Private company

National Transmission Corporation

Logo: National Transmission Corporation, Public domain, via Wikimedia Commons3

Philippine government-owned utility enterprise

The National Transmission Corporation (Filipino: Pambansang Korporasyon sa Transmisyon), also known as TransCo, is a Philippine government-owned and controlled corporation established on June 26, 2001 by the Electric Power Industry Reform Act (Republic Act 9136), a corporate entity wholly owned by the Power Sector Assets and Liabilities Management (PSALM), and former originally a child agency of National Power Corporation (NAPOCOR/NPC).2 Wikipedia text CC BY-SA 4.0

Last updated Oct 21, 2026.

Overview

Jun 26, 2001Founded1
FvfBantayog0172 13
Photo: Judgefloro, Public domain, via Wikimedia Commons5

The National Transmission Corporation (Filipino: Pambansang Korporasyon sa Transmisyon), also known as TransCo, is a Philippine government-owned and controlled corporation established on June 26, 2001 by the Electric Power Industry Reform Act (Republic Act 9136), a corporate entity wholly owned by the Power Sector Assets and Liabilities Management (PSALM), and former originally a child agency of National Power Corporation (NAPOCOR/NPC). The agency owns the country's power grid right-of-way or portions of a power line, and components and their exact lands or locations that were acquired and designated before the turnover of operations, management, maintenance, and eminent domain to the privately-owned National Grid Corporation of the Philippines (NGCP) on January 15, 2009 as such handling cases regarding them. It also served as operator of the grid from March 1, 2003 until January 2009 when it became separate from NAPOCOR/NPC.2

The story

2001–2003: TransCo as a child agency of NAPOCOR

On June 8, 2001, President Gloria Macapagal Arroyo signed RA 9136 (Electric Power Industry Reform Act), which introduced market competition in the energy sector and mandated the creation of TransCo 18 days after the law was approved on June 26, 2001 with Asisclo T. Gonzaga as its first president. TransCo was originally a child agency of National Power Corporation (NAPOCOR) before the transfer of the grid to the former, acting on behalf of the latter where power grid portions with acquisition and designation from June 26, 2001 to March 1, 2003 continue to use NAPOCOR name as owner and operator.

TransCo's System Operations (SO) Group obtained an ISO 9001:2000 Certification where it is the first SO group in the Southeast Asia to obtain the said certification in 2001.

In October 2002, as mandated on Section 21 of EPIRA which will privatize the soon-to-be successor of NAPOCOR in power grid operations, maintenance, and ownership TransCo by March 1, 2003, Gloria Macapagal Arroyo proved a plan to privatize the latter through a 25-year Operation and Management Concession Agreement.

Asisclo T. Gonzaga stepped down as president on January 1, 2003, and he was replaced by Dr. Alan T. Ortiz five days later on January 6, 2003, two months before the turnover of operations, maintenance, management, expansion, construction, and eminent domain of the country's power grid from NAPOCOR to TransCo.

2003–2009: Turnover of Philippine power grid from NAPOCOR to TransCo and latter as operator

TransCo started to operate, maintain, and own the Philippine power grid which turned over from NAPOCOR on March 1, 2003 marking the effectivity of RA 9136 or EPIRA that organized the industry into four sectors: generation, transmission, distribution and supply and separating from the latter, with Dr. Alan T. Ortiz (which appointed two months earlier) also became the first TransCo president to serve after the turnover of operations, management, and ownership of the grid from NAPOCOR to TransCo. Its transmission lines links various power plants, distribution utilities (such as Manila Electric Company), and electric cooperatives. It served as power grid operator from March 2003, until its turnover of operations, maintenance, management, expansion, construction, and eminent domain of the grid to privately owned National Grid Corporation of the Philippines (NGCP) on January 15, 2009, following its separation from NAPOCOR where TransCo became a standalone government agency.

In September 2004, Power Sector Assets and Liabilities Management (PSALM) received but rejected proposals from four groups with different offers for the TransCo contract that eventually led to a decision to conduct a public bidding.

In June 2005, TransCo garnered the fifth highest score in the Corporate Governance Scorecard for GOCCs & GFIs in the field of Corporate Governance from the Institute of Corporate Directors (ICD).

On September 22, 2005, PSALM filed at the Energy Regulatory Commission (ERC) a petition for a regulatory reset of the maximum annual revenue for TransCo and other concessionaires. From 2003 to 2006, three auctions failed mostly as a result of issues regarding regulatory framework and right-of-way.

Read the full text

In January 2006, TransCo wrote history by bagging the Philippine Quality Award Recognition for Commitment to Quality Management.

In August 2006, TransCo's implementation of Spatial Data Infrastructure Project received a Special Achievement in Geographic Information System (GIS) Award, conferred by the Environmental Systems Research Institute, Inc. (ESRI) in California, United States.

