The story
In 1870, the Italian company Mancardi was granted a concession for a railway between Tunis and the Sahel region but due to lack of capital was unable to build it. Instead, the first railway line in Tunisia linked Tunis with La Marsa - today's TGM line - and was inaugurated on 2 August 1872 by Sadok Bey.
Construction of the northern network
In 1872 the British Pickering company was allowed to build a standard gauge railway between Tunis and Jendouba with a concession for 50 years. However, as the plan was not implemented, in 1876, the French Corporation des Batignolles and its subsidiary, the Compagnie des chemins de fer Bône-Guelma, took over. Work started on 30 April 1877. The opening of the first link from Tunis to Tebourba took place on 24 June 1878. The line reached Medjez El Bab on 30 September, Oued Zarga on 30 December, Béja on 1 September 1879, Jendouba on 30 September and Ghardimaou on 30 March 1880. The link with Algeria was completed by 29 September 1884. In 1894, the route was linked to Bizerte. Later links were extended to Béja Mateur (1912) and Tabarka (1922). The French company was granted operational rights until 1922, after which it would be sold to the Tunisian state.
Construction of the southern network
In 1885 considerable deposits of phosphates were discovered in the region of Seldja. In 1897 a concession was granted to the Compagnie des phosphates et des chemins de fer de Sfax-Gafsa (CPCFSG) to mine the mineral and to build rail transport to the port of Sfax. The metre-gauge railway between Sfax and Métlaoui via Gafsa was completed by 1899. It was extended in 1913 to Tozeur and 1916 to Gabès. At the end of the concession, the line was to be returned to the Tunisian State.
In addition, the company was granted a concession to construct a railway between Tunis and Sousse that was built between 1895 and 1899 with branches to the Pont du Fahs, the Cape Bon, Nabeul, Kairouan and Moknine. This portion of the metre-gauge network was complemented by linking up to Fahs Ksar Ghilane (1906) where large holdings of phosphates and iron were found. The link between Sousse and Sfax was closed by 1911. The link to Cap Bon was extended in 1940 to the lignite deposits of El Oudiane. Finally, the connection between Ksar Rhilane in Algeria and the network was completed in 1930 and the strategic link between Haïdra and Kasserine was closed by 1940.
Post World War II
By 1952 the rail network comprised 2044 km including 456 km of standard gauge and 1110 km of metre gauge operated by the Compagnie fermière des chemins de fer tunisiens. Their funding was provided by the state budget with the exception of the line Tunis - Ghardimaou which was acquired in 1922 by the Compagnie des chemins de fer Bône-Guelma. In addition there was the 440 km of metre gauge track operated by the Compagnie des phosphates et des chemins de fer de Sfax-Gafsa and 33 km standard track of the TGM.
After independence in 1956, the Tunisian rail system was reorganised under the newly formed SNCFT, with the exception of TGM. The concession of the CPCFSG expired at the end of 1966 and its rail operation became part of Tunisian Railways on 1 January 1967.
Modern developments
Not shown on the map is the 120 km direct line between Gafsa and Gabès.
In 2004, a new section of line opened from Kalaa Seghira to M'Saaken, enabling through Tunis - Sfax services to avoid Sousse town centre. Until that year, all services passing through Sousse had to pass through the streets and along the seafront at low speed. Most of the Tunis - Sfax route was double-tracked at this time, enabling faster and more-punctual services to operate.
Read the full text
Discussions are underway between Libya and Tunisia about a 150 km standard gauge link from Ras Ajdir on the Libyan border to Gabès. Libya is building a coastal network planned to extend eventually to Egypt that currently terminates at Ras Ajdir. Containers could be transferred to the metre gauge at Gabès at an exchange yard. Standard gauge access to the current Gabès terminus station could be had at the coastal curve 2 km east of the terminus.
Timeline
2008 - Agreement with Libya for link line;
2012 - Electrification of the Tunis - Borj Cedria railway line and the launch of several Hyundai Rotem modern electrical trains.
Proposed lines
Gabès
Medenine
Ras Ajdir border station with Libya and the Libyan Coast Line (construction launched in 2008, suspended since the Arab Spring)
From Wikipedia’s article on Société nationale des chemins de fer tunisiens, shared under CC BY-SA 4.0.4
