Hydro One Limited is an electricity transmission and distribution utility serving the Canadian province of Ontario. Hydro One traces its history to the early 20th century and the establishment of the Hydro-Electric Power Commission of Ontario (renamed "Ontario Hydro" in 1974). In October 1998, the provincial legislature passed the Energy Competition Act which restructured Ontario Hydro into separate entities responsible for electrical generation, transmission/delivery, and price management with a final goal of total privatization.3 It is headquartered in Toronto.1 Its shares trade on OTC under the symbol HRNNF.1 Wikipedia text CC BY-SA 4.0

Price unavailable

Last updated Oct 21, 2026.

Overview

9.0BRevenue, fiscal 20256
1.3BNet income, fiscal 20256
1999Founded1

Compare with Emera, Fortis Inc. or TransAlta Corporation, or pick any stock.

  • TickerHRNNF on OTC1
  • Industryelectric power industry1
  • HeadquartersToronto1
  • Founded inToronto1
  • Websitewww.hydroone.com
  • Legal formBusiness corporations (which includes professional corporations)1
  • Listed onOTC Markets Group (HRNNF), Toronto Stock Exchange (H)1
  • LEI549300X54QEYZVDC8R044
  • StatusActive4
  • LEI statusIssued and current4
  • Registered address8th Floor, M5G 2P5 Toronto, Canada4
  • Registered withMinistry of Government and Consumer Services, 13282034
HydroOneTorontoHeadOffice
Photo: Raysonho @ Open Grid Scheduler / Grid Engine, CC0, via Wikimedia Commons8

Hydro One Limited is an electricity transmission and distribution utility serving the Canadian province of Ontario. Hydro One traces its history to the early 20th century and the establishment of the Hydro-Electric Power Commission of Ontario (renamed "Ontario Hydro" in 1974). In October 1998, the provincial legislature passed the Energy Competition Act which restructured Ontario Hydro into separate entities responsible for electrical generation, transmission/delivery, and price management with a final goal of total privatization.3

Financials

From the company’s reports to the SEC. Every number links to the filing it came from. Figures are in CAD, the currency the company reports in.

Key numbers, fiscal 2025

24.8%Operating margin6
14.9%Net margin6
6.6%Revenue growth, 20256
10.7%Return on equity6
1.43×Debt to equity6
-275.0M CADFree cash flow6

What sells

Revenue by product, business segment and region, as the company reports it to the SEC.

Products and services

Electric Distribution brought in 73% of the revenue Hydro One broke down this way in fiscal 2025.

  1. Electric Distribution6.6B CAD673%up 6% from 2024
  2. Electric Transmission2.4B CAD627%up 7% from 2024
  3. Other Revenue55.0M CAD61%up 38% from 2024
Products and services by year
Products and services20242025
Electric Distribution6.2B CAD6.6B CAD
Electric Transmission2.3B CAD2.4B CAD
Other Revenue40.0M CAD55.0M CAD

Business segments

Distribution Business brought in 73% of the revenue Hydro One broke down this way in fiscal 2025.

  1. Distribution Business6.6B CAD673%up 6% from 2024
  2. Transmission Business2.4B CAD627%up 7% from 2024
  3. Corporate Segment and Other Operating55.0M CAD61%up 38% from 2024
Business segments by year
Business segments20242025
Distribution Business6.2B CAD6.6B CAD
Transmission Business2.3B CAD2.4B CAD
Corporate Segment and Other Operating40.0M CAD55.0M CAD

Where the money goes

Where each dollar of revenue went, fiscal 2025

  • Cost of revenue50¢4.5B CAD
  • Other costs33¢3.0B CAD
  • Income tax2¢219.0M CAD
  • Profit15¢1.3B CAD

Out of 9.0B CAD in revenue.6

Where each dollar of operating cash went, fiscal 2025

  • Capital spending79¢3.0B CAD
  • Dividends paid21¢788.0M CAD

Out of 2.7B CAD of cash from operations. Spending exceeded cash from operations; the rest came from savings or borrowing.6

