveanu; 1 infill station

17 August 1989: M3 (now M1) Gara de Nord 1 (North Train Station 1) – Dristor 2; 7.8 kilometres (4.8 mi), 6 stations

May 1991: M1 Republica – Pantelimon; 1.43 kilometres (0.89 mi), 1 station (single track, operational on a special schedule)

26 August 1992: M1 Basarab; 1 infill station

31 August 1994: M3 Gorjului; 1 infill station (westbound platform only; eastbound platform opened in 1998)

1 March 2000: M4 Gara de Nord 2 (North Train Station 2) – 1 Mai (First of May); 3.6 kilometres (2.2 mi), 4 stations

20 November 2008: M3 branch Nicolae (Nicolas) Grigorescu 2 – Linia de Centură (now Anghel Saligny), 4.75 kilometres (2.95 mi), 4 stations

1 July 2011: M4 1 Mai – Parc Bazilescu, 2.62 kilometres (1.63 mi), 2 stations

31 March 2017: M4 Parc Bazilescu – Străulești, 1.89 kilometres (1.17 mi), 2 stations

15 September 2020: M5 Râul Doamnei / Valea Ialomiței – Eroilor 2 6.87 kilometres (4.27 mi), 10 stations

15 November 2023: M2 Berceni – Tudor Arghezi, 1,6 kilometers (1 mi.), 1 station

Expansions in the near future (estimative):

2027: M6 1 Mai (First of May) - Tokyo, 6.6 kilometres (4.1 mi), 6 stations

2028: M6 Tokyo - Otopeni Airport, 7.6 kilometres (4.7 mi), 6 stations

2030: M5 Eroilor 2 - Piața Iancului (Iancu's Square) 2, 5,4 kilometers (2 mi.), 6 stations

Lines M1 and M3 have been sharing the section between Eroilor and Nicolae Grigorescu.

Lines M5 have been sharing the section between Romancerilor.

Lines M4 and M6 have been sharing the section between Gara de Nord 2 and 1 Mai.

The newest metro station, Tudor Arghezi (M2), was opened on 15 November 2023. Between that date and 8 May 2024, all services to Tudor Arghezi ran in a shuttle service from Berceni, because the signalling and automatisation systems were not yet finished.

Large stations which connect with other lines, such as Piața Victoriei, have two terminals, and each terminal goes by a different name (Victoriei 1 and Victoriei 2). On the official network map, they are shown as two stations with a connection in between, even though, in fact – and for trip planners – they are a single station with platforms at different levels. There is one exception: Gara de Nord 1 and Gara de Nord 2 are separate stations (although linked through a subterranean passage, the traveller is required to exit the station proper and pay for a new fare at the other station, thus leaving the system), passengers being required to change trains at Basarab.

Generally, the underground stations feature large interiors. The largest one, Piata Unirii, is cathedral-like, with vast interior spaces, hosting retail outlets and fast-food restaurants and has an intricate network of underground corridors and passageways.

From Wikipedia’s article on Metrorex, shared under CC BY-SA 4.0.4

Leadership

Who has led Metrorex, and when. Pick a name to see everywhere that person has worked.

1995200020052010201520202025

Products and brands

Infrastructure and network

As of 2023, the entire network runs underground, except for a stretch between Dimitrie Leonida and Tudor Arghezi stations on the southern end of the M2 line. All metro stations are underground, except two (Berceni and Tudor Arghezi, which are the former terminus and current terminus, respectively, of line M2). The network is served by six depots, two being located above ground (IMGB and Industriilor) and four underground (Ciurel, Străulești, Pantelimon and Valea Ialomiței) and smaller additional works at Gara de Nord 1, Eroilor 1, Republica, Parc Drumul Taberei, Favorit, Anghel Saligny, Crângași, Piața Victoriei 2 and Dristor 2 stations.

