Private company

MBTA bus

Logo: Massachusetts Bay Transportation Authority, Public domain, via Wikimedia Commons3

Greater Boston bus network

The Massachusetts Bay Transportation Authority (MBTA) operates 150 bus routes in the Greater Boston area. The MBTA has a policy objective to provide transit service within walking distance – defined as 0.25 miles (0.40 km) – for all residents living in areas with population densities greater than 5,000 inhabitants per square mile (1,900/km2) within the MBTA's service district. Much of this service is provided by bus.2 Wikipedia text CC BY-SA 4.0

Last updated Oct 21, 2026.

Overview

1964Founded1
MBTA route 80 bus at School Street, March 2022
Photo: Pi.1415926535, CC BY-SA 4.0, via Wikimedia Commons5

The Massachusetts Bay Transportation Authority (MBTA) operates 150 bus routes in the Greater Boston area. The MBTA has a policy objective to provide transit service within walking distance – defined as 0.25 miles (0.40 km) – for all residents living in areas with population densities greater than 5,000 inhabitants per square mile (1,900/km2) within the MBTA's service district. Much of this service is provided by bus. In 2025, the system had a ridership of 95,156,800, or about 335,300 per weekday as of the second quarter of 2026.2

Corporate structure

MBTA bus is part of a group headed by Massachusetts Bay Transportation Authority. 3 entities, 1 country on record. Switch between the flow chart and the network, and select any entity to see its details.

  • Massachusetts Bay Transportation Authority Boston, Massachusetts, United States
    • MBTA bus
    • Urban Ring Project Subsidiary
    • Courthouse station Owned · Boston, United States
    • Forest Hills station Owned · Forest Hills, United States
    • Green Line B branch Owned · Boston, United States
    • Halifax station Owned · Halifax, United States
    • hardpoint Owned
    • Kingston station Owned · Plymouth County, United States
    • Mattapan Line Owned · Boston, United States
    • Maverick station Owned · East Boston, United States
    • Orange Line Owned · Boston, United States
    • Ruggles station Owned · Boston, United States

Built from parent and subsidiary links from GLEIF, the Global Legal Entity Identifier Foundation (CC0); subsidiaries, stakes and holdings from Wikidata (CC0). Each entity in the chart links to its source.

The story

A number of horsecar lines were built in Boston and surrounding towns in the second half of the 19th century, beginning with the Cambridge Railroad in 1856. Several smaller companies were consolidated into the West End Street Railway in 1887. The West End began electrifying existing lines and constructing new streetcar lines; the last horsecar lines ended in 1900. The West End was purchased in 1897 by the Boston Elevated Railway (BERy), which had been created to build a rapid transit system in Boston. As that system was constructed in the first two decades of the 20th century, many streetcar lines were cut back from downtown Boston to rapid transit stations. Stations like Sullivan Square, Dudley Square, Forest Hills, Harvard, and Andrew were built as transfer stations with easy connections between subway and rapid transit.

Some small companies operated buses in Boston as early as the 1910s. BERy bus service began on February 23, 1922, when buses replaced the North Beacon Street streetcar line. Initial bus routes largely replaced lightly-used streetcar lines or expanded service to new areas. The BERy also attempted in the 1920s to make the Tremont Street streetcar subway operate more like a rapid transit line, using trains of streetcars entering the subway from a small number of feeder lines, rather than single streetcars from numerous surface lines. The Harvard–Lechmere streetcar line was converted to trackless trolley (trolleybus) on April 11, 1936 – the first route in what would become an extensive trackless trolley system.

As increased automobile usage reduced ridership and increased congestion, the BERy and its 1947 replacement Metropolitan Transit Authority (MTA) continued to convert streetcar lines to bus and trolleybus. Most trolleybus lines were replaced by buses in the late 1940s to early 1960s, as buses offered increased flexibility and no need to maintain overhead lines. When the Massachusetts Bay Transportation Authority (MBTA) replaced the MTA in 1964, all surface lines were operated by buses except six streetcar lines (the five Green Line branches plus the Mattapan Line) and four trolleybus lines. The MBTA rebranded many elements of Boston's public transportation network in its first decade. After being found unsuitable in 1965 for the Orange Line because it did not show up well on maps, yellow was chosen for the color of bus operations on January 8, 1972.

The MBTA had primarily been formed to subsidize the suburban commuter rail network. However, the agency also took over unprofitable suburban bus operations – much of which was former streetcar lines – from several private companies. The MBTA took over the Eastern Massachusetts Street Railway in 1968, inheriting large networks based in Lynn and Quincy plus several lines in Norwood and Melrose. (Networks serving Lowell, Lawrence, and Brockton outside the MBTA district were briefly operated by the MBTA. They were transferred to new public agencies: the LRTA in Lowell in 1976, a predecessor of the MVRTA in Lawrence in 1968, and a predecessor of the BAT in Brockton in 1969.) The MBTA began subsidizing Middlesex and Boston Street Railway service based in Newton and Waltham in 1964, and took over the remaining routes in 1972. Five former Service Bus Lines routes in northeast suburbs were taken over in 1975, and a single Brush Hill Transportation line in Milton was taken over in 1980.