Financial statements

Revenue9101112131469.0B CAD in 2025+47% since 2018
02.5B CAD5.0B CAD7.5B CAD10.0B CAD2018: 6.2B CAD6.2B CAD20182019: 6.5B CAD6.5B CAD2019+5%2020: 7.3B CAD7.3B CAD2020+12%2021: 7.2B CAD7.2B CAD2021−1%2022: 7.8B CAD7.8B CAD2022+8%2023: 7.8B CAD7.8B CAD2023+1%2024: 8.5B CAD8.5B CAD2024+8%2025: 9.0B CAD9.0B CAD2025+7%
Operating income9101112131462.2B CAD in 2025+71% since 2018
01.0B CAD2.0B CAD3.0B CAD2018: 1.3B CAD1.3B CAD20182019: 1.3B CAD1.3B CAD2019+0%2020: 1.5B CAD1.5B CAD2020+13%2021: 1.6B CAD1.6B CAD2021+9%2022: 1.8B CAD1.8B CAD2022+14%2023: 1.8B CAD1.8B CAD2023+1%2024: 2.0B CAD2.0B CAD2024+7%2025: 2.2B CAD2.2B CAD2025+14%
Net income91011131461.3B CAD in 2025
-500.0M CAD0500.0M CAD1.0B CAD1.5B CAD2.0B CAD2018: -65.0M CAD-65.0M CAD20182019: 802.0M CAD802.0M CAD20192020: 1.8B CAD1.8B CAD2020+124%2021: 973.0M CAD973.0M CAD2021−46%2022: 1.1B CAD1.1B CAD2022+9%2023: 1.1B CAD1.1B CAD2023+3%2024: 1.2B CAD1.2B CAD2024+6%2025: 1.3B CAD1.3B CAD2025+16%

Every line of the income statement as filed: the last 2 fiscal years, latest first.6

Period ending2025-12-312024-12-31
Operation, maintenance and administration (Note 27)1.2B CAD1.3B CAD
Depreciation, amortization and asset removal costs (Note 4)1.1B CAD1.1B CAD
Total costs6.8B CAD6.5B CAD
Income before financing charges, equity income and income tax expense2.2B CAD2.0B CAD
Financing charges (Note 5)679.0M CAD621.0M CAD
Equity income (Note12)9.0M CAD0 CAD
Income before income tax expense1.6B CAD1.3B CAD
Income tax expense (Note 6)219.0M CAD181.0M CAD
Net income1.3B CAD1.2B CAD
Other comprehensive income (loss)3.0M CAD-9.0M CAD
Comprehensive income1.4B CAD1.2B CAD
Noncontrolling interest (Note 26)10.0M CAD9.0M CAD
Common shareholders1.3B CAD1.2B CAD
Noncontrolling interest (Note 26)10.0M CAD9.0M CAD
Common shareholders1.3B CAD1.1B CAD
Basic (in dollars per share)2.23 CAD1.93 CAD
Diluted (in dollars per share)2.23 CAD1.92 CAD
Dividends per common share declared (Note 24) (in dollars per share)1.31 CAD1.24 CAD
Revenues9.0B CAD8.5B CAD
Purchased power4.5B CAD4.1B CAD

Compare Hydro One with another company

Corporate structure

Hydro One is part of a group headed by HYDRO ONE LIMITED. 3 entities, 1 country on record. Switch between the flow chart and the network, and select any entity to see its details.

  • HYDRO ONE LIMITED Toronto, Ontario, Canada
    • Hydro One 100% · Toronto, Canada
    • HYDRO ONE HOLDINGS LIMITED Subsidiary · Toronto, Ontario, Canada

Built from parent and subsidiary links from GLEIF, the Global Legal Entity Identifier Foundation (CC0). Each entity in the chart links to its source.

What it owns

What Hydro One reports owning in its annual reports to the SEC: buildings, land and equipment, real estate and locations, investments, intangible assets and inventory, at the end of its latest fiscal year and a year before.

Property and equipment

ItemLatestA year beforeChange
Construction in progress2.6B CAD15 Dec 31, 20252.1B CAD15 Dec 31, 2024+23.0%
Property and equipment, before depreciation43.7B CAD15 Dec 31, 202541.1B CAD15 Dec 31, 2024+6.2%
Accumulated depreciation15.0B CAD15 Dec 31, 202514.3B CAD15 Dec 31, 2024+4.8%
Property and equipment, net31.3B CAD15 Dec 31, 202529.0B CAD15 Dec 31, 2024+8.1%
Operating-lease assets (leased space)42.0M CAD15 Dec 31, 202554.0M CAD15 Dec 31, 2024−22.2%

Investments

ItemLatestA year beforeChange
Cash and cash equivalents521.0M CAD15 Dec 31, 2025690.0M CAD15 Dec 31, 2024−24.5%

