Private company

Palestine Railways

State-owned railway company, 1920–1948

Palestine Railways (Arabic: سكة حديد فلسطين (“Palestine Railways”); Contemporary Hebrew: מסילות ברזל פלשתינה (א"י) (“Palestine (Land of Israel) Railways”) or רכבות ארץ-ישראל (“Land of Israel Railways”); Present-day Hebrew: הרכבת המנדטורית (“Mandate Railways”)) was a government-owned railway company that ran all public railways in the League of Nations mandate territory of Palestine from 1920 until 1948. Its main line linked El Kantara in Egypt with Haifa. Branches served Jaffa, Jerusalem, Acre and the Jezreel Valley.2 Wikipedia text CC BY-SA 4.0

Last updated Oct 21, 2026.

Overview

1920Founded1
  • HeadquartersHaifa East railway station1
AwmB00283.Samakh
Photo: Campbell, James Pinkerton, Public domain, via Wikimedia Commons4

Palestine Railways (Arabic: سكة حديد فلسطين (“Palestine Railways”); Contemporary Hebrew: מסילות ברזל פלשתינה (א"י) (“Palestine (Land of Israel) Railways”) or רכבות ארץ-ישראל (“Land of Israel Railways”); Present-day Hebrew: הרכבת המנדטורית (“Mandate Railways”)) was a government-owned railway company that ran all public railways in the League of Nations mandate territory of Palestine from 1920 until 1948. Its main line linked El Kantara in Egypt with Haifa. Branches served Jaffa, Jerusalem, Acre and the Jezreel Valley.2

The story

Background and predecessors

Jaffa–Jerusalem railway

The Jaffa–Jerusalem railway, funded by Chemin de Fer Ottoman de Jaffa à Jérusalem et Prolongements, was the first railway to be built in Palestine. Construction started on 31 March 1890 and the line opened on 26 September 1892. It was built to 1,000 mm (3 ft 3+3⁄8 in) with many tight curves and a ruling gradient of 2% (1 in 50). The eastern part of the line, in the Judean hills between Dayr Aban and Jerusalem, is particularly steep and winding. The "J&J"'s first locomotives were a fleet of five 2-6-0 Mogul tender locomotives from Baldwin in the US, delivered in 1890 and 1892. On a number of occasions the Baldwins' six-coupled driving wheels either spread the rails or became derailed on tight curves. As traffic increased the J&J obtained four 0-4-4-0 Mallet articulated locomotives from Borsig in Germany, delivered between 1904 and 1914. The Mallets were intended to deliver greater tractive effort without spreading the rails, but they too suffered a number of derailments.

In 1915, during World War I, the Ottoman Army widened the track gauge between Lydda and Jerusalem to 1,050 mm (3 ft 5+11⁄32 in) to allow through running with the Hejaz Railway and removed the track between Lydda and Jaffa for military use elsewhere.

In 1921, the British Government of Palestine seriously considered electrifying the line. Pinhas Rutenberg, the electricity concessionaire of Palestine, had been backed by High Commissioner Samuel in suggesting that the electrification of the line would not only be profitable but also crucial for the successful electrification of the country as a whole. However the Colonial Office backed off, fearing the heavy costs of this project

Jezreel Valley railway

This was a branch of the Hejaz Railway between Haifa and Daraa in southern Syria where it joined the Hejaz main line. Construction began at Haifa in 1902 and was completed at Daraa in 1905. The Jezreel Valley line, like the Hejaz main line, was built to 1,050 mm (3 ft 5+11⁄32 in). Construction of a branch from Afula on the Jezreel Valley line to Jerusalem had begun in 1908 and reached Nablus by the outbreak of the First World War in 1914.

Ottoman military railways

The Ottoman Empire needed to supply its forces holding the border of Palestine against British and Empire forces in Egypt. The planned railway from Nablus through hilly country to Jerusalem could not be completed in time, so from 1915 the German railway engineer Heinrich August Meißner oversaw the building of a 1,050 mm (3 ft 5+11⁄32 in) line westwards from El Mas'udiya to Tulkarm. From Tulkarm the terrain became much easier and a line was built northwards to Hadera and southwards to Lydda where it joined the J&J and later became known as the Eastern Railway. It used the widened J&J track (see above) as far as Wadi Surar where it branched southwards towards the Ottoman front line. By October 1915 the line was operational as far south as Beersheba. A branch was also built from Et Tine just south of Wadi Surar to Deir Seneid, where it branched again to Beit Hanoun and Huj near Gaza. The Ottomans also extended the railway to Beersheba into Sinai as far as Kusseima. Large sections of this line were deliberately targeted and destroyed by British forces in the May 1917 Raid on the Beersheba to Hafir el Auja railway.

