The story
1963–1972: Early history
National Refinery Limited was incorporated on 19 August 1963 as a public limited company by a consortium of Pakistani industrialists led by Amin Group. In September 1963, NRL signed an agreement with the American International Oil Company for the supply of Iranian crude oil from the Darius offshore field in the Persian Gulf, in exchange for technical assistance and arrangement of a US$10 million loan through the Bank of America.
In 1966, National Refinery commissioned its first lube refinery, designed and constructed by SNAM Progetti of Italy, at a cost of Rs 104 million, with a designed capacity of approximately 3.97 million barrels per annum of crude processing and 533,400 barrels per annum of lube base oils. In August 1966, the refinery was officially inaugurated by then President Ayub Khan.
1972–2005: Nationalisation and capacity expansion
In 1972, National Refinery was nationalized under the Economic Reforms Order (ERO) of 1972 by Zulfikar Ali Bhutto. In 1974, it became part of state-owned holding company, State Petroleum Refining & Petrochemical Corporation (PERAC).
In 1977, National Refinery commissioned its hydroskimming fuel refinery, supplied by Industrial Export Import of Romania, with a designed crude processing capacity of 11.39 million barrels per annum at a cost of Rs 607.5 million. A second lube refinery was commissioned in 1985, also supplied by Industrial Export Import of Romania, with an initial capacity of 700,000 tons per annum of lube base oils. In the same year, National Refinery commissioned its BTX (benzene, toluene, xylene) petrochemical unit with a designed capacity of 180,000 barrels per annum. In 1990, the fuel refinery capacity was expanded to 16.5 million barrels per annum and was later increased to 17.49 million barrels per annum, with the two expansion phases involving a combined investment of Rs 673 million.
In November 1998, the Government of Pakistan transferred the administrative control of NRL to the Ministry of Petroleum & Natural Resources. In June 2003, the Government included National Refinery in its privatization programme, proposing the sale of 51% equity and transfer of management control to a private investor.
2005–present: Privatisation and expansion
In July 2005, Attock Group acquired majority shareholding of the company through its subsidiaries. Following the acquisition, Pakistan Oilfields Limited and Attock Refinery Limited each held 25% of NRL's shares, while the Islamic Development Bank of Saudi Arabia held an additional 15%.
In 2007, National Refinery commissioned a Diesel Hydro Desulphurisation (DHDS) unit to enable production of Euro II-compliant high-speed diesel, at a cost of approximately Rs 26.82 billion. In the same year, it also commissioned an Isomerisation Unit (Naphtha Block) with a processing capacity of 6,793 barrels per stream day of light naphtha for gasoline production, at a cost of Rs 6.54 billion.
In 2017, the Supreme Court of Pakistan upheld a fine imposed by the State Bank of Pakistan on NRL for failure to make timely payments to Saudi Aramco under a 1998 contract, ordering NRL to pay Rs 305 million to the central bank. The State Bank had acted as sovereign guarantor for payments between NRL and the Saudi crude supplier.