Private company

OLD DOMINION ELECTRIC COOPERATIVE

American electric services company based in Glen Allen1

In its 2026 annual report the company says: “We are a member of a regional transmission organization, PJM, and we participate in its energy, capacity, and transmission services markets to serve our member distribution cooperatives.”4

Last updated Oct 21, 2026.

Overview

$1.3BRevenue, fiscal 20252
$48.7MNet income, fiscal 20252
  • IndustryElectric Services1
  • HeadquartersGlen Allen, Virginia1
  • Incorporated inVA3
  • Business addressInnsbrook Corporate Cntr, 4201 Dominion Blvd, Glen Allen, Va 230603
  • Filer categoryNon-accelerated filer3

Old Dominion Electric Cooperative was incorporated under the laws of the Commonwealth of Virginia in 1948 as a not-for-profit wholesale power supply cooperative. We are organized for the purpose of supplying the power our member distribution cooperatives require to serve their customers on a cost-effective basis. We serve their power requirements pursuant to long-term, all-requirements wholesale power contracts, with limited exceptions. Through our member distribution cooperatives, we served approximately 650,000 retail electric customers (meters), representing a total population of approximately 1.5 million people in 2025.4 From its latest annual report

Financials

From the company’s reports to the SEC. Every number links to the filing it came from.

Key numbers, fiscal 2025

7.4%Operating margin2
3.7%Net margin2
19.9%Revenue growth, 20252
-$13.6MFree cash flow2

Where the money goes

Where each dollar of revenue went, fiscal 2025

  • Other costs96¢$1.3B
  • Income tax0¢$57.0K
  • Profit4¢$48.7M

Out of $1.3B in revenue.2

Where each dollar of operating cash went, fiscal 2025

  • Capital spending100¢$98.9M

Out of $85.3M of cash from operations. Spending exceeded cash from operations; the rest came from savings or borrowing.2

Financial statements

Revenue567892$1.3B in 2025+43% since 2018
0$500.0M$1.0B$1.5B2018: $932.6M$932.6M20182019: $932.7M$932.7M2019+0%2020: $807.7M$807.7M2020−13%2021: $780.6M$780.6M2021−3%2022: $1.0B$1.0B2022+29%2023: $1.1B$1.1B2023+8%2024: $1.1B$1.1B2024+3%2025: $1.3B$1.3B2025+20%
Operating income567892$99.3M in 2025+57% since 2018
0$25.0M$50.0M$75.0M$100.0M2018: $63.4M$63.4M20182019: $72.8M$72.8M2019+15%2020: $59.5M$59.5M2020−18%2021: $55.1M$55.1M2021−7%2022: $60.5M$60.5M2022+10%2023: $65.1M$65.1M2023+8%2024: $44.9M$44.9M2024−31%2025: $99.3M$99.3M2025+121%
Net income567892$48.7M in 2025+267% since 2018
0$20.0M$40.0M$60.0M2018: $13.3M$13.3M20182019: $17.0M$17.0M2019+28%2020: $12.2M$12.2M2020−28%2021: $20.0M$20.0M2021+65%2022: $11.3M$11.3M2022−44%2023: $12.6M$12.6M2023+11%2024: $11.8M$11.8M2024−6%2025: $48.7M$48.7M2025+314%
Fiscal year20182019202020212022202320242025
Revenue$932.6M5$932.7M6$807.7M7$780.6M8$1.0B9$1.1B2$1.1B2$1.3B2
Operating income$63.4M5$72.8M6$59.5M7$55.1M8$60.5M9$65.1M2$44.9M2$99.3M2
Income tax$11.0K5$25.0K6$2.0K7-$8.0K8$151.0K9$110.0K2$65.0K2$57.0K2
Net income$13.3M5$17.0M6$12.2M7$20.0M8$11.3M9$12.6M2$11.8M2$48.7M2

Compare OLD DOMINION ELECTRIC COOPERATIVE with another company

What it owns

What OLD DOMINION ELECTRIC COOPERATIVE reports owning in its annual reports to the SEC: buildings, land and equipment, real estate and locations, investments, intangible assets and inventory, at the end of its latest fiscal year and a year before.

