9007 on Tokyo Stock Exchange

Odakyu Electric Railway

Logo: Syohei Arai (talk), Public domain, via Wikimedia Commons3

Japanese private railway operator

Odakyu Electric Railway Company, Ltd. (Japanese: 小田急電鉄, Hepburn: Odakyū Dentetsu kabushiki gaisha) is a major private railway operator based in Tokyo, Japan, and the core transportation company of the Odakyu Group. The company operates three railway lines: the Odawara Line, its principal route connecting Shinjuku and Odawara; and two branch lines, the Enoshima Line and the Tama Line.2 It was founded by Tsurumatsu Toshimitsu.1 Its chief executive is Kōji Hoshino (since 2017).1 It employed 3,760 people in 2021.1 Its revenue was ¥114 billion in 2021.1 Its shares trade on Tokyo Stock Exchange under the symbol 9007.1 Wikipedia text CC BY-SA 4.0

Price unavailable

Last updated Oct 21, 2026.

Overview

May 1, 1923Founded1

Compare with another stock.

  • Ticker9007 on Tokyo Stock Exchange1
  • Industrypublic transport, rail transport1
  • HeadquartersNishi-Shinjuku1
  • Founded inMarunouchi1
  • Websitewww.odakyu.jp
  • Legal formkabushiki gaisha1
Odakyu Ebina Headquarters
Photo: Akonnchiroll, CC BY-SA 4.0, via Wikimedia Commons5

Odakyu Electric Railway Company, Ltd. (Japanese: 小田急電鉄, Hepburn: Odakyū Dentetsu kabushiki gaisha) is a major private railway operator based in Tokyo, Japan, and the core transportation company of the Odakyu Group. The company operates three railway lines: the Odawara Line, its principal route connecting Shinjuku and Odawara; and two branch lines, the Enoshima Line and the Tama Line.2

Corporate structure

Odakyu Electric Railway sits at the top of its group. 13 entities, 1 country on record. Switch between the flow chart and the network, and select any entity to see its details.

Built from subsidiaries, stakes and holdings from Wikidata (CC0); major holders from Schedules 13D and 13G. Each entity in the chart links to its source.

What it owns

What Odakyu Electric Railway reports owning in its annual reports to the SEC: buildings, land and equipment, real estate and locations, investments, intangible assets and inventory, at the end of its latest fiscal year and a year before.

Stakes and holdings (Wikidata)

  • Odakyu Group
  • Odakyū Enoshima Line
  • Odakyū Odawara Line
  • Odakyū Tama Line

Things Wikidata records the company as owning, with the share when stated.1

The story

Founded by Tsurumatsu Toshimitsu on May 1, 1923, in Marunouchi.1

Pre-WWII

The 83 km (52 mi) line from Shinjuku to Odawara opened for service on 1 April 1927. Unlike the Odawara line, rarely were pre-World War II Japanese private railways constructed with double-track and fully electrified from the first day of operation. Two years later, on 1 April 1929, the Enoshima Line was added.

The original full name of the railroad was Odawara Express Railway Company, Ltd. (小田原急行鉄道株式会社, Odawara Kyūkō Tetsudō kabushiki gaisha), but this was often shortened to Odawara Kyūkō (小田原急行; "Odawara Express"). The abbreviation Odakyu was made popular by the title song of the 1929 movie Tōkyō kōshinkyoku and eventually became the official name of the railroad on March 1, 1941.

On 1 May 1942, Odakyu merged with the Tokyo-Yokohama Electric Railway company (now Tokyu Corporation), which controlled all private railway services west and south of Tokyo by the end of World War II.

Post-WWII

The company regained its independence on June 1, 1948, and it obtained a large amount of Hakone Tozan Railway stocks, instead of separating Keio Inokashira Line for Keio Corporation. Odakyu restarted Non-stop Limited Express service between Shinjuku and Odawara in 1948. In 1950, Odakyu trains ran through to Hakone-Yumoto on Hakone Tozan Line. Odakyu uses 1,067 mm (3 ft 6 in) narrow-gauge tracks, but the Hakone Tozan Railway is 1,435 mm (4 ft 8+1⁄2 in) standard gauge, so one track of the section from Odawara to Hakone-Yumoto (6.1 km (3.8 mi)) was changed to a dual gauge system. Odakyu operated the first Romancecar (1710 series) limited express in 1951.

