The story
The company was established on 2 June 2006 as Guangdong Mingyang Wind Power Technology Company Limited and started wind turbine production in 2007, with a prototype of 1.5 MW designed by Aerodyn.
In 2010, Ming Yang started production of SCDs (Super Compact Drives), a two blade turbine by Aerodyn of 2.75 MW and 3.0 MW. In 2013, the new offshore SCD 6.5 MW wind turbine was presented. The first was connected to the grid in 2015.
In 2011, Ming Yang ranked among the top 4 wind turbine suppliers in China and top 10 worldwide.
In 2013, Mingyang won a bid for 87 MW (29 * 3 MW) two-bladed offshore wind turbines near Zhuhai.
In 2022, MingYang received orders for 1 GW of three-bladed 11 MW hybrid-drive wind turbines for Chinese offshore by 2023. In March 2024, the UK government banned Ming Yang throughout the country, citing national security concerns.