Investments

ItemLatestA year beforeChange
Cash and cash equivalents$168.4M2 Dec 31, 2025$40.7M2 Dec 31, 2024+314.0%
Long-term investments$342.8M2 Dec 31, 2025$294.9M2 Dec 31, 2024+16.3%

Properties, in its own words

Our principal properties consist of our interest in five electric generating facilities, additional distributed generation facilities across our member distribution cooperatives’ service territories, and a limited amount of

transmission facilities. Substantially all of our physical properties are subject to the lien of our Indenture. Our generating facilities consist of the following:

The rest of Item 2

Generating Facility · OwnershipInterest · Location · PrimaryFuel · CommercialOperation Date · Net CapacityEntitlement (1)

Wildcat Point · 100 · Cecil County, Maryland · Natural Gas · 04/2018 · 980 MW

North Anna · 11.6 · Louisa County, Virginia · Nuclear · Unit 1 – 06/1978 (2)Unit 2 – 12/1980 (2) · 110 MW110 MW

220 MW

Clover · 50 · Halifax County, Virginia · Coal · Unit 1 – 10/1995Unit 2 – 03/1996 · 220 MW218 MW

438 MW

Louisa · 100 · Louisa County, Virginia · Natural Gas (3) · 06/2003 · 504 MW

Marsh Run · 100 · Fauquier County, Virginia · Natural Gas (3) · 09/2004 · 504 MW

Distributed Generation · 100 · Multiple · Diesel · 07/200205/2016 · 20 MW6 MW

26 MW

Total · 2,672 MW

Net capacity entitlement represents (a) the projected maximum dependable capacity in summer conditions for Wildcat Point, (b) an approximation of our entitlement to the maximum dependable capacity in summer conditions for North Anna and Clover, and (c) a nominal average of summer and winter capacities for Louisa and Marsh Run.

We purchased our 11.6% undivided ownership interest in North Anna in December 1983.

The units at this facility also operate on No. 2 distillate fuel oil as an alternate fuel source.

Wildcat Point

Wildcat Point is a combined-cycle generation facility that consists of two combustion turbines, two heat recovery steam generators, and one steam turbine generator. We are responsible for the operation and maintenance of Wildcat Point and we supply all services, goods, and materials required to operate and maintain the facility, including arranging for the transportation and supply of the natural gas required by the facility.

North Anna

Virginia Power is responsible for operating and procuring nuclear fuel for North Anna. See “Power Supply Resources—Fuel Supply—Nuclear” in Item 1. We are entitled to 11.6% of the power generated by North Anna. We are responsible for and must fund 11.6% of all post-acquisition date additions and operating costs associated with North Anna, as well as a pro-rata portion of Virginia Power’s administrative and general expenses directly attributable to North Anna. In addition, we separately fund our pro-rata portion of the decommissioning costs of North Anna. ODEC and Virginia Power also bear pro-rata any liability arising from ownership of North Anna, except for liabilities resulting from the gross negligence of the other.

In 2024, the NRC renewed the operating licenses for an additional 20 years for both units at North Anna. The operating licenses now extend through April 1, 2058, and August 21, 2060, for North Anna Unit 1 and Unit 2, respectively.

Clover

Virginia Power, the co-owner of Clover, is responsible for operating, and procuring and arranging for the transportation of the fuel required to operate Clover. See “Power Supply Resources—Fuel Supply—Coal” in Item 1. ODEC and Virginia Power are each entitled to half of the power generated by Clover. We are

responsible for and must fund half of all additions and operating costs associated with Clover, as well as half of Virginia Power’s administrative and general expenses directly attributable to Clover. When Clover was constructed in 1995, it was intended to operate as a baseload generating facility. As changes in the industry have occurred, Clover now serves us principally as a capacity resource with on-site storage of fuel. In this role, Clover is dispatched by PJM when it is economical or required for reliability.

