Private company
Silver Peak Railroad
The Silver Peak Railroad was built by the Pittsburgh Silver Peak Gold Mining Company after it bought a group of mining properties in 1906 and established a 100 stamp mill at Blair, Nevada, in 1907 to service the mines at Silver Peak, Nevada. The railroad was completed in July 1906, it connected to the Tonopah and Goldfield Railroad at Blair Junction (Historical), located 0.7 mi south of the present Blair Junction US 6/95 and Nevada State Route 265 in the Big Smoky Valley.2 Wikipedia text CC BY-SA 4.0
Last updated Oct 21, 2026.
Overview
See how the biggest companies compare on our leaderboards

The Silver Peak Railroad was built by the Pittsburgh Silver Peak Gold Mining Company after it bought a group of mining properties in 1906 and established a 100 stamp mill at Blair, Nevada, in 1907 to service the mines at Silver Peak, Nevada. The railroad was completed in July 1906, it connected to the Tonopah and Goldfield Railroad at Blair Junction (Historical), located 0.7 mi south of the present Blair Junction US 6/95 and Nevada State Route 265 in the Big Smoky Valley.2
Links
- WikipediaSilver Peak Railroad
- More imagesWikimedia Commons
- WikidataQ48809083
Sources
The numbers on this page point here. Each one links to the record it came from.
- 1WikidataSilver Peak Railroad on Wikidata
- 2WikipediaSilver Peak Railroad on Wikipedia
- 3Wikimedia CommonsSilver Peak Railroad photo by USGS, Public domain