Private company

Pakistan Railways

Pakistani state-owned railway company

Pakistan Railways is the state-owned railway operator in Pakistan. Founded in 1886 as the North Western State Railway and headquartered in Lahore, it owns 7,791 kilometres (4,841 miles) of operational track, stretching from Peshawar to Karachi, offering both freight and passenger services, covering 494 operational stations across Pakistan. In 2014, the Ministry of Railways launched Pakistan Railways Vision 2026, which seeks to increase PR's share in Pakistan's transportation sector from 4% to 20%, using the Rs.2 Wikipedia text CC BY-SA 4.0

Last updated Oct 21, 2026.

Overview

1947Founded1
Pakistan Railways headquarters 1
Photo: CC BY-SA 2.5, via Wikimedia Commons4

Pakistan Railways is the state-owned railway operator in Pakistan. Founded in 1886 as the North Western State Railway and headquartered in Lahore, it owns 7,791 kilometres (4,841 miles) of operational track, stretching from Peshawar to Karachi, offering both freight and passenger services, covering 494 operational stations across Pakistan.2

The story

North-Western State Railway (1886–1905)

In 1855, during the British Raj, several railway companies began laying track and operating in Sindh and Punjab. The country's railway system was originally a patchwork of local rail lines operated by small, private companies, including the Scinde Railway, Punjab Railway, Delhi Railway and Indus Flotilla. In 1870, the four companies combined to form the Scinde, Punjab & Delhi Railway. Several other rail lines were soon built, including the Indus Valley State Railway, Punjab Northern State Railway, Sind–Sagar Railway, Sind–Pishin State Railway, Trans–Baluchistan Railway and Kandahar State Railway. These six companies merged with the Scinde, Punjab & Delhi Railway to form the North Western State Railway in 1886.

North-Western Railway (1905–1961)

The North Western State Railway was renamed as North Western Railway in 1905.

Following the partition of British India and independence of Pakistan in 1947, most of the North Western Railway infrastructure became part of the Pakistani territory. The country adopted 8,122 km (5,047 mi) of the North Western State Railway; 6,880 km (4,280 mi) was 1,676 mm (5 ft 6 in), 506 kilometres (314 mi) was 1,000 mm (3 ft 3+3⁄8 in) metre gauge, and 736 kilometres (457 mi) was 762 mm (2 ft 6 in) narrow gauge.

In 1954, a branch line was extended from the Karachi–Peshawar Railway Line to Mardan and Charsada. Two years later, the Jacobabad–Kashmore metre-gauge line was converted to 5 ft 6 in (1,676 mm) broad gauge.

Pakistan Western Railway (1961–1974)

On 1 February 1961, the North-Western Railway was renamed the Pakistan Western Railway. In East Bengal, the portion of the Assam Bengal Railway in Pakistani territory was renamed the Pakistan Eastern Railway.

The Kot Adu–Kashmore section of the Kotri–Attock Railway Line was built from 1969 to 1973, providing an alternate route from Karachi to northern Pakistan.

Pakistan Railways (1974–present)

In 1974, Pakistan Western Railways was renamed Pakistan Railways. In February 2006, the 126-kilometre (78 mi) Hyderabad–Khokhrapar Branch Line was converted to 5 ft 6 in (1,676 mm). All narrow-gauge tracks in the country were converted to broad gauge or dismantled during the 2000s. On 8 January 2016, the Lodhran–Raiwind Branch Line double-rail project was completed.

From Wikipedia’s article on Pakistan Railways, shared under CC BY-SA 4.0.3

Products and brands

Manufacturing

Pakistan Locomotive Factory Risalpur

The Pakistan Locomotive Factory was established in Risalpur in 1993 at a cost of Rs. 228.4 million (US$820,000). Its function is to manufacture indigenous diesel electric and electric locomotives, thus allowing Pakistan Railways to have less dependency on foreign technology. The factory has capacity to manufacture 25 locomotives per year. Technology for manufacturing of locomotives has been acquired from Hitachi Japan, General Electric, ADtranz Germany and Dalian Locomotives & Rolling Stock Works, China.