The geographic scope of the MBTA bus network has remained relatively constant since these additions, though many services have been created, discontinued, and modified during the MBTA era. The openings of new sections of the Red Line (1971, 1980, 1984–85) and the Orange Line (1975–77, 1987) have resulted in significant changes as routes were modified to serve new transfer stations. Three limited-stop crosstown routes were created in 1994 as a prelude to the Urban Ring Project, a never-implemented circumferential bus rapid transit (BRT) corridor. Silver Line BRT service began in 2002 with conversion of existing bus service on Washington Street, and was expanded in 2004–05 with new routes serving the Waterfront Tunnel in the Seaport District. The latter used dual-mode buses that operated as trolleybuses in the Waterfront Tunnel and as diesel buses on the surface. A second Silver Line service using the Washington Street corridor was added in 2009, and service from the Waterfront Tunnel to Chelsea began in 2018 with a new surface busway in Chelsea.

The BERy and MTA operated overnight Owl service until 1960. From September 2001 to June 2005, the MBTA operated bus service on 17 routes (7 normal bus routes and 10 routes replicating subway lines) until 2:30am on Friday and Saturday nights. Similar service on the key routes was operated from March 2013 to March 2014. In 2017, the MBTA Board rejected a proposal to run all-night service on several routes with pulsed connections at a central hub.

In 2018, the MBTA began planning for the Bus Network Redesign, a reworking of the entire bus network. A draft plan was released in May 2022, with a revised plan in November 2022. That plan was approved in December 2022. It increases overall service by 25%, with a doubling of the number of routes with high-frequency service. The first changes were made on December 15, 2024, in areas northeast of downtown Boston. The second phase is planned to cover most of Boston and Brookline; the third and south phases are tentatively planned to cover northern and southern suburbs. Changes will take place through 2028. The second changes were made on April 5, 2026.

In 2022, the MBTA started cutting bus service due to a driver shortage resulting from a long-term retirement trend accelerated by the COVID-19 pandemic in Massachusetts. Despite paying for training to get a commercial driver's license and offering a $4,500 signing bonus, it ended the year short about 350 drivers, plus about 400 more needed to increase service to implement a proposed bus network redesign. Experts said the shortage was caused by the failure to raise the starting hourly wage, and offer new hires full-time work instead of forcing all of them to start part-time. Drivers were also unhappy about lack of access to bathrooms and "split shifts" with unpaid time between morning and evening rush hour that was too short to go home. The MBTA began hiring operators for full-time work in 2023. The number of bus drivers increased from about 1,350 in mid-2023 to about 1,500 in March 2024.

From Wikipedia’s article on MBTA bus, shared under CC BY-SA 4.0.4

Products and brands

Fleet

This is the current bus roster for the MBTA as of October 2026. All buses are manufactured by New Flyer and are 102 inches (260 cm) wide; most buses are 40-foot (12 m) length, while 117 are 60-foot (18 m) articulated buses. 80 New Flyer 40-foot battery-electric buses were ordered in July 2023. Thirty-two of those buses will have left-side doors for use in the Harvard bus tunnel. 40 additional electric buses were ordered in December 2025 to provide service for the Quincy Bus Maintenance Facility to be opened in 2027; 15 of these buses will be funded with settlement money from Volkswagen from their 2015 "Dieselgate" emissions cheating scandal. State law requires the MBTA to purchase only zero-emission buses after 2029 and mandates a fully-electrified fleet by 2040.

Facilities

MBTA buses are operated out of nine divisions based at eight facilities (the two Charlestown garages share a site).

Replacements

The North Cambridge bus facility, which was used by trackless trolleys until March 2022, is to be modified for battery-electric buses. A $27.3 million contract was issued in October 2023, with completion expected in November 2025. As of December 2025, the garage modifications are complete. Bus service from the garage is expected to start in summer 2026.

Quincy Garage is being replaced with a larger facility near Quincy Adams station. The parcel was purchased for $38.2 million in March 2021. Early work, including demolition of an existing building at the site, was completed in mid-2022. Bids in May 2022 came in higher than expected – $360 million versus $280 million – prompting the MBTA to switch to Construction Management at Risk bidding for the project. As of October 2023, the work is expected to cost $299 million, with substantial completion in March 2027. As of March 2026, the garage is expected to open in summer 2027.

Read the full text

A replacement of Arborway Garage on-site is planned. As of 2023, the plans for the new garage will expand the fleet based there from 118 CNG buses to 200 battery-electric buses, including articulated buses for routes 28, 32, and 39. The project was paused in 2025 due to a lack of funding, and would take 5-6 years to design and build once funded. State funding for the garage was announced in October 2025 as part of an $850 million transfer from the Commonwealth Transportation Fund to the MBTA. As of March 2026, the project is planned to be fully funded in the FY 2027-2031 Capital Investment Plan (CIP). The new garage will support a fully battery-electric fleet, though it is planned to initially operate with a mix of battery-electric buses and hybrids.

In July 2022, the MBTA indicated plans to purchase an adjacent parcel to expand Southampton Garage. In August 2025, the MBTA purchased a site in Medford to replace Fellsway and Lynn garages.

From Wikipedia’s article on MBTA bus, shared under CC BY-SA 4.0.4

Subsidiaries and ownership

Parent company

From Wikidata.1

Timeline

  1. 1964Founded Founded1

Sources

The numbers on this page point here. Each one links to the record it came from.

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5