After the 1950s, due to rapid Japanese economic growth, Odakyu was faced with an explosive increase of population along with its lines. Commuter passengers had to use very crowded trains every morning, and complained strongly with the delay of improvements from the railway company. Odakyu began construction on the - "Shinjuku Station Great Improvement Project" setting 5 lines and 10 platforms long enough for 10 standard commuter cars with service on the Chiyoda Line, among others. Plans for a four-track system in 1964 were prevented by residents of Setagaya Ward in Tokyo, as such the system remains uncompleted. The Setagaya Residents' opposition set the stage for a long-term and remarkable case in the courts and legislature. Odakyu could not take main part of transport from Tama New Town Area, though Odakyu started the operation of Tama Line in 1974. To serve its Mukōgaoka-Yūen Amusement Park, Odakyu operated the Mukōgaoka-Yūen Monorail Line between Mukōgaoka-Yūen and Mukōgaoka-Yūen-Seimon (1.1 km (0.68 mi), 2 stations) beginning in 1966 using a Lockheed Corporation style monorail system; the system was closed in 2001 when the amusement park was shut down.

Post-millennium

Since 2000, Odakyu has been adding track in both directions from Izumi-Tamagawa Station, on Tama River, the border station of Tokyo, to just outside Setagaya-Daita Station for expanding the availability of express trains, especially for morning commuter service. The lines between Setagaya-Daita and Higashi-Kitazawa Station are still under construction, however. Odakyu announced that the bottle-neck will be resolved by 2013.

All of its lines are double- or quadruple-tracked within Tokyo Metropolis as of March 2018, a project first decided in December 1964 but due to NIMBY land acquisition difficulties, complex and expensive workarounds were constructed and finished, taking a half century. The main or Odawara Line acts as a bypass route for the Tōkaidō Main Line from Tokyo to western Kanagawa. The Romancecar 3000 series "SE" was tested at speeds of up to 145 km/h (90 mph) in 1957, achieving a world record for narrow-gauge 1,067 mm (3 ft 6 in) lines at the time. These tests also provided important data on high-speed electric multiple units (EMU), which Japanese National Railways (JNR) used for its limited express EMUs, 151 series, and 0 Series Shinkansen introduced in the early 1960s.

Odakyu celebrated its 80th anniversary in April 2007. The 50th anniversary of the Romancecar was celebrated in September 2007.

Read the full text

Station numbers were introduced to all Odakyu Line stations in 2014, with stations numbered using the prefix "OH".

Odakyu are the current shirt sponsors of football club Machida Zelvia.

On 6 August 2021, a mass stabbing incident occurred on one of its commuter services when a man stabbed nine passengers, seriously injuring a woman before trying to ignite a fire on the compartment. The man escaped and was arrested hours later.

From Wikipedia’s article on Odakyu Electric Railway, shared under CC BY-SA 4.0.4

Leadership

Who has led Odakyu Electric Railway, and when. Pick a name to see everywhere that person has worked.

197019801990200020102020

Products and brands

Shinjuku Station routes

Commuter service is shown on each line's page.

Mt. Fuji trains run on the connecting branch line just before Shin-Matsuda from Shinjuku and stops at Matsuda on the Gotemba Line. Matsuda and Shin-Matsuda are treated as the same station.

Home Way trains run from Shinjuku every evening after 18:00. There is no service to Shinjuku.

Tokyo Metro routes

Commuter services are shown on each line's page.

Read the full text

At Yoyogi-Uehara, all trains pause, but there is no service for passengers; Odakyu and Tokyo Metro change their operating staff at the station.

On weekday mornings, Metro Sagami trains run once from Hon-Atsugi to Kita-Senju.

On weekday evenings, Metro Homeway trains run twice from Hon-Atsugi to Kita-Senju and once from Ōtemachi to Hon-Atsugi.

On weekends and holidays, Metro Hakone trains run between Kita-Senju and Hakone-Yumoto four times; Metro Sagami (once in the morning) and Metro Homeway (once in the evening) trains also run between Kita-Senju and Hon-Atsugi.

From Wikipedia’s article on Odakyu Electric Railway, shared under CC BY-SA 4.0.4

Subsidiaries and ownership

Subsidiaries

Also owns

  • Odakyu Group
  • Odakyū Enoshima Line
  • Odakyū Odawara Line
  • Odakyū Tama Line

From Wikidata.1

Employees over time

  • 20213,7601

Revenue over time

As stated on Wikidata, in the currency reported.

Revenue

  • 2021114.4B JPY1

Net income

  • 2021-19.7B JPY1

Timeline

  1. Apr 1, 2017New chief executive Kōji Hoshino becomes CEO1
  2. May 16, 1949Went public Listed on Tokyo Stock Exchange1
  3. May 1, 1923Founded Founded in Marunouchi1