Carriage Factory Islamabad

Pakistan Railways Carriage Factory, Islamabad was set up in 1970 under the technical collaboration of LHB, Germany for manufacture of passenger carriages. The capacity of the Factory is 150 passenger coaches per year on single shift basis.

Moghalpura Railway Workshops

The Moghalpura Railway Workshops, on the Lahore–Wagah Branch Line at Moghalpura Junction railway station (MGPR) in Lahore, are one of several rolling-stock repair sites. The workshop complex emerged at its present site in 1904 to manufacture, repair and overhaul passenger coaches and freight wagons for the North Western State Railway. In 1947, it was the only state-of-the-art workshop for Pakistan Railways. After partition, the Moghalpura Railway Workshops continued to host some 14,000 workers specializing in engineering skills.

Concrete Sleeper Factories

The railway owns four concrete sleeper factories in Sukkur, Khanewal, Kohat, and Kotri. The first factory was established in Sukkur in 1967, and the other three factories were opened between 1981. A fifth factory, at Shaheenabad, was closed in 1996 due to financial constraints and the scarcity of water.

Read the full text

Network

Lines

The Pakistan Railways network is divided into main lines and branch lines. The Karachi–Peshawar Line is the main north-south line, and the Rohri–Chaman Line is the main east-west line.

Main lines

Main Line 1 (ML-1) Karachi–Peshawar Line

Main Line 2 (ML-2) Kotri–Attock Line

Main Line 3 (ML-3) Rohri–Chaman Line

Main Line 4 (ML-4) Quetta–Taftan Line

Main Line 5 (ML-5) Taxila–Khunjerab Line

Tracks

The Pakistan Railways network comprises 7,791 route-kilometres (7,479 km of broad gauge and 312 km of metre gauge). There are 1,043 km of double-track sections (in total).

The broad-gauge track axle load limit is 22.86 tonnes, except for the Rohri–Chaman Line (limit 17.78 tonnes) and Quetta–Taftan Line (limit 17.27 tonnes). The maximum speed on most lines is 105 kilometres per hour (65 mph), but upgraded sections of the Karachi–Peshawar Line allow speeds up to 120 kilometres per hour (75 mph). In future, Pakistan Railways aim to upgrade all main lines to 160 kilometres per hour (99 mph).

Electrification

The Lahore–Khanewal line was electrified at 25 kV AC, but electric service had ceased by 2011. The theft of overhead wire was cited as a reason. The future electrification with 25 kV AC requiring minimum overhead wiring height must be 7.45 m (24 ft 5 in) above top of rail and minimum track center spacing must be 5.3 m (17 ft 5 in), and platform height must be no more than 200 mm (7.9 in) above top of rail, to prevent catenary thefts.

Rail links with adjacent countries

Iran – Pakistan Railways is connected to the Islamic Republic of Iran Railways at Zahedan, where a break-of-gauge exists between the 1,676 mm (5 ft 6 in) Quetta–Taftan Line and the 1,435 mm (4 ft 8+1⁄2 in) Kerman–Zahedan line. The link was completed on 18 May 2007.

Afghanistan – Presently there is no rail link to Afghanistan, but Pakistan Railways has proposed to help build an Afghan rail network in three phases. Phase one would stretch from the Chaman to Spin Boldak as an extension of the Rohri–Chaman Line. Phase two would extend the line from Spin Boldak to Kandahar. Phase three would run from Kandahar to Herat and Khushka, Turkmenistan, linking the 1,676 mm (5 ft 6 in) with the Central Asian 1,520 mm (4 ft 11+27⁄32 in). It is unknown where the break-of-gauge station would be. Another proposal would extend the Karachi–Peshawar Line to Kabul via Jalalabad.

Turkmenistan via Afghanistan – Proposed, avoiding the intervening 1,435 mm (4 ft 8+1⁄2 in) gauge

China – There is no present rail link with China. On 28 February 2007, contracts were awarded for feasibility studies on the Taxila–Khunjerab Line, extending it from Havelian via the Khunjerab Pass to the Chinese railhead at Kashgar, a distance of about 750 kilometres (470 mi).