The Virginia Clean Economy Act requires that substantially all investor-owned utility generating facilities that emit CO2 as a by-product of combustion close by December 31, 2045, which would include Clover. However, if the reliability or security of providing electric service to customers is threatened, a petition may be made by Virginia Power to the VSCC requesting relief from the closure requirement.

In 2024, the EPA published a final rule containing performance standards for both new and existing generating units for reducing CO2 emissions. The rule, which is subject to legal challenges, includes emissions guidelines that set limits for new gas-fired combustion turbines, existing coal, oil, and gas-fired steam generating units, and certain existing gas-fired combustion turbines. On June 17, 2025, the EPA published a proposed rule to repeal a rule that became effective on July 8, 2024. The EPA’s proposed rule contained two alternative proposals. The EPA requested comments on the 2025 proposed rule by August 7, 2025. For further discussion, see “Regulation—Environmental—Clean Air Act (“CAA”)—CAA Performance Standards for GHGs for New and Existing Electric Generating Facilities” in Item 1.

Combustion Turbine Facilities

Louisa

Louisa consists of five combustion turbines. We are responsible for the operation and maintenance of Louisa and we supply all services, goods, and materials required to operate and maintain the facility, including arranging for the transportation and supply of the natural gas and No. 2 distillate fuel oil required by the facility.

Marsh Run

Marsh Run consists of three combustion turbines. We are responsible for the operation and maintenance of Marsh Run and we supply all services, goods, and materials required to operate and maintain the facility, including arranging for the transportation and supply of the natural gas and No. 2 distillate fuel oil required by the facility.

Distributed Generation Facilities

Item 2 of the 10-K filed Mar 17, 2026.4

Timeline

  1. Sep 17, 20268-K Executive or director change17
  2. Sep 3, 20268-K Executive or director change18
  3. Jul 30, 20268-K Executive or director change19
  4. Jun 2, 20268-K Executive or director change20
  5. Dec 19, 20258-K Entered a material agreement; New debt or obligation21
  6. Dec 19, 20258-K Executive or director change22
  7. Dec 10, 20258-K Executive or director change23
  8. Sep 22, 20258-K Executive or director change24
  9. Apr 21, 20258-K Executive or director change25
  10. Apr 11, 20258-K Code of ethics changed26
  11. Feb 28, 20258-K Executive or director change27
  12. Dec 12, 20248-K Executive or director change28

Filings

53 filings to the SEC since October 2021: 5 annual reports, 15 quarterly reports, 33 major events. The latest 20:

  1. Sep 17, 20268-K EDGAR
  2. Sep 3, 20268-K EDGAR
  3. Aug 11, 202610-Q EDGAR
  4. Jul 30, 20268-K EDGAR
  5. Jun 2, 20268-K EDGAR
  6. May 12, 202610-Q EDGAR
  7. Mar 17, 202610-K EDGAR
  8. Dec 19, 20258-K EDGAR
  9. Dec 19, 20258-K EDGAR
  10. Dec 10, 20258-K EDGAR
  11. Nov 12, 202510-Q EDGAR
  12. Sep 22, 20258-K EDGAR
  13. Aug 12, 202510-Q EDGAR
  14. May 13, 202510-Q EDGAR
  15. Apr 21, 20258-K EDGAR
  16. Apr 11, 20258-K EDGAR
  17. Mar 18, 202510-K EDGAR
  18. Feb 28, 20258-K EDGAR
  19. Dec 12, 20248-K EDGAR
  20. Dec 9, 20248-K EDGAR

The 53 filings since October 2021 can be filtered by form type and year here when JavaScript is on.

Every filing from the last five years, summarized. The full record is on SEC EDGAR.

SEC filer profile

How OLD DOMINION ELECTRIC COOPERATIVE is registered with the Securities and Exchange Commission, from its EDGAR record and the cover page of its latest annual report.