On December 12, 2007, 2 consortia bid for a 25-year license to run the Philippine power grid – privatization of the management of TransCo: the consortium of Monte Oro Grid Resources Corp., comprising the State Grid Corporation of China, and Calaca High Power Corp., won in an auction conducted by the Power Sector Assets and Liabilities Management (PSALM) Corp. as it submitted the highest offer of $3.95 billion, for the right to operate TransCo for 25 years, outbidding San Miguel Energy, a unit of San Miguel Corporation (bid of $3.59 billion), Dutch firm TPG Aurora BV and Malaysia's TNB Prai Sdn Bhd. Jose Ibazeta, PSALM president and CEO remarked: “We are very happy about the successful turnout of the bidding for TransCo. PSALM handled the privatization of the government's transmission business with utmost transparency and judiciousness." This initiated the privatization process for the transmission sector.

On February 28, 2008, TransCo's concession agreement with NGCP was executed and became effective.

TransCo bagged the Mother Nature Award where it is given annually to companies that demonstrate effective compliance with environmental regulations and those that design and successfully implement sound Environmental Management System (EMS) and Environmental Management Programs (EMP) beyond mere compliance with existing laws in 2008.

Congress approved bicameral resolution granting franchise to NGCP to manage and operate its transmission facilities nationwide in November 2008.

President Gloria Macapagal Arroyo signed RA 9511 into law granting franchise to NGCP in December of that same year.

On January 15, 2009, TransCo privatized the operations, maintenance, management, expansion, construction, and eminent domain of the transmission system by turning them over to NGCP which marked the start of the 25-year concession period and renewable for another 25 years with a total of 50 years. Ownership of the country's power grid assets, portions, and components acquired and designated before the turnover date, however, remains with the Philippine government through TransCo while those from the said date of January 2009 are placed temporarily under NGCP ownership and will be transferred to TransCo once its franchise expires or is revoked. With these, it created temporary dual ownership over the grid, with TransCo on pre-privatization and NGCP during the concession period.

2009–present: TransCo after the turnover of operations and maintenance to NGCP, privatized power grid operations and maintenance

TransCo assumed its new role as a result of the privatization of operations, maintenance, management, expansion, construction, and eminent domain upon their turnover to NGCP on January 15, 2009, which was to protect the national government's interest by ensuring NGCP's compliance with the terms and conditions of its concession agreement with NGCP, policies of the Department of Energy (DOE) and other relevant laws, handle existing cases, divest the remaining sub-transmission assets, and administer the Feed-in-Tariff Allowance Fund for renewable energy generators. Arthur N. Aguilar continued to serve as TransCo president even after the turnover to NGCP on January 15, 2009, until he was replaced by Moslemen T. Macarambon, Sr. six months later on July 16, 2009, as a result of taking a new oath of office of the new table of TransCo organization.

The Department of Budget and Management approved the new structure of TransCo on April 20, 2009 consequent to the privatization of its transmission business three months earlier on January 15, 2009.

The new table of organization employees took a new oath of office on July 16, 2009, which results in the formation of a new TransCo.

In November 2012, ERC named TransCo as fit-allowance fund administrator and was given an added role in renewable energy sector.

On March 24, 2017, TransCo receives its ISO certification for Quality Management System from TÜV Rheinland.

On June 8, 2018, the Department of Information and Communications Technology (DICT), NGCP, and TransCo signed an agreement on Friday for a national broadband plan that will help accelerate internet connectivity nationwide. Under the agreement, the DICT will utilize TransCo's reserved optical fiber to distribute connectivity from Luzon to Mindanao using the submarine cables that will be laid down by Facebook from the United States to Asia. The agreement plans to expand the internet connectivity in public places for free by building an additional 200,000 access points nationwide by 2022, DICT Officer-In-Charge Eliseo Rio said.

In 2022, the Presidential Communications Operations Office (PCOO) presented the Certificate of Compliance to TransCo for meeting the necessary requirements pursuant to Section 5.7.b of Memorandum Circular No. 2020–1 on the Harmonization of National Government Performance, Monitoring, Information, and Reporting Systems.

In January 2022, TransCo has succeeded in testing and applying emerging ICT technologies that will make use of existing power line infrastructures to help the Department of Education (DepEd) to implement the Public Education Network program of DepEd that will provide connectivity and high-speed internet to public schools nationwide amid the pandemic. TransCo president Melvin Matibag said the Public Education Network-Communications Infrastructure for Learning (PEN-CIL) project would address the challenges of DepEd in ensuring the continuity of learning amid the pandemic and the expected transition to the New Normal by providing Internet connectivity in all public schools.

In May 2022, TransCo and Palawan Electric Cooperative (PALECO) signed a memorandum of agreement (MOA) mandating the corporation to perform all functions of Small Grid System Operator to address the lingering power issues in Palawan. Said MOA signing is in accordance with the Department of Energy (DOE) Department Circular No. 2021-11-0039 “Mandating the National Transmission Corporation as Small Grid System Operator in Specific Areas."

On December 12, 2025, TransCo applied the Green Energy Auction (GEA)-All with approval of Energy Regulatory Commission (ERC) which will be added on power charges starting from January 2026.

On June 19, 2026, the Energy Regulatory Commission (ERC) stripped NGCP of its exclusive monopoly, allowing Transco and qualified power generation companies to build electric grids while bypassing the grid operated by NGCP.

From Wikipedia’s article on National Transmission Corporation, shared under CC BY-SA 4.0.4

Timeline

  1. Jun 26, 2001Founded Founded1