Sinai Military Railway

The Egyptian Expeditionary Force (EEF) of British and British Empire units was formed in March 1916. It began building the standard gauge Sinai Military Railway from El Kantara on the Suez Canal across Sinai, reaching Romani by May 1916, El Arish in January 1917 and Rafah in March 1917.

The SMR borrowed rolling stock and 70 locomotives from Egyptian State Railways including 20 Robert Stephenson & Co. 0-6-0s, 20 Baldwin 2-6-0s and 15 Baldwin 4-4-0s. The SMR also acquired seven small shunting locomotives: two 0-6-0ST saddle tanks built in 1900 and 1902 that J. Aird & Co. had been using on a civil engineering project in Egypt (probably the Assiut Barrage), four 0-6-0ST's that had been built in 1917 for the Inland Waterways and Docks Department in Britain and one German 0-6-0WT that was part of the cargo of a merchant ship that the Royal Navy captured in 1914. The German locomotive had been built by Hanomag in Hanover in 1913 and all the saddle tanks had been built by Manning Wardle in Leeds, England.

Palestine Military Railway

The EEF captured Beersheba in October 1917 and Gaza in November. EEF engineers extended the SMR to Deir Seneid by the end of November 1917 and a branch to Beersheba by May 1918. From Deir Seneid, EEF engineers worked northwards converting the Ottoman tracks to standard gauge, reaching Lydda by February 1918, converting the branch to Jerusalem by June and continuing as far as Tulkarm on the Eastern Railway. From there they built the standard gauge line on a new route northwest to the coast and then northwards, reaching Haifa by the end of 1918.

Read the full text

As the EEF advanced into Palestine it formed a new organisation, the Palestine Military Railway, to operate the various railways of various gauges that came under its control. Royal Engineers units restored Palestine's railways to working condition. The PMR laid a number of temporary 600 mm (1 ft 11+5⁄8 in) narrow gauge lines, including one between Lydda and Jaffa on the J&J trackbed from which the Ottoman army had removed the 1,000 mm (3 ft 3+3⁄8 in) metre gauge track in 1915. The PMR borrowed several 3 ft 6 in (1,067 mm) locomotives to work the 1,050 mm (3 ft 5+11⁄32 in) narrow gauge tracks, which were a very tight fit.

1936–1939 Arab Revolt

In 1936–1939 Palestinian Arabs opposed to Jewish mass immigration revolted against British rule. Railways were a particular target for sabotage. The British built blockhouses to protect bridges and regular military patrols of railway lines. Patrols were initially on foot, then in armoured freight vans propelled by locomotives with armoured cabs, and finally with dozens of rail-mounted armoured cars built at Qishon works. After one was blown up by a mine, killing a soldier, the front of each armoured car was fitted with a long bar propelling a pony truck intended to detonate any mine safely without injuring any of the armoured car's occupants. British soldiers made Arab hostages ride on the pony truck so that any mine would be likely to kill them.

Security measures failed to stop attacks on the railway. One attack damaged a Sentinel railcar. In October 1937 a more serious attack damaged a passenger train and prompted a further decline in passenger numbers. In 1938 sabotage derailed 44 trains, damaged 33 rail-mounted armoured cars, destroyed 27 stations and other buildings, damaged 21 bridges and culverts and destroyed telephone and signalling equipment and water supplies. A member of the Survey of Palestine recalled that "nearly all the stations on the railway had been burnt". For more than one period night running became so dangerous that it was suspended. In September 1938 first the Jerusalem line and then El Kantara line were closed by extensive sabotage. After the latter was reopened in October, Haifa – El Kantara trains were run only three days per week compared with the previous daily service. The worst year was 1938, in which 13 railway workers were killed and 123 injured.

1945–1948

Most ROD and S200 locomotives were withdrawn from Palestine before the end of the Second World War and the remaining few soon followed, but PR took 24 LMS 8F's and the two S100s into its locomotive fleet.

