What Tejon Ranch reports owning in its annual reports to the SEC: buildings, land and equipment, real estate and locations, investments, intangible assets and inventory, at the end of its latest fiscal year and a year before.
Our approximately 270,000 acres include portions of the San Joaquin Valley, portions of the Tehachapi Mountains and portions of the western end of the Antelope Valley. Each of our six reporting segments uses various portions of this land, as indicated in Item 1. A number of key transportation and utility facilities cross our land, including Interstate 5, California Highways 58, 138 and 223, the California Aqueduct (which brings water from Northern California), and various transmission lines for electricity, oil, natural gas and communication systems. Our corporate offices are located on our property.
The rest of Item 2
Approximately 247,000 acres of our land are located in Kern County, California. The Kern County government's general plan, or the General Plan, for this land contemplates continued commercial, resource utilization, farming, grazing and other agricultural uses, as well as certain new developments and uses, including residential and recreational facilities. While the General Plan is intended to provide guidelines for land use and development to third party entities like the Company, it is subject to amendment to accommodate changing circumstances and needs. We have three major master planned real estate projects in Kern County: MV, TRCC and Grapevine.
The remainder of our land, approximately 23,000 acres, is in Los Angeles County. This area is accessible from Interstate 5 via Highway 138. Los Angeles County has adopted general plan policies that contemplate future residential development of portions of this land, subject to further assessments of environmental and infrastructure constraints. The Centennial master planned project is on our lands in Los Angeles County.
Portions of our land consist of mountainous terrain, much of which is not presently served by paved roads or by utility or water lines. Much of this property is included within the RWA we entered into with five major environmental organizations in June 2008. As we receive entitlement approvals over the life span of our developments, we will dedicate conservation easements on 145,000 acres of this land, which will preclude future development of the land. This acreage includes many of the most environmentally sensitive areas of our property and is home to many plant and wildlife species whose environments will remain undisturbed.
Any significant development on our currently undeveloped land would involve the construction of roads, utilities and other expensive infrastructure and would have to be done in a manner that accommodates a number of environmental concerns, including endangered species, wetlands issues, and GHG emissions. Accommodating these environmental concerns, could possibly limit development of portions of the land or result in substantial delays or certain changes to the scope of development in order to obtain governmental approval.
Water Operations
Our existing long-term water contracts with WRMWSD provide for water entitlements and deliveries from the SWP to our agricultural and municipal/industrial operations in the San Joaquin Valley. The terms of these contracts extend to 2035. Under the contracts, we are entitled to annual water for 5,496 acres of land, or 15,547 acre-feet of water subject to SWP allocations, which is adequate for our present farming operations. It is assumed that at the end of the current contract period, all water contracts will be extended for approximately the same amount of annual water.
In addition to the WRMWSD contract water entitlements, we have access to an additional water entitlement from the SWP sufficient to service a substantial amount of future residential and/or commercial development in Kern County. TCWD, a local water district whose service area includes land we own and land we have sold in TRCC, has 5,749 acre-feet of SWP entitlement (also called Table A amount), subject to SWP allocations. In addition, TCWD has 65,199 acre-feet of Company water stored in Kern County water banks for future uses. Both the SWP entitlement and the banked water are the subject of a long-term water supply contract extending to 2035 between TCWD and the Company. TCWD through its contract with the Company supplies water to TRCC, and will be the principal water supplier for any significant mixed-use development in MV. TCWD will also be the water district that provides services to the Grapevine and Centennial projects.
We have a 150-acre water bank consisting of nine ponds on our land in southern Kern County. Water is pumped into these ponds and then percolates into underground aquifers. Since 2006, we have banked 54,728 acre-feet of water from the Antelope Valley-East Kern Water Agency, or AVEK, which has been diverted from the California Aqueduct and is currently retained in this water bank. We anticipate adding additional water to the water bank in the future, as water is available.
Over time, we have also purchased water for our future use or sale. We have secured SWP entitlement under long-term SWP water contracts with the Tulare Lake Basin Water Storage District and the Dudley-Ridge Water District, totaling 3,444 acre-feet of SWP entitlement annually, subject to SWP allocations. Since 2012, these contracts have been held by AVEK for our use and extend through 2035. The Company also has a water purchase agreement that requires the Company to purchase 6,693 acre-feet of water each year from the Nickel Family, LLC, or Nickel, through the Kern County Water Agency.
The initial term of the water purchase agreement with Nickel runs through 2044 and includes a Company option to extend the contract for an additional 35 years. This contract allows us to purchase water each year. The purchase cost of water in 2025 was $986 per acre-foot. Purchase costs are subject to annual cost increases based on the greater of the consumer price index or 3%, resulting in a 2026 purchase cost of $1,021 per acre-foot.