Private company

Macon and Brunswick Railroad

19th-century line in Georgia, U.S.

The Macon and Brunswick Railroad ran from Macon, Georgia to Brunswick, Georgia. Its construction was interrupted by the American Civil War, and initially only ran from Macon to Cochran, Georgia. The 5 ft (1,524 mm) gauge line was completed and extended to the Georgia coast when it opened in its entirety in December 1869.2 Wikipedia text CC BY-SA 4.0

Last updated Oct 21, 2026.

Overview

  • HeadquartersMacon1
1870 Atlantic & Gulf
Photo: from [1] archive copy at the Wayback Machine, Public domain, via Wikimedia Commons3

The Macon and Brunswick Railroad ran from Macon, Georgia to Brunswick, Georgia. Its construction was interrupted by the American Civil War, and initially only ran from Macon to Cochran, Georgia. The 5 ft (1,524 mm) gauge line was completed and extended to the Georgia coast when it opened in its entirety in December 1869. Construction of the line stimulated the lumber industry along its path, and the founding of new towns and counties.2

How it started

Initial construction and completion

The Macon and Brunswick Railroad Company was granted a charter by the state of in March 1856. The charter allowed for the construction of a line from Brunswick, Georgia or a point along the Atlantic and Gulf Railroad (1856–79) to Macon, Georgia. Arthur E Cochran was named the president of the company during a meeting of stockholders that same year. Surveying for the line began in early 1857. The initial survey was completed by April 1857 by a E. McNeil. Construction was delayed for several years due to a lack of enough funding.

Slave labor was used for the early grading and track laying. Track building was halted during the American Civil War. By 1863, fifty miles of track had been completed from Macon, Georgia to Dykesboro and an additional branch line from Dykesboro to Hawkinsville, Georgia. In March 1865, the Confederate government ordered the seizure of the rails of the Macon and Brunswick to help with the reconstruction of the Macon and Western Railroad, and the company filed suit against the Confederate government. Regular passenger service resumed in June 1865.

In July 1865, Arthur Cochran died and was soon replaced by George H Hazelhurst, former chief engineer of the company. In January 1867, a new survey for the rest of the line was conducted and it was then planned to cross the Atlantic and Gulf rail line at Screven, Georgia. The venture once again faced funding problems, but investors from New York were able to help with the cost of construction. State-backed bonds also helped the financial problems. Construction began from Brunswick to reach the line being simultaneously from Macon in the August 1868. The construction teams consisted primarily of convicts from the convict lease system. In 1869, the company purchased from the city of Macon the old city fairgrounds, which had been used a prisoner of war camp during the American Civil War. As part of the preparation for the completion of the railroad, the company purchased two new locomotives from Hinkley Locomotive Works that were named "Brunswick" and "Macon." This brought their total number of engines at the time to eight. The names of two of the others were "Georgia" and "Corsair."

By September 1869, the line had been completed from Macon to Lumber City, Georgia and the trestle over the Ocmulgee River near Lumber City was nearing completion. The last spike was driven on December 14, 1869 near what has since become Hazlehurst, Georgia. Freight delivery was scheduled to begin the next day. Passenger service began along the line by the middle of January 1870.

Financial decline

From Wikipedia’s article on Macon and Brunswick Railroad, shared under CC BY-SA 4.0.2

Acquisitions

  1. Succeeded by East Tennessee, Virginia and Georgia Railway1

Sources

The numbers on this page point here. Each one links to the record it came from.

  1. 1
  2. 2
  3. 3