Turkey – The completion of the Pakistan–Iran link has made it possible, in principle, to run trains between Pakistan and Turkey via Iran. A container train trial service was begun by Prime Minister Yusuf Raza Gilani between Islamabad and Istanbul on 14 August 2009. The first train carried 20 containers with a capacity of about 750 t (738 long tons; 827 short tons), and was scheduled to travel 6,500 km (4,000 mi) from Islamabad through Tehran to Istanbul. An Istanbul–Tehran–Islamabad passenger rail service has also been proposed. In 2009, Minister for Railways Ghulam Ahmad Bilour expressed the hope that after the container-train trial a passenger train would be introduced. There are also hopes that the route would link Europe and Central Asia and carry passengers.

India – Two rail links to India exist: the Thar Express from Jodhpur, Rajasthan to Karachi and the Samjhauta Express from Delhi to Lahore. The more rail links (including reopening) being proposed.

Russia – Proposed 1,676 mm (5 ft 6 in) Indian broad-gauge corridors extension via Central Asia.

Service

Passenger service

Passenger traffic is 50 percent of total annual revenue; in 1999–2000, this amounted to Rs. 4.8 billion (US$17 million). Pakistan Railways carried 52.2 million passengers in 2016 and operates 28 mail, express and passenger trains. The railway carries a daily average of 178,000 people, and provides special trains for Eid al-Fitr, Eid al-Adha, Independence Day and Raiwind Ijtema. It set up a website during the early 2000s to provide travelers with up-to-date information about seat availability, departures and arrivals. Online ticket purchase was added to the website in 2016, with reservations confirmed by SMS. Wi-Fi service is included on the Green Line Express.

Freight service

Pakistan Railways was the predominant mode of freight transportation from coastal ports to the interior. At their peak, between 1955 and 1960, PR handled 73 percent of the country's freight traffic (compared to less than four percent in 2015). The Freight Business Unit operates over 200 freight stations, including the Port of Karachi and Bin Qasim Port, and several dry ports in Pakistan's four provinces. With 12,000 employees, the unit generates revenue from the movement of agricultural, industrial and imported products such as petroleum oil and lubricants, wheat, coal, fertilizer, rock phosphate, cement and sugar from the ports to the interior.

On 14 August 2009, Prime Minister Yusuf Raza Gilani launched a freight train between Islamabad and Istanbul via Tehran. The first train carried 20 containers with a capacity of 750 t (738 long tons; 827 short tons), and made the 6,500 km (4,000 mi) trip from Islamabad to Tehran and Istanbul in two weeks. In 2015, freight carried by Pakistan Railways increased significantly to 3.3 million tons.

On 22 February 2020, the first cargo train bound for Afghanistan left the Pakistan International Container Terminal in Karachi, with a load of 35 containers. The goods were transported to the city of Chaman, neighbouring Afghanistan, and passed over the border by road.

Travel Classes

Pakistan Railways has several classes of travel. Depending on the route, some trains have one class. Fares for the classes vary, with unreserved seating the least expensive. The following table lists the classes and codes:

Heritage

In Ghangha Pur, a 2 ft (610 mm) narrow-gauge horse-drawn tramway is operational. It was first opened in 1898, closed in 1998, and re-opened in 2010. and soon abandoned again.

The Khyber train safari is a defunct steam operated train between Peshawar and Attock Khurd. It was first opened in 1925, suspended in 1982, reopened in 1996 as Khyber steam safari, suspended again in 2006 and finally reopened in 2015 with present name and soon abandoned again. A documentary film of the railway featuring its steam locomotives was made by Nick Lera in 1997 with the title Pakistan - Rails to the North West Frontier.

From Wikipedia’s article on Pakistan Railways, shared under CC BY-SA 4.0.3

Subsidiaries and ownership

Owners

  • Government of Pakistan

From Wikidata.1