The story
The railroad line was originally a main line on the Wabash Railroad 5th District from New Haven, Indiana, to Toledo, Ohio. Subsequent owners included the Norfolk and Western Railway, Norfolk Southern Railway, the Indiana Hi-Rail Corporation and the Maumee & Western Railroad. The line was purchased by Pioneer Railcorp on December 28, 2012, for $5.4 million. In 2019, Pioneer Railcorp was acquired by BRX Transportation Holdings and renamed as Pioneer Lines. In September 2022, Patriot Rail Company LLC purchased Pioneer Lines from BRX Transportation Holdings. In 2023, the railroad was named "Shortline of the Year" by "Railway Age".
"Worst Railroad Tracks in America"
When it purchased the rail line, Pioneer described it as being "in dire need of rehabilitation," Prior to Pioneer's purchase, the line had been dubbed by some as being the "Worst Railroad Tracks in America" due to its poor track conditions. The track conditions were the result of decades of underinvestment in maintenance. The poor conditions were also attributed to the fact that the line had been run through a portion of the former Great Black Swamp and the underlying wetland soils made it difficult to maintain the railroad in good condition.
The conditions were so poor that the entire line was classified as "excepted", the lowest possible track classification. That classification limited track speed to 10 MPH although trains often operated at even slower speeds to limit the number of derailments, which happened frequently. It also limited the height, length and type of cars that could move over the line. Much of the track was old, lightweight 80 pound rail, which restricted the weight of the carloads that could operate over the line.
Rehabilitating the Napoleon, Defiance & Western
Starting with Pioneer taking ownership of the line and with funding assistance from Ohio and Indiana and the federal government, extensive efforts have been made to address the decades of deferred maintenance and to improve the overall state of the railroad. This work started on day one of operations with a focus on replacing decayed ties, broken rails, clearing brush and trees from the railroad right-of-way, putting down ballast and upgrading railroad crossings. In recent years, the work has shifted to replacing the 80 pound rail with more robust rail that can support heavier car loadings.
The pace of improvements accelerated after the purchase of Pioneer RailCorp by BRX Transportation Holdings. The new CEO of Pioneer Lines, Alex Yeros, set a goal to upgrade all of the track owned by Pioneer Lines railroads, to at least Class 1 standards. The current owner, Patriot Rail, has continued the efforts to upgrade all of the main line to Class 1 standards. When the work associated with the Phase 3 CRISI grant is completed, the railroad will have new rail and ties along the entire active portion of the line, and there will be no significant deferred track maintenance remaining.
The list of improvements include:
2013
Phase 1 - Sidings and Track Rehabilitation
New sidings east of Cecil and on the east side of Napoleon
Read the full text
Track rehabilitation of the section of the line between Cecil and Defiance
Funding: $450,000 grant from Ohio Rail Development Commission (ORDC) and $290,000 from NDW
Lafarge
Lafarge added a storage track in their right-of-way north of their Paulding plant to accommodate additional rail traffic to and from their facility.
2014
Phase 2 - Defiance Yard and Track Rehabilitation
Rehabilitate Defiance Yard (work completed in 2019)
Track rehabilitation on the west end of line and of high traffic sections
Funding: $450,000 grant from ORDC and $1 million loan from ORDC
Loan repaid in full in 2019 as part of BRX Transportation Holdings acquisition of the railroad
2016
Railroad crossing closures
Removal of rails and crossing equipment at 7 crossings including US-24 and east along the line into Liberty Center
Funding: ORDC
Track Upgrades
Improvements to the tracks on the system to compensate for ending services to Liberty Center
Funding: ORDC
Transload Facility - Napoleon
Construct a transload facility in Napoleon to serve customers on the portion of the line to Liberty Center that is being taken out of service. This facility also can serve new customers in need of a transload facility.
Funding: $285,000 grant from ORDC and $285,000 from NDW
2020
Consolidated Rail Infrastructure and Safety Improvements (CRISI) grant (Critical Safety Improvements) - Phase 1
Replacement of 10 miles of rail with 132 pound rail from 80 pound rail and replacement of 29,000 ties on 29 miles of track between Woodburn and Defiance
Upgrade track from "excepted" to "Class 1" status
Funding: $4.1 million from U.S. Department of Transportation, $3.8 million from NDW and $250,000 from ODRC
Video highlighting track improvements funded by NDW CRISI Rehabilitation Project
2021
Rail Replacement Project
Replacement of 3 miles of 80 pound rail with 112 pound rail east and west of Okolona (Milepost 40 to Milepost 43)
Relay rail provided by Pioneer Lines from another Pioneer-owned railroad
Funding: $687,000 from ORDC, $192,000 from NDW and $495,000 from NDW/Pioneer from in-kind materials
2022
Public Utilities Commission of Ohio Rail Crossing Safety Upgrade
Install flashing lights and gates at West High Street grade crossing in Defiance County
Funding: 80% from Ohio State Grade Crossing Protection Fund and 20% from NDW, up to a total of $285,000
APackaging Group
Grant towards rail siding access at new facility in Defiance
Funding: $100,000 from ORDC and $628,000 from APackaging Group
Tessenderlo Kerley
Grant towards rail siding access at new Tessenderlo Kerley facility in Defiance
Funding: $75,000 from ORDC with remainder of costs covered by Tessenderlo Kerley.
2023
Railroad Crossing Improvements
Funding: $40,000 from Indiana Department of Transportation
Consolidated Rail Infrastructure and Safety Improvements (CRISI) grant - Phase 2
Replacement of rail from Napoleon to Okolona and Jewell to Defiance and associated improvements
Funding: $9.2 million from U.S. Department of Transportation, $3.7 million from NDW and $264,000 from ODRC
2024
Consolidated Rail Infrastructure and Safety Improvements (CRISI) grant - Phase 3
Replacement of rail and associated improvements from Woodburn, Indiana to Cecil, Ohio and selected locations between Cecil and Defiance
Funding: Up to $12.1 million from U.S. Department of Transportation, $3 million from NDW and $750,000 from ODRC
From Wikipedia’s article on Napoleon, Defiance & Western Railway, shared under CC BY-SA 4.0.3