The story
History
The original Welsh Highland Railway was formed in 1922 from the merger of two companies: the North Wales Narrow Gauge Railways (NWNGR) and the Portmadoc, Beddgelert and South Snowdon Railway (PBSSR), successor to the Portmadoc, Croesor and Beddgelert Tram Railway. It was never a commercial success; the carriages of the 1890s were outdated and uncomfortable for so long a ride, the journey took too long and the service had a reputation for being unreliable.
Forerunners: 1863–1921
The Croesor Tramway had run from Porthmadog since 1863 up into the Croesor Valley and the slate quarries in this area. This was a horse-worked line laid to a nominal 2 ft (610 mm) gauge.
The NWNGR had originally built a 1 ft 11+1⁄2 in (597 mm) narrow-gauge line from a junction with the 4 ft 8+1⁄2 in (1,435 mm) standard gauge London and North Western Railway line at Dinas to Bryngwyn, with a branch from Tryfan Junction via Waunfawr to Llyn Cwellyn (Snowdon Ranger). The line was opened in 1877 and was extended to South Snowdon (Rhyd Ddu) in 1881, a total of 9 miles (14 km). This closed to passengers in 1914 but goods traffic continued up to its absorption by the WHR in 1922.
In 1902, the newly formed PBSSR took over the failed Portmadoc, Croesor and Beddgelert Tram Railway with the aim of extending it to South Snowdon slate quarry in the Nant Gwynant Pass. Work was abandoned by the outbreak of the First World War in 1914, although the tunnels through the Aberglaslyn Pass were mostly completed.
Formation and construction: 1921–1923
The name Welsh Highland Railway first appeared in 1921 when a 1914 light railway order (LRO) was processed. It was originally drawn up by the local Caernarfonshire authorities and aimed to link the PBSSR and NWNGR but had been delayed by the First World War. It was revived by two local politicians and a Scottish distillery owner, Sir John Henderson Stewart. In July 1921, Stewart also obtained control of the Festiniog Railway, to obtain extra rolling stock for the WHR.
The LRO was passed as the Welsh Highland Railway (Light Railway) Order 1922 (SR&O 1922/432), following a public inquiry. The budget was £75,000 and much of the funding was borrowed from the Ministry of Transport and local authorities. According to the historian Peter Johnson, this would become a burden as the railway needed to generate the unlikely sum of £3,750 profit each year to service the debt.
Two further LROs, including the Welsh Highland Railway (Light Railway) Order 1923 (SR&O 1923/275), enabled improvements to the railway's alignment at Beddgelert, a new station site in Porthmadog and a link to the Festiniog Railway. McAlpine & Sons were contracted to refurbish the existing lines and complete the link between Rhyd Ddu and Croesor Junction, thus creating a railway that ran from Dinas to join the Festiniog Railway at Porthmadog. Like the modern day WHR, the railway was opened in stages. The former NWNGR section re-opened on 31 July 1922 and the remainder on 1 June 1923.
Fall into receivership: 1923–1933
The WHR venture was not a success and was beset with problems from the start. Indeed, 1923 was its most successful year. Much hoped-for revenue from quarry traffic never materialised as the slate industry had fallen into decline. Its passenger services were also unsuccessful and could not compete with the local bus services, which often took half the time to complete the same journey. Its rolling stock was out of date, it lacked locomotives and carriages and its marketing was inadequate. In 1924, winter passenger services were discontinued due to poor traffic. A dispute with the Great Western Railway over the costs of the crossing over its line at Porthmadog also caused problems, despite the crossing having been used since 1867 without any charges or problems. The railway even had to resort to escorting passengers across the crossing on foot.
Read the full text
After 1923, it was unable to pay debenture interest and, in 1927, the county council sued and put the railway into receivership. Services continued and by 1933, it was run down and the local authorities decided to close it.
Control by the Festiniog Railway Company: 1934–1937
In 1934, the company agreed to lease the line to the Festiniog Railway Company for 42 years. It was a disaster, with the FR forced to pay rent even if the WHR made a loss.
The FR Co. attempted to change the line's fortunes by re-focussing on the tourist market. This included painting the carriages bright colours, including yellow and blue, and promoting the Aberglaslyn Pass as a destination by renaming Nantmor station as Aberglaslyn. They also tried to promote round trip (return) journeys, with passengers taking the standard gauge line to Dinas, travelling on the WHR and the Festiniog Railway to Blaenau Ffestiniog and then changing again to take the standard gauge railway to their original starting point.
Despite these attempts, the FR Co. was unsuccessful: the last passenger train ran in 1936 and the last goods service in 1937. The early tourist industry did not provide sufficient visitors to make the railway pay, especially during the Depression. Competition from buses, which ran a faster and more regular service from Caernarfon and Beddgelert, also played a part. The last passenger train ran on 5 September 1936 and, in February 1937, the FR decided not to run the WHR again.
