The story
The first links to a railway to Milford Haven came through the completion of the South Wales Railway in 1856. Isambard Kingdom Brunel had a vision of connecting London to New York City via a railway through Wales and then to a commuter port. The initial plan was to terminate the line at Fishguard and to create a ferry service to Ireland. The failure to complete Irish rail links meant that the terminus was modified to a location on the Milford Haven waterway. 1854 saw track reach Haverfordwest, at which point a decision had to be made as to the terminus. New Milford at Neyland was selected, in spite of opposition from Greville, and was completed in April 1856. As a result, Greville determined to finance a project himself which would see the railway come to Milford Haven under what was initially named the Milford Junction Railway, but ended up being authorised as the Milford Railway, a four-mile spur from Johnston authorised by the Milford Railway Act 1856 (19 & 20 Vict. c. xiv). Construction began in August 1856 and lasted five years, finally completed in 1863, when the line was connected to the South Wales Railway at Johnston, and a station at Milford was opened. The line was, and remains, single track, but sufficient room was allowed in cuttings and under bridges for doubling the track if required. The opportunity to provide a rival to the South Wales Railway by using Milford as a terminus to the Manchester and Milford Railway was also explored at this time.
Excavation work was necessary to provide an embankment upon which the approaching track could be laid skirting the shoreline of Hubberston Pill. Public services commenced 7 September 1863. Further track was laid towards the recently constructed docks complex in 1875. A spur to Newton Noyes, known as the 'Estate Line', was completed in 1882. It connected with a pier, which was reached via a lifting bridge at Castle Pill; the junction with the Milford line opposite the station. This development highlighted Milford station's less than favorable location, although equidistant between the two major populations of Milford and Hakin, it was at a distance from the quayside and with no discernible pedestrian access. To rectify the issue, the short-lived Hakin Dock Station was constructed in 1898.
The original station was modest, with four sidings and a single platform, plus additional run around facilities sandwiched between the hillside and Hubberston Pill. Initial services comprised a local service running back and forth between Milford and Johnston, where passengers could connect with Great Western services from New Milford. By 1871, services had grown to seven daily in each direction, many connecting with passenger services from New Milford at Johnston. The trains using the line were operated by Great Western Railway who had part funded the original railway. It initially rented use of the line, although in 1896 absorbed the Milford Railway Company. In the 1930s many improvements were made, including narrowing the course of the Pill, extra side loops and goods yards. By 1923 the Milford Station Master was re-graded as a special class post, supported by twelve booking clerks and up to ten porters.
Up until 1947, three daily 'vacuum fish' express services transported fish from the Haven to various destinations in the UK, including London Paddington, Yeovil and the north of England. Fish vans were often attached to passenger trains. Goods traffic remained dominant over passenger traffic until the commercial decline of the docks in the late twentieth century. Into the twentieth century, direct services to London Paddington were in operation, and a sleeper service remained in place until the 1960s. The sidings were reduced substantially in 1968, although goods traffic continued until the 1980s. InterCity 125 services from London Paddington to Milford ran until the early 1990s, terminating in 1994. Sealink operated a service to Dún Laoghaire briefly between 1978 and 1979 from Milford. A scheme to expand the freight capability at Milford Haven is under development, based on a new import facility for biomass and wood pellets for the energy market in England and Wales. In September 2019, MP for Preseli Pembrokeshire Stephen Crabb called on politicians and Network Rail to upgrade Milford station, citing a lack of suitable facilities.
From Wikipedia’s article on Milford Railway, shared under CC BY-SA 4.0.3