San Cristóbal mine is a mine in Lipez, Potosí, Bolivia, founded in 2000.2 It is headquartered in Nor Lípez Province.1 Wikipedia text CC BY-SA 4.0

Last updated Oct 21, 2026.

Overview

2000Founded1
Bolivia Map
Photo: Jacobsen, H.S., et al, Public domain, via Wikimedia Commons5

The story

In 1994, Andean Silver Corporation, Andean American Gold and its subsidiary ASC Bolivia LDC were established to develop mining projects in South America. Through an alliance with MINTEC, a leading Bolivian consulting firm in the mining sector, the company obtained an option to purchase concessions from the San Cristóbal and Toldos groups.

Initial drilling activities began in August 1996, when Apex Silver Mines was created to acquire and develop silver, zinc and lead mining projects worldwide.

In February 2000, Minera San Cristóbal S.A. was incorporated, and ASC Bolivia LDC transferred all of its mining concessions in the San Cristóbal district to the new company. The company launched a program to build and refurbish mining camps, with significant investments in machinery and equipment.

Between 2001 and 2004, work that had begun in 2000 was halted due to low mineral prices in global markets and the lack of a solution for the power supply. However, in line with its corporate social responsibility policy, MSC continued to support projects benefiting neighboring communities in collaboration with institutions such as the Andean Development Corporation, now CAF – Development Bank of Latin America and the Caribbean. These initiatives included roads, drinking water systems, sewerage and tourism development, among others.

Between 2004 and 2006, construction began on the project’s infrastructure, processing plant and mine preparation works. Due to their scale, these activities represented a significant contribution to the Bolivian economy and served as a driver for development in one of the country’s poorest regions. More than 40 contractors participated in these projects.

In 2005, the final design of the railway line was completed, and MSC was granted the environmental license for the railway.

In 2006, Sumitomo Corporation acquired a 35% stake in MSC from the majority shareholder, Apex Silver Mines Ltd.

In 2007, engineering work was completed, allowing mining operations to begin gradually. The processing plant started operating while the company tested equipment and systems. The first concentrate exports were also carried out.

Read the full text

In 2008, the operation reached its design production targets. Some design modifications were required in the production process to improve the efficiency and quality of the concentrates.

In 2009, MSC operated at 100% of its design capacity. In March of that year, MSC became a wholly owned subsidiary of Sumitomo Corporation.

In 2018, Minera San Cristóbal became the first Bolivian mining company accepted as a member of the International Council on Mining and Metals. This membership reflected the company’s commitment to global principles of sustainable mining, business ethics, respect for human rights and environmental performance.

In 2023, San Cristóbal Mining Inc. completed the acquisition of Minera San Cristóbal S.A. and all associated assets from Sumitomo Corporation under the terms of a share purchase agreement. Through this transaction, the company acquired all issued and outstanding shares of Comercial Metales Blancos AB and SC Minerals Bolivia S.R.L., former Sumitomo subsidiaries that held all ownership interests in MSC.

From Wikipedia’s article on San Cristóbal mine (Bolivia), shared under CC BY-SA 4.0.4

Products and brands

  • silver ore

Listed on Wikidata.1

Operations

The main characteristic of the San Cristóbal deposit is mineralization in the form of thin veins, veinlets and disseminations that together form a low-grade ore body. The operation uses an open-pit mining method, which allows the movement of large volumes of material using modern heavy equipment specifically designed for this type of mining activity.

The Operations Management division oversees the entire operation, including general planning, grid layout of the area to be mined, drilling of blast holes, coordination of laboratory analysis of samples from new areas, delimitation of mineralized blocks, extraction and transportation of materials.

The company uses advanced techniques in sampling, laboratory analysis, geological mapping and topographic surveys to obtain accurate and reliable information about the mine.

Data and information from these studies are managed and analyzed using MineSight software, which serves as the basis for mine planning and operations. The software generates three-dimensional models of the mine reserves, mineralization types and access roads to the open pit. This enables more efficient mining operations while helping minimize environmental impacts.

Read the full text

The Mine Control Center, which uses modern software, is responsible for full visual and computerized control through GPS devices throughout the mining process, from extraction to transportation to the processing plant.

Ore extracted from the open pit is transported in 200-ton trucks to the crushing plant, while waste rock is transported and deposited in designated waste storage areas. Once crushed, the ore is transported by a 1.7-kilometer conveyor belt to the concentration plant.

Production

In 2024, the company achieved 97.07% operational utilization, and 18.13 million tonnes of ore were processed by the SAG mill. Production reached 338,000 wet metric tonnes of zinc-silver concentrate and 103,000 wet metric tonnes of lead-silver concentrate.

Regarding concentrate logistics, MSC transported 27,134 containers and shipped 502,079 tonnes of concentrate through port facilities.

Relocation of the Town

In 1998, negotiations began with the local population to relocate the town, which was located in an area near significant mineral deposits.

A Town Relocation Commission was created and traveled to the nearby cities of Quechisla, Tupiza and Uyuni to study their architectural styles and speak with community leaders about the relocation of the town and the church of San Cristóbal. The company presented a proposal to the population of San Cristóbal, which provided feedback and led to revisions.

On June 9, 1998, the Town Relocation Agreement was signed. The document was ratified by the Prefect of Potosí and the President of the Civic Committee of Potosí. It was also approved by the Vice Ministry of Mining, the municipal mayor and the municipal representative.

To ensure transparency, quality and efficiency, all construction work was supervised by an independent construction company. Community stakeholders participated in the planning and development process.

The new town of San Cristóbal was officially inaugurated in a special ceremony on June 9, 1999. The new community includes a hospital, a chapel, a school, a government house, sports and athletics fields, housing, roads and basic service facilities.

Shortly after the new town was populated, the mining rights were transferred to a new company: Minera San Cristóbal.

Relocation of the Church

The colonial church of the Bolivian town of San Cristóbal was declared a National Monument in December 1967. Although there are no exact records of its construction date, it was already mentioned in chronicles from the 16th century.

In 1998, the company met with the San Cristóbal community to relocate the town to a safe distance from the area where mining operations were to begin. The company invested more than US$400,000 to ensure that the relocation was carried out safely and without incidents. The relocation followed international standards and local traditions for moving religious structures with due reverence and care. Local and regional religious leaders were consulted and contributed significantly to the church relocation process.