Intangibles and goodwill

ItemLatestA year beforeChange
Goodwill373.0M CAD15 Dec 31, 2025373.0M CAD15 Dec 31, 20240%
Intangible assets, net (excluding goodwill)650.0M CAD15 Dec 31, 2025656.0M CAD15 Dec 31, 2024−0.9%
Finite-lived intangibles, gross1.6B CAD15 Dec 31, 20251.5B CAD15 Dec 31, 2024+7.0%
Accumulated amortization964.0M CAD15 Dec 31, 2025876.0M CAD15 Dec 31, 2024+10.0%
Finite-lived intangibles, net650.0M CAD15 Dec 31, 2025656.0M CAD15 Dec 31, 2024−0.9%

The story

System information

Hydro One's transmission line voltages are 500,000, 230,000 and 115,000 volts AC. Hydro One has interconnections with Manitoba Hydro, Hydro-Québec, Minnesota Power, DTE Energy/ITC, National Grid (the former Niagara Mohawk Power) and the New York Power Authority.

Generators

Hydro One works with the transmission and distribution network by connecting generating facilities operated by Ontario Power Generation, Bruce Power, and a number of other privately owned companies, to it. The generators deliver the electricity they generate at hydroelectric, natural gas, wind, solar and nuclear facilities to businesses and people across Ontario. The generators have different responsibilities than Hydro One. The power from generators connected to Hydro One's high voltage system is transformed to more than 50 kV (50,000 volts). The transmission-connected generators are registered with the Independent Electricity System Operator (IESO). Transmission lines, strung between metal towers or concrete poles, are not as plentiful as their distribution lines, which are most commonly strung between wooden poles. The distribution system is connected to Hydro One's generating facilities. It delivers the electricity generated at hydroelectric, wind and other facilities to businesses and people across Ontario. These distribution facilities work at voltages of 50 kV or less.

Ontario's electricity grid is made up of a 29,000 km high-voltage transmission network that delivers electricity to large industrial customers and municipal utilities and 123,000 km low-voltage distribution system that serves about 1.3 million end use customers mainly in rural service areas and smaller municipal communities in the province. More than 75% of the applications to connect small generators are in Hydro One's rural service territory along the company's distribution system. While Hydro One has connected thousands of small projects to the grid it is approaching their technical limits of the wires and equipment in some rural locations. In these areas there are two issues that limit the number of projects that Hydro One can safely connect without putting the grid in jeopardy. The first issue is the physical limits of the power lines and the second is a phenomenon called 'islanding'. In larger areas that are densely populated, Hydro One's wires are thicker and designed to deliver larger amounts of electricity. In rural areas, Hydro One's distribution wires are smaller, thinner and deliver a smaller amount of electricity because they were designed to serve a much smaller number of customers than in large urban centers. These thinner lines deliver electricity safely and reliably to rural customers and are able to support the connection of small generation projects spread across the line, but these lines become over loaded when more electricity is fed back to the grid than the line was built to deliver. In some areas where the program is extremely popular, many generators want to connect to the same thin line but the line is not able to support the transfer of so much electricity.

The second issue is about islanding. Hydro One's distribution system knows how to protect itself under certain conditions. For instance, during a storm if a tree falls on a line, the system shuts itself down, similar to a circuit breaker. This protects the company's customers and employees from accidentally coming into contact with a live electrical line; it also protects appliances like televisions from uncontrolled surges and drops in voltage. In addition, when there is a fault, the line must be dead. Also when solar panels are attached to such lines, they must also be shut down when there is a fault on the line. If they are not shut down, electricity keeps flowing from the solar panels to all points between the panels. This can create an unsafe condition called islanding, which can put at risk customers, employees, and the equipment drawing power from that line. Hydro One prevents islanding by limiting the amount of generation that the company connects in one area; this ensures that the electrical load is greater than generation at all times. Ontario has moved to smart meters, which could support even more solutions to these problems. By using the company's existing network and working with customers, Hydro One is exploring new ways to deliver the cleaner electricity which Ontarians are helping to generate.

History

Hydro One was created out of the Hydro-Electric Power Commission of Ontario (HEPC or Ontario Hydro), which was established in 1906 by the provincial Power Commission Act to build transmission lines to supply municipal utilities with electricity generated by private companies already operating at Niagara Falls. The first chairman was Adam Beck, minister without portfolio in the provincial government of Sir James P. Whitney. Beck had been an advocate for a publicly owned electricity grid.

