The story
Founded by Franklin Delano Roosevelt in 1931.1
Then-Governor Franklin D. Roosevelt signed the Power Authority Act into law on April 27, 1931 that established the Power Authority of the State of New York (PASNY); the name was later changed to New York Power Authority (NYPA). Leland Olds headed the authority from 1931 to 1939.
St. Lawrence-Franklin D. Roosevelt Power Project
The International Joint Commission granted its approval for a cross-border construction project in 1952. In 1953, the Federal Power Commission issued a license for NYPA to develop the U.S. portion of a power dam crossing the Canada–US border. On May 13, 1954, President Dwight D. Eisenhower signed legislation that cleared the way for construction of both a hydroelectric facility and the St. Lawrence Seaway.
First power was achieved in July 1958, and on June 27, 1959, Queen Elizabeth II and Vice President Richard M. Nixon formally dedicated the St. Lawrence Project as a symbol of international cooperation. In 1981, NYPA’s half of the cross-border power dam was renamed the St. Lawrence-Franklin D. Roosevelt Power Project in honor of the man who founded the Power Authority half a century earlier.
Niagara Power Project
In 1956, a rockslide destroyed most of the Niagara Mohawk Power Corporation's Schoellkopf hydropower plant, resulting in a power shortage that endangered thousands of local manufacturing jobs. In response to the emergency, Congress passed the Niagara Redevelopment Act in 1957. After obtaining a license from the Federal Power Commission, Robert Moses commenced work on NYPA’s second hydroelectric generating station in early 1958. When it was completed, three years later, the Niagara Power Project was the largest facility of its kind in the Western world. In a recorded message broadcast February 10, 1961, to mark first power, President John F. Kennedy called the Niagara project “an outstanding engineering achievement” and an “example to the world of North American efficiency and determination.”
Blenheim-Gilboa Pumped Storage Power Project Legislation signed by Governor Nelson A. Rockefeller in 1968 allowed NYPA to expand its generation assets and build nuclear and pumped storage power projects. This led to construction of the Blenheim-Gilboa Pumped Storage Power Project, which produced electricity for the first time in July 1973, and the James A. FitzPatrick Nuclear Power Plant (named after a NYPA chairman), in Scriba, Oswego County, where power was first generated in February 1975.
Expanded Authority
The NYPA was newly authorized in the 2023-2024 state budget to develop, own, and operate renewable energy facilities which help meet the state's clean energy goals. A 20MW solar installation in Fort Edward and a 1.5MW solar facility in Albany were the first facilities announced under this expanded authority and are currently under development.
From Wikipedia’s article on New York Power Authority, shared under CC BY-SA 4.0.5