HYOR on OTC

HyOrc Corp

HyOrc Corp is an American engineering services company that raised $10,000 in 2025 (SEC Form D).1 It is headquartered in San Diego, California.1

Price unavailable

Last updated Oct 21, 2026.

Overview

Compare with Galenfeha, Inc., OFA Group or Acorn Energy, or pick any stock.

  • TickerHYOR on OTC1
  • IndustryServices-Engineering Services1
  • HeadquartersSan Diego, California1
  • Incorporated inWY2
  • Business address12707 High Bluff Drive 2Nd Fl, San Diego, Ca 921302
  • Filer categoryNon-accelerated filer, Smaller reporting company2
  • Legal formCorporation

Methanol Production – producing green methanol from waste, targeting shipping and fuel blending markets.3 From its latest annual report

Financials

From the company’s reports to the SEC. Every number links to the filing it came from.

Key numbers, fiscal 2025

100.0%Gross margin4
-957.0%Operating margin5
-932.4%Net margin4
-90.4%Revenue growth, 20254
-2.5%Return on equity5

What sells

Revenue by product, business segment and region, as the company reports it to the SEC.

Products and services

Commission Revenue brought in 62% of the revenue HyOrc Corp broke down this way in fiscal 2025.

  1. Commission Revenue$36.5K562%
  2. Engineering Related and Technical Services$22.6K538%down 96% from 2024
Products and services by year
Products and services20242025
Commission Revenue$36.5K
Engineering Related and Technical Services$617.1K$22.6K

Where the money goes

Where each dollar of revenue went, fiscal 2025

  • Selling, general and admin100¢$324.9K

Out of $59.1K in revenue.4 The company lost money this year.

Financial statements

Revenue4$59.1K in 2025−90% since 2024
0$200.0K$400.0K$600.0K$800.0K2024: $617.1K$617.1K20242025: $59.1K$59.1K2025−90%
Operating income65-$565.8K in 2025+329% since 2014
-$2.0M-$1.5M-$1.0M-$500.0K02014: -$132.0K-$132.0K20142024: -$1.6M-$1.6M2024+1137%2025: -$565.8K-$565.8K2025−65%
Net income7854-$551.3K in 2025+318% since 2014
-$2.0M-$1.5M-$1.0M-$500.0K02014: -$132.0K-$132.0K20142015: -$964.3K-$964.3K2015+631%2016: -$31.5K-$31.5K2016−97%2024: -$1.6M-$1.6M2024+5075%2025: -$551.3K-$551.3K2025−66%

Every line of the income statement as filed: the last 3 fiscal years, latest first.5

Period ending2025-12-312024-12-312023-12-31
Net revenues$59.1K$617.1K
General and administrative$324.9K$1.0M
Impairment loss$300.0K$1.2M
Total operating expenses$624.9K$2.2M
Loss from operations-$565.8K-$1.6M
Other income$14.5K
Net loss-$551.3K-$1.6M
Weighted average common stock outstanding - basic733.4M shares685.7M shares
Net loss per common share - basic$0.00$0.00
Net loss per common share - diluted$0.00$0.00
Weighted average number of common shares outstanding733.4M shares685.7M shares655.4M shares

Compare HyOrc Corp with another company

What it owns

What HyOrc Corp reports owning in its annual reports to the SEC: buildings, land and equipment, real estate and locations, investments, intangible assets and inventory, at the end of its latest fiscal year and a year before.

Property and equipment

ItemLatestA year beforeChange
Property and equipment, before depreciation$60.0K5 Dec 31, 2024
Accumulated depreciation$60.0K5 Dec 31, 2024

Investments

ItemLatestA year beforeChange
Cash and cash equivalents$19.4K5 Dec 31, 2025$176.0K5 Dec 31, 2024−89.0%

Intangibles and goodwill

ItemLatestA year beforeChange
Goodwill$15.8M5 Dec 31, 2025$15.8M5 Dec 31, 20240%

Properties, in its own words

Our principal properties are as follows:

1. · Biliran Geothermal Power Plant, Philippines

The rest of Item 2

○ · A 2MW geothermal power facility constructed by our subsidiary, SRE Power, completed in September 2023.

○ · Classified as Work-in-Progress as of December 31, 2025, due to a legal dispute.

○ · Beneficial ownership remains with SRE, though formal transfer to Biliran Geothermal Inc. has not yet occurred due to disputes.

2. · Corporate Headquarters – Houston, Texas

○ · Our corporate office is located at 3050 Post Oak Boulevard, Suite 510-Q60, Houston, Texas.

○ · The office is leased on a short-term basis.

3. · Engineering and Prototyping Activities in India

The Company does not own, lease, or operate any facilities in India.

Certain engineering, prototyping, fabrication, testing, and limited manufacturing services are performed for the Company by Vaigunth Enertek, an independent third-party engineering and fabrication company located in India. These services are provided to SRE Power and its affiliates on a contractual, cost-reimbursable basis.

Vaigunth Enertek historically has provided the following services to the Company:

● · Fabrication and testing of prototype components

● · Engineering and research and development support

● · Limited manufacturing services conducted on a cost basis

The Company does not control Vaigunth Enertek’s facilities, personnel, or operations. The facilities utilized for these services are owned and operated solely by Vaigunth Enertek and are not considered properties of the Company.

The relationship with Vaigunth Enertek is governed by a services agreement under which Vaigunth Enertek provides engineering and fabrication services as requested by the Company. The agreement does not grant the Company any ownership interest in Vaigunth Enertek or its facilities, nor does it create a joint venture or partnership. Compensation is based on agreed service fees or cost-plus arrangements for specific work orders.