The commission's initial responsibility was to build transmission lines in order to supply municipal utilities with power. The power that was being transferred by HEPC was already being generated at Niagara Falls by private companies. Also during 1906, the company appointed Adam Beck as chairman. A year later, Beck and his colleague William Peyton Hubbard fought for the public ownership of the company. Later in 1908, HEPC purchased power from Niagara Falls and sought to transmit this power over its own lines, which at the time, had not been established. The company continued its steady growth for the next few years. and by 1914 HEPC built its first owned power generating station located on the Severn River.

In the early 1920s, HEPC expanded further and became an electricity distributor itself. The company now transmitted to rural areas in addition to municipal utilities. In 1922 the company's first unit of the Chippawa hydroelectric development on the Niagara River began service. Upon the unit's completion in 1925, it was the largest generating station in the world.

HEPC bought the generation and transmission assets of the Electrical Development Corporation, which was the last remaining private power company. In 1926, HEPC entered into a long-term contract with Gatineau Power Company, located in Quebec. These contracts were needed to accommodate a growing demand for power and electricity. However, these same contracts were to become a source of controversy during the Great Depression when there was an overcapacity in the system. The development of the St. Lawrence and Ottawa rivers was stalled by jurisdictional complications. The development of the rivers would have allowed access to a preferred source of power. In 1939 the Quebec contracts were reinstated and the development of the rivers were continued.

Read the full text

In the late 1940s and early 1950s HEPC took a great leap forward with development of hydro-electric potential along the St. Lawrence River. During the mid-1950s HEPC joined all its power stations and transmission systems into one network in order to become more efficient and flexible. Also during the 1950s, hydro-electric development was supplemented by the construction of thermal coal-fired power stations in Toronto. And by the end of the 1950s HEPC began construction of Canada's first extra-high voltage (500,000-volt) transmission lines. This brought power from northern Ontario to demand in southern Ontario. However, these transmission lines would only come into service in 1967. And by the start of the 1970s all of Ontario's power systems had merged, creating a province-wide grid.

In 1974, the Power Corporation Act reorganized the system as a crown corporation called "Ontario Hydro", the name by which it was most usually known.

In 1998, the Progressive Conservative Party (PC) government of Mike Harris passed the Energy Competition Act which authorized the establishment of a market in electricity. In April 1999, Ontario Hydro was re-organized into five successor companies: Ontario Power Generation, the Ontario Hydro Services Company (later renamed Hydro One), the Independent Electricity Market Operator (later renamed the Independent Electricity System Operator), the Electrical Safety Authority, and Ontario Electricity Financial Corporation. The two commercial companies, Ontario Power Generation and Hydro One, were intended to operate as private businesses rather than as crown corporations.

By 2001, Hydro One had acquired 88 municipal utilities. In December 2001 the provincial government announced its intention to sell Hydro One under an initial public offering (IPO), however by April 2002 various groups in opposition to the plan challenged the government in the Ontario Superior Court of Justice, forcing a halt to the IPO.

In 2002, an electricity market began operating. However, critics questioned, among other things, whether the market was truly competitive or could ever become competitive, given that an electricity grid is not a private good. Public dismay at an increase in prices led the government of Harris's successor, Ernie Eves, to freeze electricity prices for residential and small business consumers. This freeze was maintained after the Liberal Party of Dalton McGuinty replaced the PC government in 2003. The freeze was removed and prices were raised in April 2004, and have been increased again subsequently.

In 2017, Hydro One agreed to acquire U.S. energy company Avista for CA$6.7 billion in cash.

In 2018, the annual CA$6.2 million compensation paid to CEO Mayo Schmidt became a campaign issue in the 2018 Ontario election. Progressive Conservative Party leader Doug Ford promised to remove Schmidt if elected, although it was speculated that it would cost CA$10.7 million in severance payments under a clause of "change of control" in Schmidt's contract, which shareholders had approved in May.

The PCs won the election and in July 2018, the newly elected government convinced CEO Mayo Schmidt to retire immediately. News reports indicated that Schmidt would receive a payment of CA$400,000 in lieu of continuing benefits and would also be entitled to receive incentive bonuses for previous years' achievements, Hydro One stock with a value of approximately CA$9 million. His annual pension was estimated as exceeding CA$160,000. The government and other major shareholders in Hydro One then began the process of appointing an entirely new board of directors after accepting the resignation of all previous members. The new Board is searching for a chief executive to replace Schmidt. In the interim, CFO Paul Dobson is serving as acting CEO.