Fall into liquidation 1937–1941
As there was no provision for the Ffestiniog Railway Company to hand back its lease and the WHR was bankrupt, the line became dormant. In 1941, the authorities decided to requisition the movable assets for use in the Second World War. Much of the rolling stock was sold off and most of the track was lifted. The Croesor Tramway section was left intact in case the slate quarries re-opened and remained until finally lifted in 1948–9.
In 1943, the Ffestiniog Railway surrendered its lease and, in exchange for £550 compensation, it was allowed to keep 'Single Fairlie' Moel Tryfan (although it only paid £150).
Various legal manoeuvres followed this, including a serious application to turn the route into a long-distance footpath. Although these plans were ultimately unfruitful, the statutory powers ensured that the track bed was kept mainly intact, rather than sold off bit by bit, which would have made restoration much more difficult and potentially expensive. However, some parts, such as the sites of Rhyd Ddu and Dinas stations, were sold off.
Restoration
The Welsh Highland Railway's restoration has a long, complicated and controversial history and includes several court cases and public inquiries.
The origins of the WHRL restoration efforts tentatively began in 1961 after disagreements within the volunteers of the Festiniog Railway. Those volunteers who left the original group and a group of like-minded railway enthusiasts joined to form The Welsh Highland Railway Society. This group is the precursor of what eventually became WHR Ltd., which owns and operates the Welsh Highland Heritage Railway (WHHR). Legal problems meant they were unable to take over the old company so, in the 1970s, the group purchased the former standard gauge exchange sidings (the Beddgelert Siding) near Tremadog Road, Porthmadog, from British Railways to use as a base. In 1980, they began running passenger services over the line that is now known as the Welsh Highland Heritage Railway. They also acquired an original WHR locomotive Russell, which began working passenger services in 1987.
In the mid-1980s, a number of FR Co. employees became concerned about impact of possible competition from a rebuilt WHR and passed this view on to the FR management. In 1987, this resulted in a confidential offer to buy the WHR track bed from the official receiver for £16,000 to prevent the WHR being developed. In 1989, the offer became public, causing a backlash against the FR Co.
In 1990, a change of directors resulted in the FR Co.'s decision to take over the restoration of the WHR. After a long legal battle between the two companies, the FR Co. won control of the WHR track bed and it re-opened the railway in stages, starting in 1997. The line was completed in 2011.
Extension
With Caernarfon Council having a longer-term plan to reinstate the town's rail transport link to Bangor, speculation mounted that the FR/WHR would potentially later extend itself. However, the Ffestiniog Railway wrote to the council in January 2014 to confirm that they would not themselves be supportive of such a scheme in narrow gauge, but supported the reconnection of the town to the national rail network using standard gauge.
Original locomotives
Two locomotives were inherited from the predecessor companies: Moel Tryfan and Russell. When these proved insufficient, Baldwin 590 was acquired by H.F. Stephens and several Festiniog Railway locomotives saw regular use on the Welsh Highland Railway throughout its entire pre-closure existence from 1923 to 1937. 590 was planned to be part of a larger fleet to replace Moel Tryfan and Russell but it gained so little popularity that Stephens never bought another. By 1936 Moel Tryfan was out of use at Boston Lodge. When Russell and 590 were withdrawn the following year, they were placed in Dinas shed, but when the Second World War broke out, the Ministry of War came to see about appropriating them for the war effort. After some examination of the engines and questioning of those who had worked them, Russell (regarded as a good engine) was removed for further use, and 590 (seen as an unreliable, rough rider with difficult controls and inadequate adhesion) was broken up at Dinas. Despite the unpopularity of 590, the WHHR (Porthmadog) is currently refurbishing a similar Baldwin to act as a replica.
During the ownership of the WHR by the Festiniog Railway Company, Moel Tryfan and Russell were cut down to allow them to traverse the Festiniog Railway to Blaenau Ffestiniog. Moel Tryfan proved suitable, but Russell, even in cut down form, was not low or narrow enough to fit the FR's highly restrictive loading gauge. Russell is now owned by WHR Ltd and has been restored to its original profile. 590 notably retained its original form until its demise.
Original
Dinas
Tryfan Junction
Rhostryfan
Bryngwyn
Waunfawr
Bettws Garmon
Salem Halt
Plas-y-Nant
Snowdon Ranger (aka Quellyn Lake)
Rhyd Ddu (aka South Snowdon)
Pitts Head
Hafod Ruffydd Halt
Beddgelert
Nantmor
Hafod-y-Llyn Halt
Hafod Garregog Halt
Croesor Junction
Ynysfor Halt
Pont Croesor
Portmadoc New (1933) station
Portmadoc New (1923) station
Porthmadog Harbour
From Wikipedia’s article on Welsh Highland Railway, shared under CC BY-SA 4.0.3