How it started
History
GE Aviation Czech was established in July 2007. In 2008, General Electric acquired selected assets of Walter Aircraft Engines, a Prague-based manufacturer founded in 1911. Production moved from Walter's former factory in Jinonice to a new facility in Letňany, which opened in 2009.
GE based its new H80 engine on the Walter M601, replacing the compressor and making several other changes to the design. The H80 was certified in Europe in December 2011 and went into production in 2012. The H-Series was later expanded with the H75 and H85 models.
In 2016, GE announced plans for a new turboprop engine development and manufacturing centre in the Czech Republic. The project was expected to create 500 jobs, with Catalyst production scheduled to begin by the end of 2022. These plans were later scaled back. Rather than build a separate factory, GE decided to manufacture the Catalyst at its existing Letňany facility.
By 2025, the company had added approximately 100 jobs over the preceding decade. Avio Aero reported that around $50 million had been invested in Prague over the previous five years. GE never applied for the investment incentive offered by the Czech government, according to the Ministry of Industry and Trade.
GE continued investing in its existing factory in Letňany. In March 2026, it announced plans to spend another €8 million on new production equipment, inspection technology and upgrades to the factory.
From Wikipedia’s article on GE Aviation Czech, shared under CC BY-SA 4.0.2