In December 2018 the Washington Utilities and Transportation Commission blocked the purchase of Avista, citing concerns about the independence of Hydro One from the provincial government. Hydro One paid Avista a $103 million termination fee.

In March 2025, Hydro One Networks announced that it completed the acquisition of a 48% interest in the East-West Tie Limited Partnership, which owns the East-West Tie line, a 450-kilometre line between Wawa and Thunder Bay, for CAD 261 million.

From Wikipedia’s article on Hydro One, shared under CC BY-SA 4.0.7

Products and brands

  • electricity

Listed on Wikidata.1

Hydro One is a holding company with four subsidiaries, the largest being Hydro One Networks. It operates 98% of the high voltage transmission grid throughout Ontario, and serves 1.4 million customers primarily in rural areas across the province in its capacity as Ontario's largest distribution utility.

From Wikipedia’s article on Hydro One, shared under CC BY-SA 4.0.7

Subsidiaries and ownership

Parent company (GLEIF)

Ownership links from GLEIF, the Global Legal Entity Identifier Foundation (CC0); each one cites its LEI record.

Acquisitions

  1. Succeeded Ontario Hydro1

Timeline

  1. Dec 31, 2024Parent Directly consolidated by HYDRO ONE LIMITED4
  2. Nov 5, 2015Went public Listed on Toronto Stock Exchange1
  3. 1999Founded Founded in Toronto1

Filings

228 filings to the SEC since October 2021: 10 annual reports, 218 other. The latest 20:

  1. Oct 8, 20266-K EDGAR
  2. Oct 8, 20266-K EDGAR
  3. Sep 14, 20266-K EDGAR
  4. Sep 14, 20266-K EDGAR
  5. Aug 12, 20266-K EDGAR
  6. Aug 12, 20266-K EDGAR
  7. Aug 12, 20266-K EDGAR
  8. Jun 12, 20266-K EDGAR
  9. Jun 12, 20266-K EDGAR
  10. Jun 10, 20266-K EDGAR
  11. Jun 1, 20266-K EDGAR
  12. Jun 1, 20266-K EDGAR
  13. May 27, 20266-K EDGAR
  14. May 22, 20266-K EDGAR
  15. May 22, 2026SUPPL EDGAR
  16. May 21, 20266-K EDGAR
  17. May 21, 20266-K EDGAR
  18. May 20, 2026FWP EDGAR
  19. May 20, 20266-K EDGAR
  20. May 20, 20266-K EDGAR

The 228 filings since October 2021 can be filtered by form type and year here when JavaScript is on.

Every filing from the last five years, summarized. The full record is on SEC EDGAR.

Held by these funds

The largest holders among investment managers' 13F reports for the quarter ending Jun 30, 2026. Change is in shares since the quarter before.

FundSharesValueShare of the fundChange
John G Ullman & Associates Inc29,700$1.2M0.1%No change

13F reports cover disclosed long positions in U.S. stocks only.

SEC filer profile

How Hydro One is registered with the Securities and Exchange Commission, from its EDGAR record and the cover page of its latest annual report.

  • Name on EDGARHYDRO ONE INC2
  • CIK0001114445
  • Incorporated inOntario, Canada16
  • Industry code (SIC)4911 Electric Services2
  • SEC reviewing officeOffice of Energy & Transportation, Division of Corporation Finance2
  • Business address483 Bay Street, South Tower, 8Th Floor, Toronto, A6 M5G 2P52
  • Phone416-345-50002
  • Shares outstanding142,239 as of Dec 31, 202515
  • On EDGAR sinceFeb 19, 20022
  • Filings294 in all: 6-K (252), 40-F (14), SUPPL (6), F-X (4), FWP (3), 15-15D (2), EFFECT (2), F-10 (2)2
    All 17 form types

    25-NSE (1), 305B2 (1), 40-F/A (1), 6-K/A (1), 8-A12B (1), CERTNYS (1), F-1 (1), F-10/A (1), F-X/A (1)

  • Latest filingsAnnual report (40-F) Feb 13, 2026

Securities registered for trading

ClassSymbolExchange
Medium Term NotesHYDO43New York Stock Exchange

From the cover page of the 40-F filed Feb 13, 2026 (Section 12(b) of the Exchange Act).16