There are two connections between the Metro network and the Romanian Railways network, one at Berceni (connecting to the Bucharest Belt Ring), the other at Ciurel (connecting via an underground passage to the Cotroceni-Militari industrial railway). However, the latter connection is currently unused and mothballed. The metro network and the national rail network have almost similar track gauge (using the 1,432 mm / 4 ft 8+3⁄8 in vs 1,435 mm / 4 ft 8+1⁄2 in) and loading gauge but not the same electrification system (the metro uses 750 V DC third rail whereas the Romanian Railways use 25 kV 50 Hz AC overhead lines) making it possible for new metro cars to be transported cross country as unpowered railway cars. This distinction is also seen in the pre-2007 separation between the MTR and the former KCR network in Hong Kong (see Track gauge in Hong Kong).

Lines

There are five metro lines in operation and another one in the construction phase:

M1 Line: between Dristor and Pantelimon – the first line to open in 1979, last extension in 1990; it is circular with a North-Eastern spur. Part of its tracks are shared with M3 (7 stations).

Read the full text

M2 Line: between Pipera and Tudor Arghezi. opened in 1986, last extension opened in November 2023; it runs in a north–south direction, crossing the center.

M3 Line: between Preciziei and Anghel Saligny opened in 1983, last extension in 2008; it runs in an east–west direction, south of the center. Shares part of its tracks with M1 (7 stations).

M4 Line: between Gara de Nord and Străulești opened in 2000, last extension was opened in 2017. Part of its tracks will be shared with M6 (4 stations).

M5 Line: between Râul Doamnei / Valea Ialomiței and Eroilor opened in 2020; it runs through the Drumul Taberei neighborhood.

M6 Line: between Gara de Nord and Henri Coandă Airport. This line is bound to be opened partially from 2026. Part of its tracks will be shared with M4 (Gara de Nord - 1 Mai).

M7 Line: between Piața Unirii and Bragadiru, planned to have 15 stations.

Signalling system

There are multiple signalling systems used. Line 2, the first one that has been modernized, uses Bombardier's CITYFLO 350 automatic train control system. It ensures the protection (ATP) and operation (ATO) of the new Bombardier Movia trains.

The system uses an IPU (Interlocking processing unit), TI21-M track circuits and EbiScreen workstations. Signals have been kept only in areas where points are present, meaning that the route has been assigned and the driver can use cab signalling.

Trains are usually operated automatically, with the driver only opening and closing the doors and supervising the operation.

Other features include auto turnback and a balise system, called PSM (precision stop marker). This ensures that the train can stop at the platform automatically.

On line 3, the ATC system has been merged with the Indusi system. Signals are present in point areas and platform ends. Along with the three red-yellow-green lights, the white ATP light has been added. Optical routes can be assigned, meaning that a train gets a green light (permission to pass the signal) only after the next signal has been passed by the train ahead, or a yellow light, meaning that the signal can be passed at low speed. Automatic block signals have been removed.

Line 4 uses Siemens's TBS 100 FB ATC system.

Line 5 uses Alstom's Urbalis 400 Communications-based train control system.

Hours of operation

Trains run from 5 AM to 11 PM every day. The last trains on M1, M2 and M3 wait for the transfer of the passengers between lines to complete, before leaving Piața Unirii station.

Headway

At rush hour, trains run at 4–6-minute intervals on lines 1 and 3, at 1-3 minute intervals on line 2, and at 7–8-minute on line 4; during the rest of the day, trains run at 8-minute intervals on lines 1 and 3, at 7-9 minute intervals on line 2 and at 10-minute intervals on line 4.

Fares and tickets

Public transport in Bucharest is heavily subsidized, and the subsidies will increase, as the City Council wants to reduce traffic jams, pollution and parking problems and promote public transport. Like the STB, the metro can get crowded during morning and evening rush hours. The network uses magnetic stripe cards, that are not valid for use on trams, buses or trolleybuses. Payment by contactless credit cards is available directly at the turnstiles. One tap will take 10 RON, the equivalent of one trip. For multiple validations with the same card, tap the plus button. Starting from 29 July 2021 Metrorex began replacing the magnetic stripe cards with contactless ones for weekly and monthly passes. As of November 2021 most of the cards with have been replaced with contactless ones.