In 1945 Zionist paramilitary organisations formed an alliance, the Jewish Resistance Movement, which launched a war against British administration in which members of the Palmach, Irgun and Lehi organisations sabotaged the PR network at 153 places throughout Palestine. Terrorists robbed a train delivering wages to railway staff. In 1946 a terrorist bomb demolished the main part of the Haifa East station building. In the Night of the Bridges of 16–17 June that year, Palmach saboteurs destroyed 11 road and rail links with neighbouring countries including PR's 1,435 mm (4 ft 8+1⁄2 in) standard gauge links with Egypt and Lebanon and its 1,050 mm (3 ft 5+11⁄32 in) gauge link with Syria.

On 22 April 1947, terrorists blew up an El Kantara – Haifa train near Rehovot, killing five British soldiers and a number of civilians. As security deteriorated, theft from the railway increased. British security forces failed to intervene to protect the railway and in some cases took part in looting its assets. In January 1948 the General Manager, Arthur Kirby, vainly pleaded with Sir Henry Gurney, Chief Secretary of the Mandate Government, for adequate armed protection for the railway and its 6,000 staff, otherwise they would cease to do their duty and "I cannot guarantee to keep the railways operating". In February Kirby noted:

...locomotives wrecked by mines have been repaired time and time again so that most of them, though blown up several times, are still working after 28 years of service – and working efficiently... We have no fewer than 50 personnel of the train crews absent from duty, some in hospital, suffering from the effects of having been interfered with while trying to perform their duty. Men have been killed while performing their duties. Running trains are subject to attack and the principal marshalling depot is constantly being fired over by snipers... [but] so long as the present Railway Management exists, it will endeavour to maintain the railways and ports as fully as possible without fear or favour and irrespective of politics.

On 31 March 1948 another train was blown up by a terrorist mine near Binyamina south of Haifa, killing 40 civilians and wounding 60. By April 1948 Kirby described snipers' and saboteurs' killing of railway staff as "incessant". In 1948 terrorists attacked PR's head office, Khoury House in Haifa, and the resulting fire badly damaged the accounts department. PR's telephone and telegraph network was destroyed and Jewish terrorists stole Kirby's car at gunpoint.

Kirby instructed his staff:

The intention of the Management is that the Railways will be kept in operation and handed over on 15th May as a going concern. The severe loss of Khoury House, Headquarters, and the secession of Arab staff in Haifa will not interfere with this intention... All staff reporting for duty will be allocated to the best advantage, irrespective of the Branch in which they have been hitherto employed...

Privately Kirby wrote to Gurney:

I have been expected to carry on the railways and ports under almost impossible conditions; I have taken upon myself risks and responsibilities that have seldom, if ever befallen the General Manager of a Colonial Railway; I have achieved more than could have been hoped for....

From Wikipedia’s article on Palestine Railways, shared under CC BY-SA 4.0.3

Products and brands

Operations

In April 1920 the San Remo conference mandated the United Kingdom to administer Palestine: a decision endorsed by a League of Nations mandate in 1922. In October 1920 railway administration was duly transferred from the military PMR to a new company, Palestine Railways (PR), owned by the British Mandate government. Throughout the military operations of the Ottoman and British Empires the Jaffa – Jerusalem railway had remained the property of the French Société du Chemin de Fer Ottoman de Jaffa à Jérusalem et Prolongements. The French sought £1.5 million from the British for the J&J but after arbitration accepted £565,000 paid in instalments. The Lydda – Jaffa section was converted from 600mm gauge to standard gauge and reopened in September 1920.

As PR's north-south main line had laid speedily for military purposes and its Jaffa – Jerusalem and Jezreel Valley lines were steeply graded, its trains were not very fast. Its highest speed limit was 50 miles per hour (80 km/h) and even its best trains achieved less than 30 miles per hour (48 km/h) overall between termini.

From 1920 PR developed a daily Haifa – El Kantara mixed traffic service. Wagons-Lits provided restaurant and sleeping cars three days per week until 1923, when this luxury service was increased to daily.

Palestine lacked a deep-water seaport until 1933 when one was built at Haifa. Until then, cargo that Palestinian ports could not handle would pass through Port Said in Egypt. Egyptian State Railways carried the freight between Port Said and El Kantara and PR carried it between El Kantara East and Palestine. No bridge was built across the Suez Canal until 1941, so freight was ferried across the canal between the ESR and PR stations on opposite banks at El Kantara. This would have included deliveries of locomotives and rolling stock to PR.

