The story
Līvu Akvapark was opened on 30 December 2003, after two years of construction at a cost of €16 million. In early 2005 construction began on an outdoor water park and in the summer of the same year it was opened to the public. With the outdoor area, Līvu Akvapark's total space was expanded by 7,000 square metres (1.7 acres) bringing it to a total of 18,000 square metres (4.4 acres) making it the largest indoor water park in Northern Europe. In spring of 2007, the construction of a slide tower in the outdoor beach was started. Later, in 2008, an outdoor water fountain was added to celebrate the park's fifth anniversary. In 2012, it saw a complete reconstruction of the spa complex which added a salt chamber, four jacuzzis, a Turkish sauna, oxygen bath and more. In 2014, the outdoor pool was reconstructed and other attractions added. The outdoor pool has a capacity of 700 cubic metres (180,000 US gal), which is a quarter of the whole supply of water in the aqua park.
From Wikipedia’s article on Livu Akvaparks, shared under CC BY-SA 4.0.4