4. · Planned Green Methanol Project Sites – Portugal and Europe-wide

HyOrc has entered into a joint venture agreement with Start Lda for the development of waste-to-methanol facilities in Portugal. Certain commercial arrangements, including long-term offtake agreements, remain subject to definitive documentation.

The joint venture plans for the development of a pilot 8 tonne per day (TPD) methanol production facility in Porto, where HyOrc will provide technology for the project, and Start Lda will provide feedstock, land, permits and green methanol off-takers.

The company plans to expand in phases from 8 TPD to 400 TPD after successful installation of the pilot plant.

The agreement is material to the Company and was previously filed as an exhibit to the Form 10.

The Company has engaged in discussions regarding potential long-term offtake arrangements with a rated biodiesel producer in Portugal, to supply them for a period of 10 years, with the entire methanol production from HyOrc’s pilot plant scheduled to produce 8 tonnes of methanol per day. Binding offtake agreements remain subject to execution of definitive documentation.

Item 2 of the 10-K filed Mar 30, 2026.3

Leadership

Who has led HyOrc Corp, and when. Pick a name to see everywhere that person has worked.

Chief executive

  1. Daniel S. McKinney2012
201520202025
Board members and other officers (1)

Named in SEC Form D filings

People the company listed in its private-offering notices.

  • Executive Officer, DirectorK. Reginald Fubara named May 8, 202511

Former names

  • ASIA PROPERTIES INCOct 16, 2003 to May 26, 20212

Timeline

  1. Sep 17, 20268-K Entered a material agreement12
  2. Aug 10, 20268-K Entered a material agreement; Unregistered sale of shares13
  3. Aug 10, 20268-K Executive or director change14
  4. May 14, 20268-K Entered a material agreement; Unregistered sale of shares15
  5. Apr 10, 20268-K Entered a material agreement16
  6. Mar 24, 20268-K Entered a material agreement17
  7. Mar 19, 20268-K Entered a material agreement; Unregistered sale of shares18
  8. Mar 19, 2012New chief executive Daniel S. McKinney becomes CEO10

Filings

19 filings to the SEC since October 2021: 1 annual reports, 4 quarterly reports, 7 major events, 1 private raises, 6 other. The latest 19:

  1. Oct 8, 202610-Q/A EDGAR
  2. Oct 8, 202610-Q/A EDGAR
  3. Sep 17, 20268-K EDGAR
  4. Aug 10, 20268-K EDGAR
  5. Aug 10, 20268-K EDGAR
  6. Aug 6, 202610-Q EDGAR
  7. May 14, 20268-K EDGAR
  8. May 7, 202610-Q EDGAR
  9. Apr 10, 20268-K EDGAR
  10. Mar 30, 202610-K EDGAR
  11. Mar 24, 20268-K EDGAR
  12. Mar 23, 202610-12G/A EDGAR
  13. Mar 19, 20268-K EDGAR
  14. Feb 25, 202610-12G/A EDGAR
  15. Dec 31, 202510-12G/A EDGAR
  16. Nov 19, 202510-12G/A EDGAR
  17. Oct 8, 202510-12G/A EDGAR
  18. Sep 22, 202510-12G EDGAR
  19. May 8, 2025D EDGAR

Every filing from the last five years, summarized. The full record is on SEC EDGAR.

Money raised

Private offerings the company reported to the SEC on Form D.

  1. Feb 26, 2025Raised $10,000 in a private offering of equity Form D: 1 investor so far Form D

SEC filer profile

How HyOrc Corp is registered with the Securities and Exchange Commission, from its EDGAR record and the cover page of its latest annual report.

  • Name on EDGARHyOrc Corp1
  • CIK0001070789
  • Employer ID (EIN)91-19107913
  • Filer statusNon-accelerated filer not an emerging growth company; a smaller reporting company; a shell company3
  • Incorporated inWyoming3
  • Fiscal year endsDecember 311
  • Industry code (SIC)8711 Services-Engineering Services1
  • SEC reviewing officeOffice of Trade & Services, Division of Corporation Finance1
  • Business address12707 High Bluff Drive 2Nd Fl, San Diego, CA 921301
  • Mailing address114 Magnolia Street, Ste 400-115, Bellingham, WA 982251
  • Phone61935042881
  • Shares outstanding758,010,000 as of Oct 8, 202619
  • Public float$10.2M as of Jun 30, 20253
  • AuditorSuri & Co., Chartered Accountants, Trivandrum, India PCAOB ID 6727; no auditor attestation of internal control over financial reporting3
  • On EDGAR sinceOct 16, 20031
  • Filings96 in all: 10-Q (30), 8-K (25), 10-K (13), 10-Q/A (6), 10-12G/A (5), 15-12G (2), 4 (2), 8-K/A (2)1
    All 17 form types

    NT 10-K (2), UPLOAD (2), 10-12G (1), 10SB12G (1), 10SB12G/A (1), D (1), NT 10-Q (1), RW (1), SB-2 (1)

  • Latest filingsAnnual report (10-K) Mar 30, 2026
    Quarterly report (10-Q) Aug 6, 2026
    Latest 8-K (8-K) Sep 17, 2026

Securities registered for trading

ClassSymbolExchange
CommonHYOR

From the cover page of the 10-K filed Mar 30, 2026 (Section 12(b) of the Exchange Act).3

Risk factors and legal proceedings

Legal proceedings

The Company and its subsidiary SRE Power, Inc. are engaged in legal disputes concerning the Biliran geothermal power project in the Philippines.

Other than the above, we are not a party to any material pending legal proceedings, nor are our properties subject to such proceedings.

The opening of Item 3, Legal Proceedings.3