Ukrainian Energy Machines

Logo: Turboatom, Public domain, via Wikimedia Commons3

Ukrainian state-owned engineering company

Ukrainian Energy Machines Joint Stock Company "Turboatom", commonly known as just Turboatom (Ukrainian: Турбоатом), is a state enterprise responsible for power engineering in Ukraine. The company specializes in the production and maintenance of steam and other turbines for thermal power stations; nuclear power plants and cogeneration plants; hydraulic turbines for hydroelectric power stations and pumped storage power plants; gas turbines and combined cycle turbines for thermal power plants; and other power equipment.2 It employed 2,760 people in 2026.1 Its products include RO 170-V-180 and RO 170-V-180 turbine-shutoff.1 Wikipedia text CC BY-SA 4.0

Last updated Oct 21, 2026.

Overview

Jan 21, 1934Founded1

Ukrainian Energy Machines Joint Stock Company "Turboatom", commonly known as just Turboatom (Ukrainian: Турбоатом), is a state enterprise responsible for power engineering in Ukraine. The company specializes in the production and maintenance of steam and other turbines for thermal power stations; nuclear power plants and cogeneration plants; hydraulic turbines for hydroelectric power stations and pumped storage power plants; gas turbines and combined cycle turbines for thermal power plants; and other power equipment.2

The story

1929–1940 Foundation and commissioning

On 1 May 1932, the first stage of the turbogenerator plant was commissioned. Its design capacity was consistent with production of 1.5 million kW per year of steam turbines. Four workshops were put into service: blade, tool, workshop of different parts and workshop of discs and diaphragms.

Achievements in 1932 included:

First hydroelectric generator for Dzoraget Hydroelectric Power Station

Diesel-generator set for Turkestan–Siberia Railway

Renovation of 10 regional power plants and 12 turbines with a total capacity of 134 MW

Production of turbine blades that previously were imported from abroad

By the end of 1932, development of the first design of a turbogenerator with a capacity of 50 MW was completed. In early 1933, three more workshops were commissioned: large machining, winding and assembly. At the end of the year, production of 24 types of blades was mastered and turbines were refurbished for Kashira Power Plant and some other power plants.

1940–1950 World War II and postwar years

During World War II, the plant suspended turbine production and began manufacture of defense products, such as mortars, and repaired tanks. The work at the enterprise was suspended only three days before the beginning of the occupation of Kharkiv on 21 October 1941. Meanwhile, an evacuation process was in full swing. During the evacuation, "Turboatom" was divided into several parts. On 23 August 1943, Kharkiv was freed and rehabilitation of the enterprise began.

Read the full text

A team of turbine constructors restored the native plant and continued to manufacture products while also participating in the restoration of municipal services. In late 1944, the plant already had 374 (out of 700) items of machine tools and other production equipment installed in accordance with the plant rehabilitation project. In a year, 250 machine tools were installed and commissioned. The number of workers and employees of the plant rapidly increased from 876 to 1664 persons in a year.

In 1944 for city of Kharkiv were restored and equipped four turbines with total capacity of 68 thousand kW; two turbines with capacity of 22 thousand kilowatt for Kyiv and also erected turbines for Sevastopl, Kaluga, and Shterov Power Station total capacity of 28,200 kW.

Achievements in 1944 included:

Four turbines with a total capacity of 68 thousand kW restored and equipped for the city of Kharkiv

Two turbines with a capacity of 22 thousand kilowatt for Kyiv

Erection of turbines for Sevastopl, Kaluga, and Shterov Power Stations with a total capacity of 28,200 kW

Development of nuclear turbine construction

Turboatom began serial production of MK-30 turbines with a capacity of 30 MW for mining and chemical centers with experimental reactors. The first Kharkiv MK-30 turbine began operations in December 1958 in Tomsk.

In the early 1970s, manufacture of turbines for nuclear power plants with a capacity of 500 MW was approved. This allowed a sharp reduction in capital expenditure on the construction of power plants. Turbines of this type are installed at:

Leningrad Nuclear Power Plant (the world's largest)

Kursk Nuclear Power Plant

Smolensk Nuclear Power Plant

In the 1970s, Turboatom was identified as a leading enterprise in designing and manufacturing powerful steam turbines for nuclear power plants.

In 1982–1985 the company mastered manufacture of steam turbines with a capacity of 1000 MW for the following NPPs:

South Ukraine Nuclear Power Plant

Kalinin Nuclear Power Plant

Zaporizhzhia Nuclear Power Plant

Balakovo Nuclear Power Plant

Rostov Nuclear Power Plant

Kozloduy Nuclear Power Plant (Bulgaria)

From Wikipedia’s article on Turboatom, shared under CC BY-SA 4.0.4

Products and brands

  • RO 170-V-180
  • RO 170-V-180 turbine-shutoff
  • electric motor
  • hydroelectric generator
  • steam turbine
  • turbo generator
  • water turbine

Listed on Wikidata.1

Employees over time

  • 20262,7601

Timeline

  1. Jan 21, 1934Founded Founded1