Read the full text

PR passenger traffic declined significantly in the 1920s and '30s. The competition from increasing numbers of private cars reduced first-class and then second-class passenger traffic, such that by 1934, 95% of remaining passengers were third-class. The onset of the Great Depression in 1929 badly affected tourist traffic, from which the PR never recovered.

World War II extensions and operations

During the Second World War traffic on PR increased dramatically from 1940 to 1945. The PR main line was a supply route for the North African Campaign that lasted from the Italian attack on Egypt in 1940 until the German surrender in Tunisia in May 1943. In April – May 1941 the Italian air force and German Luftwaffe used Vichy French air bases in the mandated territories of Syria and Lebanon as staging posts to support Rashid Ali's coup d'état against Iraq's pro-British government. British and Empire forces landed in southern Iraq and overthrew the coup in the brief Anglo-Iraqi War of May 1941. Then in June and July 1941 PR served as a supply route for the British Empire invasion of Vichy Syria and Lebanon.

PR suffered relatively few enemy air attacks. In 1941 Haifa suffered several air raids, one of which left an unexploded bomb within a few yards of the line. The last significant air attack on the railway was late in 1942, damaging the rail link to Haifa port. The attacks killed one railway worker and wounded ten more.

Suez canal area

In June 1941 Australian Army Engineers started building a line alongside the Suez Canal southwards from PR's terminus at El Kantara. In July 1941 they connected the new line with Egyptian State Railways (ESR) by a swing bridge at El Ferdan across the canal. In August 1941 PR started operating a through service between Haifa and Cairo. Construction of the line beside the canal continued until July 1942 when it reached El Shatt. ESR then took over operation of the completed route.

Haifa – Beirut – Tripoli (HBT) line

South African Army engineers built the first section of a new Haifa – Beirut – Tripoli (HBT) railway, branching off the 1050 mm gauge Haifa – Acre line and running along the rocky coast and through two tunnels to Beirut. For its construction the HBT initially used 1050 mm gauge track throughout the Haifa – Beirut section for through running of traffic carrying railway construction materials. The South Africans were transferred to other duties and the Haifa – Beirut section was completed by the New Zealand Railway Group. The New Zealand Railway Group also operated the 1050 mm gauge Jezreel Valley railway between Haifa and Daraa on the Syrian border, the Daraa – Damascus section of the 1050 mm gauge Hejaz Railway main line and 60 miles (97 km) of branch lines including the 1050 mm line between Afula on the Jezreel Valley railway, Nablus, and Tulkarm on the main line between Haifa and Lydda. The Afula – Mas'udiya service ended in 1932, and the Tulkarm – Mas'udiya – Nablus service in 1938, except for a 5 km dual gauge section between Tulkarm and the ballast quarries at Nur Shams.

By August 1942, the Haifa – Beirut section was complete, the track was converted to standard gauge, and the stretch between Haifa and Acre, which was shared with the Jezreel Valley railway, to dual gauge. The new railway line started carrying through military traffic between Egypt, Palestine and Lebanon. By then Australian Royal Engineers were already building the Beirut – Tripoli section, which they completed in December 1942. PR operated the HBT between Haifa and Az-Zeeb just south of the Lebanese border and the British military Middle East Command operated the HBT between Az-Zeeb and Tripoli.

Traffic growth

Completion of the Ferdan bridge and HBT hugely enhanced PR's strategic role. PR's annual freight traffic grew from 858,995 tons in 1940-41 to 2,194,848 tons in 1943-44. The huge growth in the number of trains increased the potential for accidents. There were three head-on collisions and in 1942 six H class 4-6-0s were written off in accidents. The war effort both increased wear on equipment and reduced resources for maintenance. In November 1944 a downpour derailed an El Kantara – Haifa train, killing seven people and injuring 40.

From Wikipedia’s article on Palestine Railways, shared under CC BY-SA 4.0.3

Acquisitions

  1. Succeeded British military railways in Palestine1

Timeline

  1. Apr 1948Dissolved Dissolved1
  2. 1920Founded Founded1

Sources

The numbers on this page point here. Each one links to the record it came from.

  1. 1
  2. 2
  3. 3
  4. 4