  • Name on EDGAROLD DOMINION ELECTRIC COOPERATIVE1
  • CIK0000885568
  • Employer ID (EIN)23-70484054
  • Filer statusNon-accelerated filer not an emerging growth company; not a smaller reporting company; not a shell company4
  • Incorporated inVirginia4
  • Fiscal year endsDecember 311
  • Industry code (SIC)4911 Electric Services1
  • SEC reviewing officeOffice of Energy & Transportation, Division of Corporation Finance1
  • Business addressInnsbrook Corporate Cntr, 4201 Dominion Blvd, Glen Allen, VA 230601
  • Mailing address4201 Dominion Blvd, Glen Allen, VA 230601
  • Phone80474705921
  • Shares outstanding0 as of Jun 30, 202611
  • Public float$0 as of Dec 31, 20252
  • AuditorErnst & Young LLP, Richmond, Virginia PCAOB ID 42; no auditor attestation of internal control over financial reporting4
  • On EDGAR sinceMay 15, 19961
  • Filings275 in all: 8-K (120), 10-Q (92), 10-K (26), 10-Q/A (7), UPLOAD (5), 10-K405 (4), CORRESP (4), 10-K/A (3)1
    All 19 form types

    S-3/A (3), 424B5 (2), 424B1 (1), 424B4 (1), 8-A12G (1), NO ACT (1), NSAR-A (1), S-1 (1), S-1/A (1), S-3 (1), U-7D/A (1)

  • Latest filingsAnnual report (10-K) Mar 17, 2026
    Quarterly report (10-Q) Aug 11, 2026
    Latest 8-K (8-K) Sep 17, 2026

Risk factors and legal proceedings

The risks OLD DOMINION ELECTRIC COOPERATIVE names in Item 1A of its 10-K filed Mar 17, 2026: 18 risks under these headings, as written.4

  • FINANCIAL, MARKET, AND ECONOMIC RISKS
  • Our financial condition is largely dependent upon our member distribution cooperatives.
  • We rely on purchases and delivery of power and fuel from other suppliers that exposes us to market price risk and could increase our operating costs.
  • Substantially large loads considered for development and construction in the service territories of our member distribution cooperatives could impact our financial condition and liquidity.
  • Counterparties under energy purchase and natural gas arrangements may fail to perform their obligations to us resulting in default.
  • The use of hedging instruments could impact our liquidity.
  • Adverse changes in our credit ratings may require us to provide credit support for some of our obligations and could negatively impact our liquidity and our ability to access capital.
  • Poor market performance will affect the asset values in our nuclear decommissioning trust and our defined benefit retirement plans, which may increase our costs.
  • REGULATORY AND LEGISLATIVE RISKS
  • Our generating assets and costs to serve our load may be impacted by regulatory changes and risks in PJM.
  • Environmental legislation or regulation may limit our operations or increase our costs or both.
  • Failure to comply with regulatory reliability standards, and other regulatory requirements could subject us to substantial monetary penalties.
The other 8 risks
  • OPERATIONAL RISKS
  • We may have operational deficiencies or catastrophic events related to our generating or transmission facilities.
  • We are subject to fuel procurement and delivery risks.
  • Construction of new, or expansion of existing, generating and transmission facilities may not result in the anticipated value to our power supply resource portfolio.
  • We are subject to risks associated with owning an interest in a nuclear generating facility.
  • Failure to attract and retain a qualified workforce could have an adverse effect on our operations.
  • If we are unable to protect our information systems against service interruption, misappropriation of data, or breaches of security, our operations could be disrupted and our reputation may be damaged.
  • Technological advancements and other changes impacting power requirements of our member distribution cooperatives’ customers may alter energy and demand requirements for power from us.
  • War, acts and threats of terrorism, sabotage, natural disasters, extreme weather events, pandemics, and other catastrophic events could adversely affect our operations.

Legal proceedings

Other than certain other legal proceedings arising out of the ordinary course of business that management believes will not have a material adverse impact on our results of operations or financial condition, there is no other litigation pending or threatened against us.

The opening of Item 3, Legal Proceedings.4

Sources

The numbers on this page point here. Each one links to the record it came from.

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12
  13. 13
  14. 14
  15. 15
  16. 16
  17. 17
  18. 18
  19. 19
  20. 20
  21. 21
  22. 22
  23. 23
  24. 24
  25. 25
  26. 26
  27. 27
  28. 28