Tickets

Tickets can be bought from any metro station, from both kiosks and vending machines.

Prices:

Metrorex only tickets:

1-trip card – 5 RON

2-trip card – 10 RON(€2.00)

24 hour card – 12 RON (€2.40)

72 hour card – 35 RON

10-trip card – 40 RON

Weekly pass (full price) – 45 RON

Monthly pass (full price) – 100 RON

Six months pass – 500 RON

Yearly pass – 900 RON

Student monthly pass (available for students in Romanian Schools, High-Schools and Universities) – 10 RON

Blood donors monthly pass – 50 RON

Integrated Metro and STB Passes:

1 trip card valid for 120 minutes – 5 RON

2 trip card valid for 120 minutes – 10 RON

10 trip card valid for 120 minutes – 45 RON

24 hour card – 14 RON

72 hour card – 35 RON

7 days card – 35 RON

Weekly pass – 50 RON

Monthly pass – 140 RON

Six month pass – 700 RON

Yearly pass – 1200 RON

Integrated Metro, STB and train on the section between North Station and Bucharest Airport:

24 hour card - 20 RON

72 hour card - 40 RON

Monthly pass - 210 RON

Six month pass - 1100 RON

Yearly pass - 2000 RON

Standard trip cards are sold as anonymous magnetic strip cards, whereas the passes are sold as either MIFARE Ultralight or MIFARE Classic 1000 cards. Passengers can also opt to pay for the trip directly at the gates using credit cards or with Apple Pay/Google Pay. This payment system was implemented in 2019 with VISA, BCR and S&T Romania.

Future service

Under construction

M6 Line: between Gara de Nord and Henri Coandă International Airport. The contract for the first part of the line, known as M6.1 between 1 Mai and Tokyo has been signed in 2022 with the Turkish company Alsim Alarko. They are tasked with designing and building the structural support of the stations and tunnels. The designing and construction contract for the second half to the Henri Coandă International Airport was signed in May 2023 with the Gülermak – Somet association.

Planned

M2 Line: a further northbound extension of 1.6 km (0.99 mi) and two more stations from Pipera;

M4 Line extension: between Gara de Nord, through Soseaua Giurgiului and ending at Gara Progresul at Bucharest's southern limit. The tender for the designing and building of this extension was launched on 26 April 2024.

M5 Line: a further extension of 9.2 km (5.7 mi) to Pantelimon is approved;. The central part of M5, known as M5.2, is currently designed by Metrans Engineering and 3TI Progetti SpA.

M7 Line; it is supposed to run 25 kilometres (16 mi) from Bragadiru to Voluntari and to have 29 stations. The first planned section, between Piața Unirii and Bragadiru, will be 13 kilometres (8.1 mi) long and will include 15 stations. The project is a partnership between Sector 5, Sector2, the Romanian Ministry of Transport, Metrorex and Ilfov County.

These projects are co-financed by the EU, with the exception of M6.2 which is co-financed by a loan from JICA, and M7 (TBD).

Other proposals

Metrorex is also planning the following new lines, routes and stations:

M2 Line: a further southbound extension of 3 km (1.9 mi) and three more stations from Tudor Arghezi

Line M8, the south half ring. Its route has not been fully planned yet, but it will run through Piața Sudului and end at Crângași and Dristor stations.

An extension of the Line M3 is also planned for 2030.

Two more stations are planned and may be constructed on existing lines, both on M1. However, given the complexity of work required, and the limited benefits these stations would have it is unlikely that construction will begin in the near future:

Dorobanți between Stefan cel Mare and Piața Victoriei;

Giulești between Crângași and Basarab.

From Wikipedia’s article on Metrorex, shared under CC BY-SA 4.0.4

Subsidiaries and ownership

Parent company

  • Ministry of Transport and Infrastructure of Romania

Owners

  • Ministry of Transport and Infrastructure of Romania

From Wikidata.1

Employees over time

  • 20234,9511

Timeline

  1. Jan 20, 2022New chief executive Mariana Miclăuș becomes CEO1
  2. 1991Founded Founded in Bucharest1